[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983277":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},983277,714,1,"单选题","工程建设项目设计招标文件中通常给出项目可行性研究报告中的()，作为投资人实施工程设计控制和优化的目标依据。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","技术设计概算",false,{"key":16,"text":17,"correct":14},"B","初步设计概算",{"key":19,"text":20,"correct":14},"C","工程投资概算",{"key":22,"text":23,"correct":24},"D","工程投资限额",true,"限额设计以批准的可行性研究报告和投资估算为限额，控制方案设计和初步设计；以批准的初步设计及工程概算为限额，优化施工图设计。因此，建设工程设计招标文件通常列出工程投资限额，作为投标人和中标人优化工程设计的目标依据。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购专业实务","建筑工程",0]