[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-712-5":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":619},{"id":5,"name":6,"category":7,"favorite":8},712,"招标采购项目管理","建筑工程",0,5,50,927,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,441,453,465,476,488,500,511,523,535,547,559,571,583,595,607],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},982516,1,"单选题","关于基于传统工程管理基础上的计算机系统管理平台，下列说法错误的是()。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","主要基于二维平面为基础，以进度为主线，以合同为约束，以成本控制为核心，兼容了微观、中观、宏观的管理思想，采取数据自上而下分层汇总，层层递进的原则",true,{"key":24,"text":25,"correct":26},"B","项目管理层可实时动态监控项目施工过程中的进度和盈亏状况，对施工全周期的各个环节进行综合管理",false,{"key":28,"text":29,"correct":26},"C","利用计算机系统管理平台，实现决策层、业务管理层、协调层和项目执行层协同作业、数据共享",{"key":31,"text":32,"correct":26},"D","业主和施工企业管理层可以实时获取远程项目施工过程的各种信息，可同时管理多个不同性质的项目并在多项目之间进行资源协调","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},982517,"关于项目施工阶段市政公用工程管理，下列描述错误的是()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"办理工程与生产设备的移交手续",{"key":24,"text":41,"correct":26},"办理土地征用、建设用地规划及建设工程规划等有关手续",{"key":28,"text":43,"correct":26},"办理施工许可等手续",{"key":31,"text":45,"correct":26},"落实建设场地“四通一平”",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},982518,"对于以投资补助或贴息资金方式使用政府投资资金的企业投资项目，应在项目核准或备案后向国家发展改革部门报送()。",[50,52,54,56],{"key":20,"text":51,"correct":26},"可行性研究报告",{"key":24,"text":53,"correct":26},"专业评审意见",{"key":28,"text":55,"correct":26},"第三方审核方案",{"key":31,"text":57,"correct":22},"资金申请报告",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},982519,"下列各项中，关于工程计价说法错误的是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"对工程建设项目的计价是采用先汇总，后分解的方式进行",{"key":24,"text":65,"correct":26},"工程计价可大致划分计量和计价两个环节",{"key":28,"text":67,"correct":26},"计价程序和计价方法具有特殊性",{"key":31,"text":69,"correct":26},"分解结构层次越多，基本子项划分越细，工程造价的计算也更精确",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},982520,"工程建设项目施工质量检查验收时，一般不包括对()的检查。",[74,76,78,80],{"key":20,"text":75,"correct":22},"施工组织设计",{"key":24,"text":77,"correct":26},"分部分项工程内容",{"key":28,"text":79,"correct":26},"工程外观质量",{"key":31,"text":81,"correct":26},"施工质量保证资料",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},982521,"关于利息与利率，下列说法错误的是()。",[86,88,90,92],{"key":20,"text":87,"correct":26},"利率是单位本金经过一个计息周期后的增值率",{"key":24,"text":89,"correct":22},"复利法每一期只需要对利息计息",{"key":28,"text":91,"correct":26},"利息是指债权人占用债务人的资金所付出的超过本金部分的资金",{"key":31,"text":93,"correct":26},"单利法的缺点是每期所得利息不再生息，不考虑利息再投入生产或流通领域参加资金周转",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},982522,"工程建设项目施工阶段，监理不到位或工作效率低下属于()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"管理风险",{"key":24,"text":101,"correct":26},"组织风险",{"key":28,"text":103,"correct":26},"技术风险",{"key":31,"text":105,"correct":26},"质量风险",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":24,"analysis":33},982523,"发包人在收到竣工结算款的支付申请后()天内予以核实，向承包人签发竣工结算支付证书。",[110,112,114,116],{"key":20,"text":111,"correct":26},"5",{"key":24,"text":113,"correct":22},"7",{"key":28,"text":115,"correct":26},"10