[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-712-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":614},{"id":5,"name":6,"category":7,"favorite":8},712,"招标采购项目管理","建筑工程",0,6,50,927,[13,34,46,58,70,82,94,106,118,130,142,154,166,175,187,199,211,223,235,247,259,271,283,295,307,319,331,340,352,364,376,388,400,412,424,436,448,460,472,484,496,508,520,532,544,556,568,578,590,602],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},982566,1,"单选题","工程建设项目勘察设计风险不包括()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","经济风险",true,{"key":24,"text":25,"correct":26},"B","政策风险",false,{"key":28,"text":29,"correct":26},"C","行为风险",{"key":31,"text":32,"correct":26},"D","技术风险","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},982567,"下列关于工程设计任务书的说法，错误的是()。",[38,40,42,44],{"key":20,"text":39,"correct":26},"工程设计任务书是设计单位进行项目工程设计（包括初步设计与施工图设计）的主要依据",{"key":24,"text":41,"correct":22},"工程设计任务书需要对项目功能进行描述",{"key":28,"text":43,"correct":26},"工程设计任务书是项目工程设计合同的必要技术附件",{"key":31,"text":45,"correct":26},"由业主或其聘用的项目管理咨询单位编制",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},982568,"()是借助第三方来转移风险。",[50,52,54,56],{"key":20,"text":51,"correct":22},"工程保险",{"key":24,"text":53,"correct":26},"工程担保",{"key":28,"text":55,"correct":26},"质押担保",{"key":31,"text":57,"correct":26},"投标保证",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},982569,"某项目第一年初投资1500万元，预计第一年末净盈利1100万元，第二年末净盈利1210万元。如果年折现率为10%，则该项目前两年的净现值为()万元。",[62,64,66,68],{"key":20,"text":63,"correct":22},"500",{"key":24,"text":65,"correct":26},"600",{"key":28,"text":67,"correct":26},"700",{"key":31,"text":69,"correct":26},"810",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},982570,"在设计成果文件的验收时，下列关于方案设计的选定，错误的是()。",[74,76,78,80],{"key":20,"text":75,"correct":26},"由业主选定并报项目所在地城市规划管理部门备案或审查",{"key":24,"text":77,"correct":26},"方案设计的评审专家与业主均可以对选定的设计方案提出设计深化与优化的要求",{"key":28,"text":79,"correct":26},"在投资项目的可行性研究报告尚未获得业主批准时，不宜提前签署工程设计（承包）合同",{"key":31,"text":81,"correct":22},"在投资项目的可行性研究报告尚未获得业主批准时，评标选出的设计方案不能确定为中标方案",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":28,"analysis":33},982571,"管理咨询方提供施工期管理服务时，其介入的情况是()。",[86,88,90,92],{"key":20,"text":87,"correct":26},"业主在项目决策阶段委托管理咨询方介入项目管理",{"key":24,"text":89,"correct":26},"业主在项目的工程设计与计划阶段委托管理咨询方介入项目管理",{"key":28,"text":91,"correct":22},"业主在施工图设计完全完成后委托管理咨询方介入管理",{"key":31,"text":93,"correct":26},"业主仅委托管理咨询方编制可行性报告、技术评估、招标代理、编制标底等专业性的管理咨询工作",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":28,"analysis":33},982572,"在项目融资的风险应对措施中，不属于融资风险应对措施的是()。",[98,100,102,104],{"key":20,"text":99,"correct":26},"信用风险的减轻",{"key":24,"text":101,"correct":26},"建设和开发风险的减轻",{"key":28,"text":103,"correct":22},"政治风险的减轻",{"key":31,"text":105,"correct":26},"金融风险的减轻",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},982573,"甲公司将某工程承包给乙公司，工程进行过程中，甲公司提出的工程变更，由于丙公司的原因，删减了合同中的某项原定工程，致使乙公司得到的收益不能被包括在应支付的项目中，也未被包含在任何替代工程中，则下列各项说法正确的是()。",[110,112,114,116],{"key":20,"text":111,"correct":26},"甲公司无须对乙公司进行赔偿",{"key":24,"text":113,"correct":26},"丙公司无须对乙公司进行赔偿",