[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-712-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":619},{"id":5,"name":6,"category":7,"favorite":8},712,"招标采购项目管理","建筑工程",0,7,50,927,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,295,307,319,331,343,355,367,379,391,403,415,427,439,451,463,475,487,499,511,523,535,547,559,571,583,595,607],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},982616,1,"单选题","工程建设项目职业健康安全与环境管理具有多样性，其主要表现是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","工程产品都要根据其特定要求进行施工",true,{"key":24,"text":25,"correct":26},"B","施工过程中各种风险小",false,{"key":28,"text":29,"correct":26},"C","施工生产组织及机构变动迟缓",{"key":31,"text":32,"correct":26},"D","在同一固定场地按严格程序连续施工","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},982617,"间接效益与间接费用是指()。",[38,40,42,44],{"key":20,"text":39,"correct":26},"项目使用投入物所产生的经济费用",{"key":24,"text":41,"correct":22},"由于项目的实施而对国民经济其他部门所带来的影响",{"key":28,"text":43,"correct":26},"纯属货币转移而不影响资源增减的财务收支",{"key":31,"text":45,"correct":26},"项目本身的产出物产生的效益",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":24,"analysis":33},982618,"下列各项不属于公共建筑项目的是()。",[50,52,54,56],{"key":20,"text":51,"correct":26},"社会福利",{"key":24,"text":53,"correct":22},"房屋",{"key":28,"text":55,"correct":26},"体育",{"key":31,"text":57,"correct":26},"卫生",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},982619,"下列关于方案设计任务书的说法，错误的是()。",[62,64,66,68],{"key":20,"text":63,"correct":26},"方案设计任务书的技术主体是关于项目细分功能的需求描述",{"key":24,"text":65,"correct":26},"方案设计任务书由业主或其聘用的项目管理咨询单位编制",{"key":28,"text":67,"correct":22},"方案设计任务书中应该对获得批复的项目建议书中的初步投资提出具体数额",{"key":31,"text":69,"correct":26},"方案设计任务书是建筑方案设计\u002F工程方案招标文件的必要技术附件",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},982620,"下列关于项目质量管理与质量控制关系的说法正确的是()。",[74,76,78,80],{"key":20,"text":75,"correct":26},"质量管理是质量控制的一部分",{"key":24,"text":77,"correct":26},"质量管理是控制施工过程偏差的行为",{"key":28,"text":79,"correct":22},"质量控制是质量管理的一部分而不足全部",{"key":31,"text":81,"correct":26},"质量管理是质量控制的一部分而不是全部",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},982621,"按照计价方式不同，建设工程合同可分为总价合同、单价合同和成本加酬金合同，其中成本加酬金合同主要适用于()的工程建设项目。",[86,88,90,92],{"key":20,"text":87,"correct":26},"风险水平较高",{"key":24,"text":89,"correct":26},"风险水平较低",{"key":28,"text":91,"correct":26},"技术简单",{"key":31,"text":93,"correct":22},"技术复杂",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},982622,"通过施工全过程的全面质量监督管理和决策，保证竣工项目达到投资决策所确定的质量标准属于()的施工质量控制目标。",[98,100,102,104],{"key":20,"text":99,"correct":22},"建设单位",{"key":24,"text":101,"correct":26},"勘察、设计单位",{"key":28,"text":103,"correct":26},"施工单位",{"key":31,"text":105,"correct":26},"监理单位",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},982623,"设计单位介入项目是在()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"项目的策划决策阶段",{"key":24,"text":113,"correct":26},"项目设计阶段",{"key":28,"text":115,"correct":26},"项目计划阶段",{"key":31,"text":117,"correct":26},"项目施工阶段",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},982624,"关于项目财务评价指标偿债备付率，下列表述正确的是()。",[122,124,126,