",{"key":31,"text":117,"correct":26},"15",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},982524,"工程质量事故处理的基本要求不包括()。",[122,124,126,128],{"key":20,"text":123,"correct":26},"满足使用和功能要求",{"key":24,"text":125,"correct":22},"加固补强，封闭保护",{"key":28,"text":127,"correct":26},"迅速及时，减少影响程度",{"key":31,"text":129,"correct":26},"处理方便，经济合理",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},982525,"下列关于施工技术的说法错误的是()。",[134,136,138,140],{"key":20,"text":135,"correct":26},"在预应力混凝土结构中，混凝土的强度等级不应低于C30",{"key":24,"text":137,"correct":26},"地基技术要求包括强度、稳定性、压缩及不均匀沉降问题",{"key":28,"text":139,"correct":22},"地下连续墙只能用作深基坑的支护结构或深基坑的支护",{"key":31,"text":141,"correct":26},"半机械化吊装方法有整体吊装法和分段吊装法",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},982526,"从业主工程管理的角度出发，施工过程管理中的技术协调的重点，主要是()。",[146,148,150,152],{"key":20,"text":147,"correct":26},"技术强度协调",{"key":24,"text":149,"correct":26},"技术水平协调",{"key":28,"text":151,"correct":26},"技术难度协调",{"key":31,"text":153,"correct":22},"技术信息协调",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},982527,"工程项目从立项到投产使用要经历五个阶段，每个阶段都要控制施工的安全和环境问题，这体现的是工程建设项目职业健康安全与环境管理的()特点。",[158,160,162,164],{"key":20,"text":159,"correct":26},"不符合性",{"key":24,"text":161,"correct":26},"协调性",{"key":28,"text":163,"correct":22},"持续性",{"key":31,"text":165,"correct":26},"复杂性",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":31,"analysis":33},982528,"下列各项不属于工程项目竣工决算内容的是()。",[170,172,174,176],{"key":20,"text":171,"correct":26},"竣工决算报告情况说明书",{"key":24,"text":173,"correct":26},"竣工财务决算报表",{"key":28,"text":175,"correct":26},"工程造价比较分析报告",{"key":31,"text":177,"correct":22},"工程竣工计划对比分析报告",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},982529,"下列关于施工过程的说法错误的是()。",[182,184,186,188],{"key":20,"text":183,"correct":26},"施工过程的最终目的是要建造、恢复、改建、移动或拆除工业、民用建筑和构筑物的全部或一部分",{"key":24,"text":185,"correct":26},"施工过程一般是在业主组织和授权下，由施工企业具体实施的具有特定目标的一次性活动",{"key":28,"text":187,"correct":22},"施工过程的范围一般由项目管理者授予的工程承包合同界定",{"key":31,"text":189,"correct":26},"施工过程又称施工项目，是指在建设工地范围内所进行的各种生产活动",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":28,"analysis":33},982530,"业主应根据工程建设项目特点确定收尾阶段的管理方法，下列说法错误的是()。",[194,196,198,200],{"key":20,"text":195,"correct":26},"规范收尾人员的岗位标准，对收尾人员进行在岗情况检查，并及时考核，兑现奖罚",{"key":24,"text":197,"correct":26},"强化变更、索赔项目的工程结算管理，对有争议变更索赔项目及时进行汇总整理，在索赔依据",{"key":28,"text":199,"correct":22},"业主与施工单位签订工程保修合同，出现缺陷由施工单位承担责任",{"key":31,"text":201,"correct":26},"审核质量缺陷修复方案，监督修复过程并进行验收",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":31,"analysis":33},982531,"敏感性分析属于投资项目经济评价中的不确定性分析，其主要目的是()。",[206,208,210,212],{"key":20,"text":207,"correct":26},"说明项目是否具有满意的经济效益",{"key":24,"text":209,"correct":26},"计算项目的盈亏平衡点",{"key":28,"text":211,"correct":26},"确定项目不确定性因素发生变化的概率",{"key":31,"text":213,"correct":22},"分析项目不确定性因素变化对项目评价指标的影响",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},982532,"下列关于勘察业务的说法错误的是()。",[218,220,222,224],{"key":20,"text":219,"correct":26},"勘察业务一般由业主委托专业的勘察设计单位承担，或是由具有勘察资质的工程设计单位承担",{"