[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983428":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},983428,714,1,"单选题","货物投标报价除填写价格汇总表外，还应填写()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","分项报价表",true,{"key":16,"text":17,"correct":18},"B","费用估算明细表",false,{"key":20,"text":21,"correct":18},"C","综合单价分析表",{"key":23,"text":24,"correct":18},"D","供应商明细表","货物投标报价除填写价格汇总表外，还应填写分项报价表。分项报价表中要对主设备及附件、备品备件、专用工具、安装、调试、检验、培训、技术服务等项目逐项填写并报价。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购专业实务","建筑工程",0]