128],{"key":20,"text":123,"correct":26},"在计算偿债备付率时，可用于还本付息的金额只包括折旧、摊销和税后利润",{"key":24,"text":125,"correct":26},"按项目的借款偿还期内总和数据计算的偿债备付率比分年计算的偿债备付率更能反映偿债能力",{"key":28,"text":127,"correct":26},"偿债备付率表示可用于还本付息的资金偿还借款利息的保证倍率",{"key":31,"text":129,"correct":22},"偿债备付率小于1时，表示可用于还本付息的资金不足以偿付当期债务",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},982625,"由各参与方各自的项目管理集成的项目管理体系中，作为业主，()。",[134,136,138,140],{"key":20,"text":135,"correct":26},"业主是项目的投资人与整体风险的承担者",{"key":24,"text":137,"correct":26},"具有项目投资方式与建设实施方式的决定权",{"key":28,"text":139,"correct":26},"业主的项目管理在项目整个的管理体系中处于主导地位",{"key":31,"text":141,"correct":22},"拥有其他各个参与方的选择权",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},982626,"下列关于投资决策程序的说法错误的是()。",[146,148,150,152],{"key":20,"text":147,"correct":22},"通过分析评估可以了解项目所需资源消耗量，以及资源消耗的分布状况",{"key":24,"text":149,"correct":26},"目标的表述应当明确，一般应包括一定的数量概念、时间概念和约束条件",{"key":28,"text":151,"correct":26},"备选方案的拟定需要广开思路，探索和收集一切可能的途径和方法；并严密分析、精心设计",{"key":31,"text":153,"correct":26},"试验实证是指将最佳方案在小范围实施，以验证其运行的可靠性",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},982627,"经济费用效益分析的作用不包括()。",[158,160,162,164],{"key":20,"text":159,"correct":22},"能够评估项目投资的价值",{"key":24,"text":161,"correct":26},"能够促使社会资源合理配置",{"key":28,"text":163,"correct":26},"能够保证投资决策科学化",{"key":31,"text":165,"correct":26},"能够反映项目对国民经济的真实贡献",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},982628,"工程项目中，将风险转移给第三方的途径是()。",[170,172,174,176],{"key":20,"text":171,"correct":26},"风险回避",{"key":24,"text":173,"correct":22},"工程担保",{"key":28,"text":175,"correct":26},"风险自留",{"key":31,"text":177,"correct":26},"质押担保",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},982629,"一体化管理体系是根据()建立的。",[182,184,186,188],{"key":20,"text":183,"correct":26},"企业的运营状况",{"key":24,"text":185,"correct":22},"企业的发展状况和战略目标要求",{"key":28,"text":187,"correct":26},"企业的生产力发展水平",{"key":31,"text":189,"correct":26},"企业的战略目标和运营状况",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},982630,"下列关于工程建设项目的管理分类的说法错误的是()。",[194,196,198,200],{"key":20,"text":195,"correct":26},"竞争性项目应以企业作为投资主体，自主决策、自担投资风险",{"key":24,"text":197,"correct":22},"基本建设项目投资额达到3000万元以上为大中型项目",{"key":28,"text":199,"correct":26},"细致的行业与技术类型分类会限制各类工程建设企业跨行业的业务及能力发展",{"key":31,"text":201,"correct":26},"生产性建设项目包括工业建设、农业建设、基础设施建设和商业建设",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},982631,"建设项目总投资可以表示为()。",[206,208,210,212],{"key":20,"text":207,"correct":26},"建设投资+流动资产投资",{"key":24,"text":209,"correct":26},"工程造价+流动资产",{"key":28,"text":211,"correct":22},"工程造价+流动资产投资",{"key":31,"text":213,"correct":26},"固定资产+流动资金",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":28,"analysis":33},982632,"在管理承包模式(M C)中，业主要求管理承包商提出保证最大工程费用。