key":24,"text":221,"correct":22},"勘察合同均为一次性签订",{"key":28,"text":223,"correct":26},"勘察合同范围可以按工程所处行业或专业的惯例、项目的预定管理方案、项目勘察任务的具体情况等确定",{"key":31,"text":225,"correct":26},"勘察合同范围可确定为单纯的可研勘察、可研勘察+初设勘察或者可研勘察+初设勘察+详细勘察",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":24,"analysis":33},982533,"在工程建设项目管理实施方式中，在业主常年进行工程建设项目投资，拥有稳定的专业化的工程项目管理机构，具有所投资项目的管理经验与能力的情况下，业主最好的管理实施方式是()。",[230,232,234,236],{"key":20,"text":231,"correct":26},"业主方委托专业管理咨询单位代理管理",{"key":24,"text":233,"correct":22},"业主自设管理机构实施管理",{"key":28,"text":235,"correct":26},"业主方与管理咨询单位的一体化项目管理",{"key":31,"text":237,"correct":26},"由专业项目管理单位进行承包",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":28,"analysis":33},982534,"某投资者年初借入一笔贷款，贷款合同约定，年利率12%，每半年计算一次，年末一次性还本付息，该笔贷款的实际年利率为()。",[242,244,246,248],{"key":20,"text":243,"correct":26},"6%",{"key":24,"text":245,"correct":26},"12%",{"key":28,"text":247,"correct":22},"12.36%",{"key":31,"text":249,"correct":26},"12.55%",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},982535,"实施质量管理体系、环境与职业健康安全管理体系认证产生于()需求。",[254,256,258,260],{"key":20,"text":255,"correct":26},"经济平衡发展",{"key":24,"text":257,"correct":26},"社会和谐发展",{"key":28,"text":259,"correct":26},"环境健康保护",{"key":31,"text":261,"correct":22},"国际贸易的市场准入",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":24,"analysis":33},982536,"利息备付率指的是()。",[266,268,270,272],{"key":20,"text":267,"correct":26},"借款偿还期内可用于还本付息的资金与当期应还本付息金额的比值",{"key":24,"text":269,"correct":22},"借款偿还期内可用于支付利息的息税前利润与当前应付利息的比值",{"key":28,"text":271,"correct":26},"各年现金流入与现金流出的差额",{"key":31,"text":273,"correct":26},"各年净现金流量的累计",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":28,"analysis":33},982537,"下列各项不属于根据桥梁所跨越的障碍物分类的桥梁是()。",[278,280,282,284],{"key":20,"text":279,"correct":26},"立交桥",{"key":24,"text":281,"correct":26},"高架桥",{"key":28,"text":283,"correct":22},"铁路桥",{"key":31,"text":285,"correct":26},"跨河桥",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},982538,"在项目进度管理过程中，必须搭建好各方进度管理的共同平台。下列说法错误的是()。",[290,292,294,296],{"key":20,"text":291,"correct":26},"项目进度管理具有的“全过程”与“多方参与”的特点",{"key":24,"text":293,"correct":22},"不同参与方介入项目进度管理的周期相同",{"key":28,"text":295,"correct":26},"不同参与方的进度管理各不相同",{"key":31,"text":297,"correct":26},"各参与方在进度管理上可能产生的利益冲突",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},982539,"下列可以减少设计与施工在合同上的工作界面的项目管理模式为()。",[302,304,306,308],{"key":20,"text":303,"correct":26},"DBB",{"key":24,"text":305,"correct":26},"CM",{"key":28,"text":307,"correct":26},"MC",{"key":31,"text":309,"correct":22},"EPC",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":31,"analysis":33},982540,"在项目启动时，概念设计的目的与作用不包括()。",[314,316,318,320],{"key":20,"text":315,"correct":26},"确定拟建设项目的功能定位",{"key":24,"text":317,"correct":26},"为项目规划意见书提供参考依据。",{"key":28,"text":319,"correct":26},"作为编制项目修建性详细规划的技术载体",{"key":31,"text":321,"correct":22},"是项目的宣传策划的重要手段",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},982541,"对某项目进行财务评价时，发现该项目财务净现值为零，则表明此项目()。",[326,328,330,332],{"key