{"key":28,"text":115,"correct":22},"乙公司有权提出并得到合理的利润补偿",{"key":31,"text":117,"correct":26},"乙公司无权要求得到的到赔偿",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},982574,"竣工验收阶段，主要管理活动不包括()。",[122,124,126,128],{"key":20,"text":123,"correct":26},"业主组织实施竣工验收的各项准备工作",{"key":24,"text":125,"correct":26},"竣工验收通过之后，办理竣工结算",{"key":28,"text":127,"correct":26},"竣工验收通过之后，办理工程移交（含竣工资料）及保修手续",{"key":31,"text":129,"correct":22},"办理政府授权部门的质量监督审查",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},982575,"根据《建设工程质量管理条例》，设备安装和装修工程的最低保修期限是()年。",[134,136,138,140],{"key":20,"text":135,"correct":26},"1",{"key":24,"text":137,"correct":22},"2",{"key":28,"text":139,"correct":26},"3",{"key":31,"text":141,"correct":26},"5",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":28,"analysis":33},982576,"施工准备阶段，监理单位应负责的活动不包括()。",[146,148,150,152],{"key":20,"text":147,"correct":26},"按监理合同要求人员到位，清晰分工与责任",{"key":24,"text":149,"correct":26},"编制监理规划及实施细则，并与施工单位交底并达成一致",{"key":28,"text":151,"correct":22},"编写开工申请报告，上报审批",{"key":31,"text":153,"correct":26},"办理项目在质量监督站或其他政府授权部门的质量监督手续",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},982577,"下列关于投资回收期的说法错误的是()。",[158,160,162,164],{"key":20,"text":159,"correct":26},"根据是否考虑资金时间价值，投资回收期可以分为静态投资回收期和动态投资回收期",{"key":24,"text":161,"correct":26},"如果静态投资回收期≤基准投资回收期，可以考虑接受项目",{"key":28,"text":163,"correct":22},"如果静态投资回收期＞基准投资回收期，应该接受项目",{"key":31,"text":165,"correct":26},"静态投资回收期一般以“年”为单位，自项目建设开始年算起",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},982578,"在质量、环境与职业健康安全管理体系认证和保持过程中，认证证书有效期为()年。",[170,171,172,173],{"key":20,"text":135,"correct":26},{"key":24,"text":137,"correct":26},{"key":28,"text":139,"correct":22},{"key":31,"text":174,"correct":26},"4",{"id":176,"libraryId":5,"type":15,"typeLabel":16,"stem":177,"options":178,"answer":20,"analysis":33},982579,"下列各项不属于社会评价的特点的是()。",[179,181,183,185],{"key":20,"text":180,"correct":22},"过程的复杂性",{"key":24,"text":182,"correct":26},"目标的多样性",{"key":28,"text":184,"correct":26},"评价标准的差异性",{"key":31,"text":186,"correct":26},"宏观性",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":20,"analysis":33},982580,"缺陷责任届满，若有剩余的预留质保金，业主应将其()。",[191,193,195,197],{"key":20,"text":192,"correct":22},"返还承包人",{"key":24,"text":194,"correct":26},"返还发包人",{"key":28,"text":196,"correct":26},"返还施工单位",{"key":31,"text":198,"correct":26},"留作自用",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":20,"analysis":33},982581,"财务风险中，关于工程价款结算方面的风险因素，下列说法不正确的是()。",[203,205,207,209],{"key":20,"text":204,"correct":22},"政策调整变化",{"key":24,"text":206,"correct":26},"多算工程量",{"key":28,"text":208,"correct":26},"提高结算价",{"key":31,"text":210,"correct":26},"重复结算",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":24,"analysis":33},982582,"某市一栋3000m 2 普通办公楼为框架结构，建筑工程直接费为370万元，其中，毛石基础为39元\u002Fm 3 。而今拟建一栋3500m 2 办公楼，采用钢筋混凝土带形基础为51元\u002Fm 3 ，其他结构相同。