关于实际工程费用的说法，正确的是()。",[218,220,222,224],{"key":20,"text":219,"correct":26},"超支部分由管理承包商承担，结余部分归业主所有",{"key":24,"text":221,"correct":26},"超支部分由业主承担，结余部分归管理承包商所有",{"key":28,"text":223,"correct":22},"超支部分由管理承包商承担，结余部分由管理承包商与业主分成",{"key":31,"text":225,"correct":26},"超支部分由业主承担，结余部分由管理承包商与业主分成",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":28,"analysis":33},982633,"为了使办理保险投保和索赔手续等更加直接和便利，一般由()投保。",[230,232,234,236],{"key":20,"text":231,"correct":26},"项目经理",{"key":24,"text":233,"correct":26},"所有人",{"key":28,"text":235,"correct":22},"承包人",{"key":31,"text":237,"correct":26},"发包人",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":20,"analysis":33},982634,"下列关于社会评价的说法错误的是()。",[242,244,246,248],{"key":20,"text":243,"correct":22},"调查的基本社会经济情况包括人际关系、户籍资料和文化水平",{"key":24,"text":245,"correct":26},"经常采用的调查分析方法有文献查阅法、问卷调查法、访谈、座谈会等",{"key":28,"text":247,"correct":26},"社会评价所需调查的资料范围是受项目影响区域在项目影响时限内的社会经济情况",{"key":31,"text":249,"correct":26},"受项目影响的利益群体是调查社会资料的维度之一",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":28,"analysis":33},982635,"关于工程建设项目的质量目标，下列叙述有误的是()。",[254,256,258,260],{"key":20,"text":255,"correct":26},"质量目标是项目建设的基本目的",{"key":24,"text":257,"correct":26},"目标的制定应该力求把质量风险降到最低",{"key":28,"text":259,"correct":22},"工程项目的质量管理应围绕着致力于满足政府的质量目标而展开",{"key":31,"text":261,"correct":26},"工程建设项目的质量目标，是业主建设意图通过项目策划和目标决策提出的",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},982636,"关于工程建设项目生命周期四阶段，下列说法正确的是()。",[266,268,270,272],{"key":20,"text":267,"correct":26},"将项目建议书及包括项目方案设计在内的项目可行性研究报告编制、审定、批复过程合一，作为项目决策的第二阶段",{"key":24,"text":269,"correct":26},"将工程设计与编制预控计划作为项目决策的第一阶段",{"key":28,"text":271,"correct":26},"将处于保修期的项目使用阶段作为项目决策的第三阶段",{"key":31,"text":273,"correct":22},"将工程采购与施工作为项目决策的第三阶段",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},982637,"()是项目唯一的全过程的参与者，具有从项目全局与整体看待进度管理的视野，是项目全过程进度管理的主导者。",[278,280,282,284],{"key":20,"text":279,"correct":22},"业主",{"key":24,"text":281,"correct":26},"承包方",{"key":28,"text":283,"correct":26},"设计方",{"key":31,"text":285,"correct":26},"施工方",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":20,"analysis":33},982638,"具有投资少、风险小、周期短、收益高等项目诉求的利益相关方是()。",[290,291,293,294],{"key":20,"text":279,"correct":22},{"key":24,"text":292,"correct":26},"管理咨询方",{"key":28,"text":283,"correct":26},{"key":31,"text":285,"correct":26},{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":24,"analysis":33},982639,"()是指合同一方的业务能力、管理能力、财务能力等有缺陷或者没有圆满履行合同而给另一方带来的风险。",[299,301,303,305],{"key":20,"text":300,"correct":26},"汇率风险",{"key":24,"text":302,"correct":22},"信用风险",{"key":28,"text":304,"correct":26},"价格风险",{"key":31,"text":306,"correct":26},"政治风险",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":31,"analysis":33},982640,"关于国际惯例与国内传统两种管理方式工程建设项目的设计对应，下列叙述错误的是()。",[311,313,315,317],{"key":20,"text":312,"correct":26},"方案设计\u002F工程方案大致对应于概要设计\u002FSD",{"key":24,"text":314,"correct":26},"初步设计大致对应于扩展设计\u002FDD",{"key":28,"text":316,"correct":26},"施工图设计大致对应于施工文件\u002FCD",{"key":31,"text":318,"correct":22},"概念设计大致对应于SD概要设计",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":24,"analysis":33},982641,"承包商信誉差，弄虚作假，施工质量存在隐性缺陷是()的风险因素。",[323,325,327,329],{"key":20,"text":324,"correct":26},"材料设备风险",{"key":24,"text":326,"correct":22},"质量风险",{"key":28,"text":328,"correct":26},"技术风险",{"key":31,"