":20,"text":327,"correct":22},"盈利能力能达到所期望的最低财务盈利水平",{"key":24,"text":329,"correct":26},"利润为零",{"key":28,"text":331,"correct":26},"盈利能力刚好达到行业的平均水平",{"key":31,"text":333,"correct":26},"盈利能力为行业的最低水平",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},982542,"关于业主委托专业管理咨询单位代理管理，下列说法错误的是()。",[338,340,342,344],{"key":20,"text":339,"correct":22},"所有事项均由专业管理咨询单位掌握和决定",{"key":24,"text":341,"correct":26},"管理咨询业务合一或分散，取决于管理咨询单位的实际能力及业主的信任",{"key":28,"text":343,"correct":26},"管理咨询单位需要按委托合同的约定承担管理责任",{"key":31,"text":345,"correct":26},"业主将项目管理工作的主体部分委托专业的管理咨询单位承担",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":28,"analysis":33},982543,"下列各项质量事故或缺陷中，应由业主负责处理的是()。",[350,352,354,356],{"key":20,"text":351,"correct":26},"勘察、设计方面的原因造成的质量事故或缺陷",{"key":24,"text":353,"correct":26},"设备、材料、构配件不合格造成的质量缺陷",{"key":28,"text":355,"correct":22},"地震、洪水、台风等不可抗力造成的质量事故与其缺陷",{"key":31,"text":357,"correct":26},"使用单位未经许可自行改建或使用不当造成的质量事故",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":24,"analysis":33},982544,"工程建设项目设计准备阶段，业主方项目管理的重要工作之一是()。",[362,364,366,368],{"key":20,"text":363,"correct":26},"编制并报批项目建议书",{"key":24,"text":365,"correct":22},"确定项目的方案设计",{"key":28,"text":367,"correct":26},"编制项目进度总控计划",{"key":31,"text":369,"correct":26},"进行施工招标",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},982545,"工程设计业务的采购范围不包括()。",[374,376,378,380],{"key":20,"text":375,"correct":22},"业主采购建筑方案\u002F工程方案设计成果",{"key":24,"text":377,"correct":26},"业主采购“全过程”设计工作",{"key":28,"text":379,"correct":26},"业主采购达到初步设计或扩大初步设计深度的成果",{"key":31,"text":381,"correct":26},"业主仅采购生产工艺及建筑方案\u002F工程方案设计",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},982546,"用产量表示盈亏平衡点时，盈亏平衡点越低，表示()。",[386,388,390,392],{"key":20,"text":387,"correct":26},"项目对产出品数量变化的适应能力越强，项目的抗风险能力越弱",{"key":24,"text":389,"correct":22},"项目对产出品数量变化的适应能力越强，项目的抗风险能力越强",{"key":28,"text":391,"correct":26},"项目对产出品数量变化的适应能力越弱，项目的抗风险能力越强",{"key":31,"text":393,"correct":26},"项目对产出品数量变化的适应能力越弱，项目的抗风险能力越弱",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":28,"analysis":33},982547,"直接影响工程建设项目环境的主要因素是()。",[398,400,402,404],{"key":20,"text":399,"correct":26},"施工准备",{"key":24,"text":401,"correct":26},"施工验收",{"key":28,"text":403,"correct":22},"施工过程",{"key":31,"text":405,"correct":26},"竣工验收",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":31,"analysis":33},982548,"关于工程建设项目决策程序，下列说法错误的是()。",[410,412,414,416],{"key":20,"text":411,"correct":26},"确定目标是投资决策的前提，它能为决策提供明确的准则和方向，为方案的优选提供标准",{"key":24,"text":413,"correct":26},"备选方案的质量常常很大程度上影响到最后决策的质量",{"key":28,"text":415,"correct":26},"按照投资决策程序，对于政府投资项目实行审批制",{"key":31,"text":417,"correct":22},"可操作性研究和项目评估是投资决策的重要手段和重要工具",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},982549,"项目施工阶段业主的采购与合同管理的工作内容不包括()。",[422,424,426,428],{"key":20,"text":423,"correct":26},"参加评标及合同谈判，商签正式合同",{"key":24,"text":425,"correct":22},"编制施工阶段各年度、月度资金使用计划并控制其执行",{"key":28,"text":427,"correct":26},"策划各甲供科目的招标方式，协调相关设计方案准备招标用图，编制招标文件",{"key":31,"text":429