该拟建办公楼直接费的造价概算适合采用()。",[215,217,219,221],{"key":20,"text":216,"correct":26},"概算定额法",{"key":24,"text":218,"correct":22},"概算指标法",{"key":28,"text":220,"correct":26},"扩大单价法",{"key":31,"text":222,"correct":26},"类似工程预算法",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":31,"analysis":33},982583,"实施图纸审查、工程变更和设计变更管理制度，审查承包商时，不包括()。",[227,229,231,233],{"key":20,"text":228,"correct":26},"审查承包商提交的各种变更、索赔、签证要求",{"key":24,"text":230,"correct":26},"及时协调解决各项变更后的利益问题",{"key":28,"text":232,"correct":26},"编制项目管理控制工作细则",{"key":31,"text":234,"correct":22},"监督项目管理承包商的采购招标",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":31,"analysis":33},982584,"机械设备安装的主要工作内容不包括()。",[239,241,243,245],{"key":20,"text":240,"correct":26},"设备基础土建施工",{"key":24,"text":242,"correct":26},"设备安装",{"key":28,"text":244,"correct":26},"安装准备工作",{"key":31,"text":246,"correct":22},"设备调试与检修",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":28,"analysis":33},982585,"下列关于工程建设项目施工质量验收的说法中，正确的是()。",[251,253,255,257],{"key":20,"text":252,"correct":26},"隐蔽工程可由施工单位自行验收",{"key":24,"text":254,"correct":26},"重要的分部分项工程应由设计单位主持验收",{"key":28,"text":256,"correct":22},"单位工程应由建设单位主持验收",{"key":31,"text":258,"correct":26},"监理单位无权主持隐蔽工程隐蔽前的验收",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":31,"analysis":33},982586,"质量管理的基本模式不包括()。",[263,265,267,269],{"key":20,"text":264,"correct":26},"策划",{"key":24,"text":266,"correct":26},"实施",{"key":28,"text":268,"correct":26},"检查",{"key":31,"text":270,"correct":22},"反馈",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":20,"analysis":33},982587,"就大型复杂工程建设项目而言，其进度计划体系的计划构成一般不少于()。",[275,277,279,281],{"key":20,"text":276,"correct":22},"三级",{"key":24,"text":278,"correct":26},"四级",{"key":28,"text":280,"correct":26},"五级",{"key":31,"text":282,"correct":26},"六级",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":24,"analysis":33},982588,"质量、职业健康安全和环境一体化管理体系不包括()。",[287,289,291,293],{"key":20,"text":288,"correct":26},"一体化管理方针目标",{"key":24,"text":290,"correct":22},"一体化的措施",{"key":28,"text":292,"correct":26},"实现方针目标的相互作用的要素",{"key":31,"text":294,"correct":26},"实现方针目标的相互关联的要素",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":31,"analysis":33},982589,"总价合同中的工程计量报告向()提交。",[299,301,303,305],{"key":20,"text":300,"correct":26},"承包人",{"key":24,"text":302,"correct":26},"建筑方",{"key":28,"text":304,"correct":26},"设计专业人员",{"key":31,"text":306,"correct":22},"发包人",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":24,"analysis":33},982590,"下列关于工程建设项目勘察与设计的利益相关方的说法，错误的是()。",[311,313,315,317],{"key":20,"text":312,"correct":26},"工程建设项目勘察与设计的利益相关方主要有业主、勘察设计单位以及施工单位",{"key":24,"text":314,"correct":22},"施工单位是工程设计形成施工成果的承受方",{"key":28,"text":316,"correct":26},"在勘察和设计两者之间，设计单位是勘察成果的主要使用方",{"key":31,"text":318,"correct":26},"施工单位是工程设计文件和成果的直接使用方",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":31,"analysis":33},982591,"施工过程的目标管理，不包括()。",[323,325,327,329],{"key":20,"text":324,"correct":26},"目标的确定与分解",{"key":24,"text":326,"correct":26},"施工目标的实施管理",{"key":28,"text":328,"correct":26},"施工目标的分析与跟踪",{"key":31,"text":330,"correct":22},"施工目标的审查与验收",{"id":332,"libraryId":5,"type":15,"typeLabel":16,"stem":333,"options":334,"answer":20,"analysis":33},982592,"当初步设计深度不够，不能准确地计算出工程量，但工程设计技术比较成熟而又有类似工程概算指标可以利用时，可采用()进行设计概算。",[335,336,337,338],{"key":20,"text":218,"correct":22},{"key":24,"text":216,"correct":26},{"key":28,"text":222,"correct":26},{"key":31,"text":339,"correct":26},"预算单价法",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":28,"analysis":33},982593,"关于项目施工阶段业主的管理工作进度控制，下列描述错误的是()。",[344,346,348,350],{"key":20,"text":345,"correct":26},"根据项目进度总控制计划，在各专业施工与供货招标文件中明确相应的工期目标",{"key":24,"text":347,"correct":26},"编制各招标文件和合同文件中有关进度的条款，设置逾期处罚及补救办法",{"key":28,"text":349,"correct":22},"分析各投标单位的投标报价，必要时安排清标",{"key":31,"text":351,"correct":26},"根据情况及时调整项目进度总控制计划",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},982594,"业主方可仅就项目施工任务与施工方签订施工承包合同，如果施工方承包责任范围仅涉及项目的某一专业工程，则该合同称为()。",[356,358,360,362],{"key":20,"text":357,"correct":26},"项目工程总承包合同",{"key":24,"text":359,"correct":22},"专业工程设计施工一体化承包合同",{"key":28,"text":361,"correct":26},"专业工程设计施工一体化分包合同",{"key":31,"text":363,"correct":26},"项目工程分包合同",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":20,"analysis":33},982595,"关于主体结构施工技术，下列说法错误的是()。",[368,370,372,374],{"key":20,"text":369,"correct":22},"在预应力混凝土结构中，混凝土的强度等级不应低于C40",{"key":24,"text":371,"correct":26},"砌筑工程包括砂浆制备、材料运输、搭设脚手架及砌块砌筑等施工过程",{"key":28,"text":373,"correct":26},"模板系统由模板、支撑及紧固件等组成",{"key":31,"text":375,"correct":26},"当室外日平均气温连续5日稳定低于5℃时，应采取冬期施工措施",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":24,"analysis":33},982596,"下列各项中，()不属于项目初步决策阶段业主的管理工作内容。",[380,382,384,386],{"key":20,"text":381,"correct":26},"项目建设必要性的环境调查",{"key":24,"text":383,"correct":22},"项目可行性研究工作",{"key":28,"text":385,"correct":26},"技术策划",{"key":31,"text":387,"correct":26},"宏观经济分析",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},982597,"下列关于土木工程材料的说法错误的是()。",[392,394,396,398],{"key":20,"text":393,"correct":26},"建筑木材主要用于脚手架、木结构构件和家具等",{"key":24,"text":395,"correct":22},"膨胀水泥适用于制作自应力钢筋混凝土压力管及配件",{"key":28,"text":397,"correct":26},"建筑钢材分为钢结构用钢和钢筋混凝土结构用钢两类",{"key":31,"text":399,"correct":26},"石膏主要原料是天然二水石膏",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":31,"analysis":33},982598,"地下工程位置的选择需要考虑的影响因素不包括()。",[404,406,408,410],{"key":20,"text":405,"correct":26},"地下水",{"key":24,"text":407,"correct":26},"岩性",{"key":28,"text":409,"correct":26},"区域稳定",{"key":31,"text":411,"correct":22},"地表建筑",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":31,"analysis":33},982599,"关于电气照明及动力设备，下列说法错误的是()。",[416,418,420,422],{"key":20,"text":417,"correct":26},"交流电动机分为单相电动机和三相电动机",{"key":24,"text":419,"correct":26},"把绝缘导线穿入管内敷设，称为配管配线",{"key":28,"text":421,"correct":26},"常用的电光源有热致发光电光源、气体放电发光电光源、固体发光电光源",{"key":31,"text":423,"correct":22},"低压电器指电压在1200V以下的各种控制设备、继电器及保护设备等",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},982600,"关于制订完善的技术保证措施，下列说法有误的是()。",[428,430,432,434],{"key":20,"text":429,"correct":26},"要求项目各参与方参加图纸会审和各级设计交底工作，让所有参与人员都领会设计意图和技术要求",{"key":24,"text":431,"correct":22},"根据实际，对事先确定的施工工序进行灵活处理",{"key":28,"text":433,"correct":26},"协调不同专业之间的工作关系，比如土建施工应理顺与水电安装之间的关系，配合水电女装工程的预留、预埋工作",{"key":31,"text":435,"correct":26},"合理安排工序的穿插施工，加强成品保护。