text":330,"correct":26},"管理风险",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":28,"analysis":33},982642,"下列关于设计管理要点的说法，错误的是()。",[335,337,339,341],{"key":20,"text":336,"correct":26},"设计的技术管理与项目投资管理相互脱节，需要采取两阶段限额设计的管理方式予以解决",{"key":24,"text":338,"correct":26},"设计管理必须基于良好设计管理组织架构的搭建，需确定各项专业设计成果的交付深度与方式",{"key":28,"text":340,"correct":22},"实现在设计阶段可节约的工程投资约占项目可节约投资总额的70%～85%的项目很多",{"key":31,"text":342,"correct":26},"良好设计管理组织架构的搭建，需要建立设计总承包体制，明确项目设计各个参与方之间的管理关系",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":31,"analysis":33},982643,"下列对竣工验收的组织的说法错误的是()。",[347,349,351,353],{"key":20,"text":348,"correct":26},"对于特大型、大型工程项目竣工验收，分国家验收和工程业主主管部门两级验收",{"key":24,"text":350,"correct":26},"对于须由政府相关部门验收的项目，应组建工程项目验收委员会进行验收",{"key":28,"text":352,"correct":26},"政府投资项目竣工验收的组织和程序，由国家委托项目主管部门或地方政府组织验收",{"key":31,"text":354,"correct":22},"对验收遗留问题提出具体解决意见，限期落实完成，不管工程合格与否，将全面评价意见写入“验收鉴定书”",{"id":356,"libraryId":5,"type":15,"typeLabel":16,"stem":357,"options":358,"answer":20,"analysis":33},982644,"下列关于采购计划编制工作的说法，错误的是()。",[359,361,363,365],{"key":20,"text":360,"correct":22},"采购计划编制的工作主要包括采购计划的编制和审核",{"key":24,"text":362,"correct":26},"合同条款的前瞻性与预防施工风险的有效性应有机衔接，保证采购成果满足施工风险预防需求，施工合同和监理合同符合施工管理有效性的需求",{"key":28,"text":364,"correct":26},"在工程建设设备采购招标时，应该明确对设备的设计、生产、到货验收等过程实施监督、管理、控制和协调，售后的零部件采购和保修服务也应在采购前予以考虑",{"key":31,"text":366,"correct":26},"依据工程项目的进度需求实施采购计划，业主组织编制各招标文件和合同文件中有关进度的条款，设置逾期处罚及补救办法，需要时起草甲控材料设备的清单、控制内容及程序要求",{"id":368,"libraryId":5,"type":15,"typeLabel":16,"stem":369,"options":370,"answer":24,"analysis":33},982645,"工程量计量和合同价款支付多采用()的模式。",[371,373,375,377],{"key":20,"text":372,"correct":26},"“预支过半，最终结算”",{"key":24,"text":374,"correct":22},"“阶段小结、最终结清”",{"key":28,"text":376,"correct":26},"“一次付清”",{"key":31,"text":378,"correct":26},"“按月结算”",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":28,"analysis":33},982646,"下列各项不属于常见的采暖系统的是()。",[383,385,387,389],{"key":20,"text":384,"correct":26},"热水采暖系统",{"key":24,"text":386,"correct":26},"热风采暖系统",{"key":28,"text":388,"correct":22},"热源采暖系统",{"key":31,"text":390,"correct":26},"分户热计量采暖系统",{"id":392,"libraryId":5,"type":15,"typeLabel":16,"stem":393,"options":394,"answer":31,"analysis":33},982647,"某工程建设单位在开工前已投保“建筑工程一切险”。当工地发生意外事故造成()的伤亡损失属于第三者保险责任。",[395,397,399,401],{"key":20,"text":396,"correct":26},"建设单位工作人员",{"key":24,"text":398,"correct":26},"总包单位技术人员",{"key":28,"text":400,"correct":26},"分包单位合同制工人",{"key":31,"text":402,"correct":22},"工地外过路行人",{"id":404,"libraryId":5,"type":15,"typeLabel":16,"stem":405,"options":406,"answer":31,"analysis":33},982648,"关于确定型决策、非确定型决策和风险型决策，下列说法错误的是()。",[407,409,411,413],{"key":20,"text":408,"correct":26},"风险型决策问题有两个或两个以上的自然状态",{"key":24,"text":410,"correct":26},"非确定型决策问题不知道各个自然状态出现的概率",{"key":28,"text":412,"correct":26},"确定型决策问题只有一个确定的自然状态",{"key":31,"text":414,"correct":22},"三种决策问题中，确定型决策问题是最常见的一种",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":28,"analysis":33},982649,"下列关于项目可行性研究工作内容的描述，错误的是()。",[419,421,423,425],{"key":20,"text