,"correct":26},"进行各类合同的跟踪管理并定期提供合同管理的各种报告",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":31,"analysis":33},982550,"()的风险成为主要的风险源头。",[434,436,438,440],{"key":20,"text":435,"correct":26},"设计过程",{"key":24,"text":437,"correct":26},"建设过程",{"key":28,"text":439,"correct":26},"验收过程",{"key":31,"text":403,"correct":22},{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},982551,"在项目的施工阶段，业主的管理工作内容不包括()。",[445,447,449,451],{"key":20,"text":446,"correct":26},"进度控制",{"key":24,"text":448,"correct":22},"质量控制",{"key":28,"text":450,"correct":26},"采购与合同管理",{"key":31,"text":452,"correct":26},"投资控制",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":31,"analysis":33},982552,"下列各项不属于环境影响评价的工作程序的是()。",[457,459,461,463],{"key":20,"text":458,"correct":26},"报告书编制阶段",{"key":24,"text":460,"correct":26},"正式阶段",{"key":28,"text":462,"correct":26},"准备阶段",{"key":31,"text":464,"correct":22},"审核阶段",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":28,"analysis":33},982553,"业主设有较小的管理机构，但不具有承担相应项目全面管理的经验、能力和规模，又无意解散自己的机构，则可采用()。",[469,471,472,474],{"key":20,"text":470,"correct":26},"业主委托专业管理咨询单位代理管理",{"key":24,"text":233,"correct":26},{"key":28,"text":473,"correct":22},"业主与管理咨询单位的一体化项目管理",{"key":31,"text":475,"correct":26},"由专业项目管理单位进行管理承包",{"id":477,"libraryId":5,"type":15,"typeLabel":16,"stem":478,"options":479,"answer":31,"analysis":33},982554,"空负荷试运行准备，应考虑的因素不包括()。",[480,482,484,486],{"key":20,"text":481,"correct":26},"应将试运行的准备工作和投入生产的准备工作紧密地联系在一起，特别是必须连续作业的车间和设备",{"key":24,"text":483,"correct":26},"业主应尽早筹备组建试运行机构，编制试运行与生产准备工作计划，以及这些工作的进度安排。必要时可委托专业的工程咨询机构、技术专利商、承包商承担",{"key":28,"text":485,"correct":26},"大中型工业项目总工期较长，为了有计划、有步骤地做好生产准备工作，应制订年（季、月）度试生产专业工作计划",{"key":31,"text":487,"correct":22},"中、小型建设项目总工期短，只制定一个单独生产专业工作计划即可，按照计划协调安排",{"id":489,"libraryId":5,"type":15,"typeLabel":16,"stem":490,"options":491,"answer":31,"analysis":33},982555,"工程建设项目采用EPC承包模式时，业主方应负责的工作是()。",[492,494,496,498],{"key":20,"text":493,"correct":26},"工程设计",{"key":24,"text":495,"correct":26},"工程协调与施工管理",{"key":28,"text":497,"correct":26},"设备采购",{"key":31,"text":499,"correct":22},"提供方案设计",{"id":501,"libraryId":5,"type":15,"typeLabel":16,"stem":502,"options":503,"answer":24,"analysis":33},982556,"由于个人或组织的过失、疏忽、恶意等不当行为造成财产毁损、人员伤亡的风险属于()。",[504,505,507,509],{"key":20,"text":101,"correct":26},{"key":24,"text":506,"correct":22},"行为风险",{"key":28,"text":508,"correct":26},"社会风险",{"key":31,"text":510,"correct":26},"信用风险",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":20,"analysis":33},982557,"关于工程建设项目施工质量计划的说法，错误的是()。",[515,517,519,521],{"key":20,"text":516,"correct":22},"施工质量计划应由建设单位编制",{"key":24,"text":518,"correct":26},"施工质量计划是技术交底的依据",{"key":28,"text":520,"correct":26},"施工质量计划是质量策划的标志性成果",{"key":31,"text":522,"correct":26},"施工质量计划的基本要求可包含在施工组织设计中",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":28,"analysis":33},982558,"施工单位的利益诉求，不包括()。",[527,529,531,533],{"key":20,"text":528,"correct":26},"设计单位提供的图纸没有或极少有错误",{"key":24,"text":