[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983256":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},983256,714,1,"单选题","招标标段划分时，需考虑的主要因素不包括()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","法律法规",false,{"key":16,"text":17,"correct":14},"B","工程承包管理模式",{"key":19,"text":20,"correct":14},"C","工程管理力量",{"key":22,"text":23,"correct":24},"D","招标方式",true,"招标合同标段划分主要考虑的相关因素包括：①法律法规；②工程承包管理模式；③工程管理力量；④市场竞争格局；⑤技术关联因素；⑥工期与规模。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购专业实务","建筑工程",0]