":420,"correct":26},"项目可行性研究报告的封闭上报",{"key":24,"text":422,"correct":26},"制订项目的筹融资方案及资金使用计划",{"key":28,"text":424,"correct":22},"分析、论证项目设计总进度目标",{"key":31,"text":426,"correct":26},"参加项目可行性研究报告评估和审核，协助办理相关报批手续",{"id":428,"libraryId":5,"type":15,"typeLabel":16,"stem":429,"options":430,"answer":20,"analysis":33},982650,"当初步设计较深、有详细的设备清单时，编制设备及安装工程概算适用的方法是()。",[431,433,435,437],{"key":20,"text":432,"correct":22},"预算单价法",{"key":24,"text":434,"correct":26},"扩大单价法",{"key":28,"text":436,"correct":26},"概算指标法",{"key":31,"text":438,"correct":26},"设备价值百分率法",{"id":440,"libraryId":5,"type":15,"typeLabel":16,"stem":441,"options":442,"answer":31,"analysis":33},982651,"企业的生产组织形式最基层的生产单位是()。",[443,445,447,449],{"key":20,"text":444,"correct":26},"工厂",{"key":24,"text":446,"correct":26},"车间",{"key":28,"text":448,"correct":26},"工段",{"key":31,"text":450,"correct":22},"工作地",{"id":452,"libraryId":5,"type":15,"typeLabel":16,"stem":453,"options":454,"answer":28,"analysis":33},982652,"下列关于最低费用的评审方法(LCS)的说法错误的是()。",[455,457,459,461],{"key":20,"text":456,"correct":26},"最低费用的评审方法(LCS)是对咨询任务的“质量要求”划定一个“最低合格分值”",{"key":24,"text":458,"correct":26},"在“双封制”评审过程中，如果质量建议书评分高于最低分，则选取财务建议书报价最低的公司进行谈判",{"key":28,"text":460,"correct":22},"LCS适用于标准的或非常规性质的服务项目",{"key":31,"text":462,"correct":26},"设定最低合格分时应考虑到所有高于此分的建议书都仅在价格上进行竞争",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":31,"analysis":33},982653,"()是一种结构化的物流服务项目质量管理工具。",[467,469,471,473],{"key":20,"text":468,"correct":26},"项目质量管理计划",{"key":24,"text":470,"correct":26},"项目质量标杆",{"key":28,"text":472,"correct":26},"项目质量流程图",{"key":31,"text":474,"correct":22},"项目质量核对清单",{"id":476,"libraryId":5,"type":15,"typeLabel":16,"stem":477,"options":478,"answer":31,"analysis":33},982654,"企业各部门和各生产环节质量管理工作的行动纲领是()。",[479,481,483,485],{"key":20,"text":480,"correct":26},"产品说明",{"key":24,"text":482,"correct":26},"产品生产计划",{"key":28,"text":484,"correct":26},"生产操作规范",{"key":31,"text":486,"correct":22},"产品质量计划",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":28,"analysis":33},982655,"关于服务项目管理基本原则，下列说法不正确的是()。",[491,493,495,497],{"key":20,"text":492,"correct":26},"服务项目管理要覆盖服务项目的整个生命周期",{"key":24,"text":494,"correct":26},"用系统的思想来管理服务项目",{"key":28,"text":496,"correct":22},"在服务项目的管理过程中，可以忽略某一次要阶段",{"key":31,"text":498,"correct":26},"项目管理必须从项目系统的整体出发",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":31,"analysis":33},982656,"物流服务项目管理的()是相对于一般运营管理的专门性而言的。",[503,505,507,509],{"key":20,"text":504,"correct":26},"伴随性",{"key":24,"text":506,"correct":26},"环境开放性",{"key":28,"text":508,"correct":26},"组织团队性",{"key":31,"text":510,"correct":22},"集成性",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":31,"analysis":33},982657,"()为传统的货代企业转为物流企业，开展现代物流服务提供了解决问题的有效方法。",[515,517,519,521],{"key":20,"text":516,"correct":26},"权变管理的思想",{"key":24,"text":518,"correct":26},"系统管理的思想",{"key":28,"text":520,"correct":26},"人本管理的思想",{"key":31,"text":522,"correct":22},"项目管理的思想",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":31,"analysis":33},982658,"关于范围管理重点关注的内容，下列说法不正确的是()。",[527,529,531,533],{"key":20,"text":528,"correct":26},"选择适合的项目，是确定服务范围的基础",{"key":24,"text":530,"correct":26},"识别客户的主要需求，是确定服务范围的根本",{"key":28,"text":532,"correct":26},"明确服务范围，是做好范围管理的前提",{"key":31,"text":534,"correct":22},"确定项目的目标，是控制范围变更的有效手段",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":28,"analysis":33},982659,"科技咨询服务项目可分为()。",[539,541,543,545],{"key":20,"text":540,"correct":26},"技术咨询和技术提供项目",{"key":24,"text":542,"correct":26},"技术提供和技术服务项目",{"key":28,"text":544,"correct":22},"技术咨询和技术服务项目",{"key":31,"text":546,"correct":26},"技术开发与技术咨询项目",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":24,"analysis":33},982660,"按物流服务的()划分，物流服务项目可以划分为产品中的物流服务项目、工程建设中的物流服务项目、科技研究与开发中的物流服务项目等。",[551,553,555,557],{"key":20,"text":552,"correct":26},"范围",{"key":24,"text":554,"correct":22},"对象",{"key":28,"text":556,"correct":26},"内容",{"key":31,"text":558,"correct":26},"质量",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":20,"analysis":33},982661,"下列各项不属于融资服务主要目标的是()。",[563,565,567,569],{"key":20,"text":564,"correct":22},"防止资金链断裂",{"key":24,"text":566,"correct":26},"为建设项目筹资",{"key":28,"text":568,"correct":26},"转让存量资产以改善财务目标",{"key":31,"text":570,"correct":26},"为投资融通资金",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":28,"analysis":33},982662,"关于贸易项目的采购平台\u002F互联网公司，下列说法错误的是()。",[575,577,579,581],{"key":20,"text":576,"correct":26},"电子商务采购平台是企业采购协同工作平台",{"key":24,"text":578,"correct":26},"采购企业可以在电子商务采购平台发布采购信息，进行价格谈判，跟踪订单发货，评估供方绩效，分析采购策略，获取合作伙伴，了解市场行情信息等",{"key":28,"text":580,"correct":22},"电子商务采购平台只针对采购企业",{"key":31,"text":582,"correct":26},"电子商务采购平台的承载人均为较具规模及较为成熟的专业互联网企业",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":28,"analysis":33},982663,"物流服务项目与其所服务的整体项目之间的关系是()。",[587,589,591,593],{"key":20,"text":588,"correct":26},"承上启下",{"key":24,"text":590,"correct":26},"环环相扣",{"key":28,"text":592,"correct":22},"相互依赖和相互制约",{"key":31,"text":594,"correct":26},"相互独立",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":31,"analysis":33},982664,"投融资服务项目范围管理的()是确认为完成投融资服务所必须做的工作内容。",[599,601,603,605],{"key":20,"text":600,"correct":26},"标准",{"key":24,"text":602,"correct":26},"要求",{"key":28,"text":604,"correct":26},"计划",{"key":31,"text":606,"correct":22},"目标",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":28,"analysis":33},982665,"投融资服务项目管理中，投资机会研究阶段的研究重点是()。",[611,613,615,617],{"key":20,"text":612,"correct":26},"市场需求分析",{"key":24,"text":614,"correct":26},"项目宏观必要性分析",{"key":28,"text":616,"correct":22},"投资环境分析",{"key":31,"text":618,"correct":26},"经济可行性",[620,623,626,629,632,635],{"id":15,"name":621,"category":7,"favorite":622},"领导干部任职前廉政法规知识测试题",92,{"id":624,"name":625,"category":7,"favorite":15},595,"建筑结构与设备",{"id":627,"name":628,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":630,"name":631,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":633,"name":634,"category":7,"favorite":8},534,"BIM工程师",{"id":636,"name":634,"category":7,"favorite":8},535]