[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983473":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},983473,714,1,"单选题","评标委员会根据综合得分对各投标人进行排名，综合得分相同的，()得分高者排名优先。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","价格",true,{"key":16,"text":17,"correct":18},"B","技术",false,{"key":20,"text":21,"correct":18},"C","商务",{"key":23,"text":24,"correct":18},"D","服务","评标委员会根据综合评分对各投标人进行排名。综合评分相同的，价格得分高者排名优先；价格得分相同的，技术得分高者排名优先，并依照商务、服务及其他评价内容的分项得分优先次序类推。评标委员会应当推荐综合排名第一的投标人为推荐中标人。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购专业实务","建筑工程",0]