[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983354":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},983354,714,1,"单选题","依法必须招标的项目自招标文件开始发出之日起至投标人提交投标文件截止之日不得少于()日。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","3",false,{"key":16,"text":17,"correct":14},"B","5",{"key":19,"text":20,"correct":21},"C","20",true,{"key":23,"text":24,"correct":14},"D","30","投标截止时间是指投标人递交投标文件和招标人接收投标文件的截止时间。招标人应当根据项目的具体情况确定投标截止时间，使投标人有合理的时间编制投标文件。依法必须招标的项目，从招标文件开始发出之日起到投标截止之日最短不得少于20日。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购专业实务","建筑工程",0]