[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983361":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},983361,714,1,"单选题","某公路隧道工程施工项目招标，计划工期320d，施工图样设计比较完善，工程分项清晰，但岩石类型的构成数量难以准确预测和计算，材料的市场价格平稳。该项目招标宜采用()合同。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","固定总价",false,{"key":16,"text":17,"correct":14},"B","固定单价",{"key":19,"text":20,"correct":14},"C","可调价格",{"key":22,"text":23,"correct":24},"D","成本加酬金",true,"成本加酬金合同是指合同价格中工程成本按照实际发生额计算确定和支付，承包人的酬金可以按照合同双方约定额度或者比例的工程管理服务费和利润额计算确定，或按照工程成本、质量、进度的控制结果挂钩奖惩的浮动比例计算核定。这类合同的缺点是发包人对工程总造价不易控制，承包人也往往不注意控制工程成本。一般适用于投标和核定合同价格时，工程内容、范围、数量不清楚或难以界定的工程建设项目。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购专业实务","建筑工程",0]