所有隐蔽工程必须经有关单位验收、签字盖章，并如实做好隐蔽记录后，方可组织下道工序的施工",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":20,"analysis":33},982601,"企业的一体化管理方针是()。",[440,442,444,446],{"key":20,"text":441,"correct":22},"企业在建立和运行管理体系方面的基本承诺和宗旨",{"key":24,"text":443,"correct":26},"企业在运营方面的最终目标",{"key":28,"text":445,"correct":26},"企业的发展状况和战略目标要求",{"key":31,"text":447,"correct":26},"企业文化和企业目标",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":31,"analysis":33},982602,"下列关于工程设计采购建造模式(EP C)的说法，错误的是()。",[452,454,456,458],{"key":20,"text":453,"correct":26},"EPC合同通常应为总价包干合同",{"key":24,"text":455,"correct":26},"EPC模式是诸多派生性工程项目综合管理模式的载体。",{"key":28,"text":457,"correct":26},"EPC模式在国内国外的运用基本相同，所不同的只是其中招标图纸达到的设计深度",{"key":31,"text":459,"correct":22},"EPC模式只适用于工程建设项目总承包的层面",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":28,"analysis":33},982603,"下列环境影响评价的分类方法错误的是()。",[464,466,468,470],{"key":20,"text":465,"correct":26},"按照评价对象，环境影响评价可以分为规划环境影响评价和建设项目环境影响评价",{"key":24,"text":467,"correct":26},"按照空间域，环境影响评价可分为建设项目环境评价和区域环境评价",{"key":28,"text":469,"correct":22},"按照时间顺序，环境影响评价可分为单项评价和综合评价或宏观评价",{"key":31,"text":471,"correct":26},"按照环境要素，环境影响评价可以分为大气环境影响评价、地表水环境影响评价、声环境影响评价、生态环境影响评价和固体废物环境影响评价等",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},982604,"在项目设计阶段，图纸的可施工性差的原因，不包括()。",[476,478,480,482],{"key":20,"text":477,"correct":22},"设计单位业务众多",{"key":24,"text":479,"correct":26},"设计人员专一于设计任务本身",{"key":28,"text":481,"correct":26},"不熟悉施工环节的工作要求",{"key":31,"text":483,"correct":26},"“闭门造车”，脱离施工实际",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":31,"analysis":33},982605,"国际惯例中“扩展设计(D D)”的作用不包括()。 A、是设计单位向业主提交的最终设计成果",[488,490,492,494],{"key":20,"text":489,"correct":26},"是工程量清单的编制依据，是“概要设计\u002FSD”与“施工文件\u002FCD”的技术衔接文件",{"key":24,"text":491,"correct":26},"在按国际惯例管理的工程建设项目中，施工单位需在签订施工承包合同后以“扩展设计(D",{"key":28,"text":493,"correct":26},"”为基础编制“施工文件\u002FCD”",{"key":31,"text":495,"correct":22},"实现整个开发项目的总体\u002F控制性规划",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":28,"analysis":33},982606,"下列关于设计一招标一施工模式(DB B)的说法，不正确的是()。",[500,502,504,506],{"key":20,"text":501,"correct":26},"业主只进行一次施工招标并与一个施工单位签订施工总承包合同",{"key":24,"text":503,"correct":26},"该模式管理的技术基础是线性顺序法，所以具有该方法固有的缺陷，即耗时较长",{"key":28,"text":505,"correct":22},"国外在工地现场多采用委托施工监理的方式，国内则采取管理公司派出驻地工程师的方式",{"key":31,"text":507,"correct":26},"该模式工作界面清晰，特别适用于项目各个阶段需要严格逐步审批的情况",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":24,"analysis":33},982607,"下列各项中不可以用来表示锅炉的基本特性的是()。",[512,514,516,518],{"key":20,"text":513,"correct":26},"温度",{"key":24,"text":515,"correct":22},"损耗率",{"key":28,"text":517,"correct":26},"压力",{"key":31,"text":519,"correct":26},"蒸发量",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":28,"analysis":33},982608,"在工程设计与计划阶段，对设计方案进行选择与优化的主要方法及途径不包括()。",[524,526,528,530],{"key":20,"text":525,"correct":26},"重视设计招标和方案比选",{"key":24,"text":527,"correct":26},"推行限额设计和标准化设计",{"key":28,"text":529,"correct":22},"提升设计概算的精准度",{"key":31,"text":531,"correct":26},"加强设计方案的评价与优化",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":28,"analysis":33},982609,"下列关于竣工图的管理要求的说法错误的是()。",[536,538,540,542],{"key":20,"text":537,"correct":26},"承包单位按规定编制好竣工图并接受验收委员会对竣工图质量的检查",{"key":24,"text":539,"correct":26},"承包商（包括工程设计与施工单位）应按合同要求准时提交合格竣工图",{"key":28,"text":541,"correct":22},"因业主或主管部门要求变更设计的，需要重新绘制竣工图时，费用由设计单位承担",{"key":31,"text":543,"correct":26},"按图施工没有发生变动时，可由施工单位在原施工图上加盖“竣工图”标志，作为竣工图",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":28,"analysis":33},982610,"工程设计质量管理工作的具体内容不包括()。",[548,550,552,554],{"key":20,"text":549,"correct":26},"安排施工图的强制性审查",{"key":24,"text":551,"correct":26},"组织安排编制工程量清单及施工图预算，确保预算准确且不超过给定的投资控制指标及浮动的限度",{"key":28,"text":553,"correct":22},"作出技术设计的具体工作安排",{"key":31,"text":555,"correct":26},"组织全部施工图的质量审查，最大限度地减少各专业施工图纸的“错、漏、碰、缺”",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":31,"analysis":33},982611,"下列关于经济效果的评价方法的说法错误的是()。",[560,562,564,566],{"key":20,"text":561,"correct":26},"动态评价方法是考虑资金时间价值以进行项目评价的方法",{"key":24,"text":563,"correct":26},"静态评价方法最大特点是计算简便",{"key":28,"text":565,"correct":26},"静态评价方法不考虑资金时间价值",{"key":31,"text":567,"correct":22},"在进行方案比较时，一般以静态评价方法为主",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":28,"analysis":33},982612,"在风险转移的途径中，利用()来降低或规避某些风险的转移成本相对较低。",[572,573,574,576],{"key":20,"text":51,"correct":26},{"key":24,"text":53,"correct":26},{"key":28,"text":575,"correct":22},"合同的保护性条款",{"key":31,"text":577,"correct":26},"工程贷款",{"id":579,"libraryId":5,"type":15,"typeLabel":16,"stem":580,"options":581,"answer":31,"analysis":33},982613,"下列关于项目进度管理体系中三级计划间关系的说法错误的是()。",[582,584,586,588],{"key":20,"text":583,"correct":26},"一、二、三级计划间是对应的",{"key":24,"text":585,"correct":26},"二级计划与一级计划是对应的",{"key":28,"text":587,"correct":26},"三级计划与二级计划是对应的",{"key":31,"text":589,"correct":22},"三级计划与一级计划间不存在联系",{"id":591,"libraryId":5,"type":15,"typeLabel":16,"stem":592,"options":593,"answer":31,"analysis":33},982614,"空负荷试车和带负荷试车的交叉应注意的事项不包括()。",[594,596,598,600],{"key":20,"text":595,"correct":26},"有些项目的单项工程较多，并受生产工艺逻辑关系的顺序约束，必须按“单元排序”中的紧前单项工程完成带负荷试车",{"key":24,"text":597,"correct":26},"不同的项目采用的项目管理方式不同，承发包职责分工不尽一致",{"key":28,"text":599,"correct":26},"强化项目各参与方职责协调，相互合作是关键",{"key":31,"text":601,"correct":22},"检查空负荷试车和带负荷试车的确认文件和试车中出现的问题是否已经纠正",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":20,"analysis":33},982615,"伊拉克入侵科威特引起海湾战争，使我国在科威特的几家建筑公司蒙受了很大损失。这属于工程项目风险的()。",[606,608,610,612],{"key":20,"text":607,"correct":22},"政治风险",{"key":24,"text":609,"correct":26},"社会风险",{"key":28,"text":611,"correct":26},"信用风险",{"key":31,"text":613,"correct":26},"组织风险",[615,618,621,624,627,630],{"id":15,"name":616,"category":7,"favorite":617},"领导干部任职前廉政法规知识测试题",92,{"id":619,"name":620,"category":7,"favorite":15},595,"建筑结构与设备",{"id":622,"name":623,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":625,"name":626,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":628,"name":629,"category":7,"favorite":8},534,"BIM工程师",{"id":631,"name":629,"category":7,"favorite":8},535]