[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983247":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},983247,714,1,"单选题","依据《岩土工程勘察规范》，下列不属于输气管道工程勘察阶段的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","可行性研究勘察",true,{"key":16,"text":17,"correct":18},"B","选线勘察",false,{"key":20,"text":21,"correct":18},"C","初步勘察",{"key":23,"text":24,"correct":18},"D","详细勘察","《岩土工程勘察规范》(GB50021-2001)规定，房屋建筑、构筑物、地下洞室、废弃物处理工程可以分为可行性研究勘察、初步勘察、详细勘察和施工勘察等4个阶段；长输油、输气管道工程可以分为选线勘察、初步勘察和详细勘察等3个阶段，核电站则可分为初步可行性研究勘察、可行性研究勘察、初步设计勘察、施工图设计勘察和工程建造勘察等5个勘察阶段。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购专业实务","建筑工程",0]