530,"correct":26},"能够配合施工单位采用新工法",{"key":28,"text":532,"correct":22},"设计单位配合意愿强",{"key":31,"text":534,"correct":26},"设计单位具有协调专业设计分包方的能力",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":20,"analysis":33},982559,"下列关于工程建设项目风险管理计划的落实过程中应注意的事项的描述，不正确的是()。",[539,541,543,545],{"key":20,"text":540,"correct":22},"风险管理是管理人员参加的、施工周期内全过程的、动态监控的复杂管理系统",{"key":24,"text":542,"correct":26},"管理人员应做好指导、监督、检查和信息反馈或决策等工作",{"key":28,"text":544,"correct":26},"工程建设项目风险管理计划实施过程中的指导和组织协调非常重要",{"key":31,"text":546,"correct":26},"风险管理组织人员向施工人员、技术人员、现场管理人员等介绍风险管理计划的思想和内容",{"id":548,"libraryId":5,"type":15,"typeLabel":16,"stem":549,"options":550,"answer":28,"analysis":33},982560,"工程量清单计价和计量规范不适用于()的解决。",[551,553,555,557],{"key":20,"text":552,"correct":26},"招标控制价编制",{"key":24,"text":554,"correct":26},"工程合同价款的约定",{"key":28,"text":556,"correct":22},"工程定价定额",{"key":31,"text":558,"correct":26},"索赔与现场签证",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":28,"analysis":33},982561,"工程建设项目设计方在承担工程设计承包合同范围内的工作时，其身份是()。",[563,565,567,569],{"key":20,"text":564,"correct":26},"管理咨询方",{"key":24,"text":566,"correct":26},"施工方",{"key":28,"text":568,"correct":22},"承包商",{"key":31,"text":570,"correct":26},"咨询服务方",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":31,"analysis":33},982562,"工程建设项目职业健康安全与环境管理的经济性的主要表现不包括()。",[575,577,579,581],{"key":20,"text":576,"correct":26},"工程项目是特定时代的反映",{"key":24,"text":578,"correct":26},"建设工程产品是否应适应可持续发展的要求",{"key":28,"text":580,"correct":26},"建设工程应考虑建造成本和其寿命周期内使用成本消耗",{"key":31,"text":582,"correct":22},"工程项目的实施需要进行大量的横向配合和协调",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":28,"analysis":33},982563,"初步的专业工程进度计划是由()编制的。",[587,589,591,593],{"key":20,"text":588,"correct":26},"总承包商",{"key":24,"text":590,"correct":26},"业主",{"key":28,"text":592,"correct":22},"各专业工程分包商",{"key":31,"text":594,"correct":26},"管理咨询单位",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":28,"analysis":33},982564,"建安工程保险中，被保险人的索赔时效是()。",[599,601,603,605],{"key":20,"text":600,"correct":26},"自保险合同生效之日起，不超过2年",{"key":24,"text":602,"correct":26},"自保险合同生效之日起，不超过3年",{"key":28,"text":604,"correct":22},"自损失发生之日起，不超过2年",{"key":31,"text":606,"correct":26},"自损失发生之日起，不超过3年",{"id":608,"libraryId":5,"type":15,"typeLabel":16,"stem":609,"options":610,"answer":24,"analysis":33},982565,"管理咨询方根据业主委托方式选择介入工程建设项目的时机。“建造全过程管理”是指管理咨询方在()阶段即介入项目管理。",[611,613,615,617],{"key":20,"text":612,"correct":26},"项目建议书",{"key":24,"text":614,"correct":22},"设计与计划",{"key":28,"text":616,"correct":26},"施工",{"key":31,"text":618,"correct":26},"可行性研究",[620,623,626,629,632,635],{"id":15,"name":621,"category":7,"favorite":622},"领导干部任职前廉政法规知识测试题",92,{"id":624,"name":625,"category":7,"favorite":15},595,"建筑结构与设备",{"id":627,"name":628,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":630,"name":631,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":633,"name":634,"category":7,"favorite":8},534,"BIM工程师",{"id":636,"name":634,"category":7,"favorite":8},535]