[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983280":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},983280,714,1,"单选题","下列对设计施工一体化承包方式的描述，错误的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","承包人和分包人不对分包工程承担连带责任",true,{"key":16,"text":17,"correct":18},"B","典型模式有“工厂设备与设计+施工”",false,{"key":20,"text":21,"correct":18},"C","适用于规模大、专业技术性强的工程建设项目",{"key":23,"text":24,"correct":18},"D","可以合理组织分段设计与施工，缩短建设工期","A项，工程承包方式中，施工承包方式由各承包人分别向招标人负责，承包人可以将部分非主体和非关键工程分包给有相应资质条件的分包人承担，并由承包人和分包人对分包工程共同承担连带责任。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购专业实务","建筑工程",0]