[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-712-4":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":610},{"id":5,"name":6,"category":7,"favorite":8},712,"招标采购项目管理","建筑工程",0,4,50,927,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,236,248,260,268,280,292,304,316,328,340,348,360,372,384,396,408,420,432,444,456,466,478,490,502,514,526,538,550,562,574,586,598],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},982466,1,"单选题","()项目中，团队中的大部分人都是非全职性地从事项目工作。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","项目式",false,{"key":24,"text":25,"correct":22},"B","职能式",{"key":27,"text":28,"correct":29},"C","弱矩阵式",true,{"key":31,"text":32,"correct":22},"D","强矩阵式","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},982467,"在项目生命周期中，资源投入强度的一般规律是()。",[38,40,42,44],{"key":20,"text":39,"correct":29},"项目开始时小，此后逐渐增大，进入后期又减小",{"key":24,"text":41,"correct":22},"项目开始时大，此后逐渐减小，进入后期又增大",{"key":27,"text":43,"correct":22},"项目开始时小，随着项目推进，逐渐增大",{"key":31,"text":45,"correct":22},"项目开始时大，随着项目推进，逐渐减小",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},982468,"关于项目生命周期特点的说法，正确的是()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"项目资源投入强度在项目开始时较低，以后逐渐提高",{"key":24,"text":53,"correct":22},"项目资源投入强度在项目开始时较高，以后逐渐降低",{"key":27,"text":55,"correct":22},"随着项目推进，项目面临的风险和不确定性逐渐增大",{"key":31,"text":57,"correct":29},"随着项目推进，项目面临的风险和不确定性逐渐降低",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},982469,"项目团队发展的第三阶段是()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"形成阶段",{"key":24,"text":65,"correct":29},"规范阶段",{"key":27,"text":67,"correct":22},"震荡阶段",{"key":31,"text":69,"correct":22},"辉煌阶段",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},982470,"现代项目管理起源于()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"日本",{"key":24,"text":77,"correct":22},"英国",{"key":27,"text":79,"correct":22},"德国",{"key":31,"text":81,"correct":29},"美国",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},982471,"上级对下级的管理是直线关系的项目管理组织是()。",[86,88,90,92],{"key":20,"text":87,"correct":22},"职能式组织",{"key":24,"text":89,"correct":29},"项目式组织",{"key":27,"text":91,"correct":22},"矩阵式组织",{"key":31,"text":93,"correct":22},"组合式组织",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},982472,"项目管理目标得以实现的有力工具是()。",[98,100,102,104],{"key":20,"text":99,"correct":22},"绩效管理",{"key":24,"text":101,"correct":29},"过程管理",{"key":27,"text":103,"correct":22},"制定目标",{"key":31,"text":105,"correct":22},"最终检查",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},982473,"项目生命周期按四阶段划分时，下列工作内容中，属于计划阶段的是()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"成立项目基本组织",{"key":24,"text":113,"correct":22},"进行项目细节设计",{"key":27,"text":115,"correct":22},"提出项目概念",{"key":31,"text":117,"correct":29},"制定项目基本目标",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},982474,"在下列项目管理组织形式中，容易形成多头领导的是()。",[122,124,126,128],{"key":20,"text":123,"correct":22},"直线式",{"key":24,"text":125,"correct":22},"直线式和职能式",{"key":27,"text":127,"correct":29},"矩阵式",{"key":31,"text":129,"correct":22},"矩阵式和直线式",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},982475,"在项目生命周期中，项目所面临风险的变化规律是()。",[134,136,138,140],{"key":20,"text":135,"correct":22},"项目开始阶段风险较小，此后逐渐增大，结束阶段又迅速减小",{"key":24,"text":137,"correct":22},"项目开始阶段风险较大，此后逐渐降低，结束阶段又迅速增大",{"key":27,"text":139,"correct":22},"随着项目推进，风险逐渐增大",{"key":31,"text":141,"correct":29},"随着项目推进，风险逐渐减小",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},982476,"下列关于流程管理的意义的说法错误的是()。",[146,148,150,152],{"key":20,"text":147,"correct":22},"可以摈除对工作计划的重复性探索所带来的风险",{"key":24,"text":149,"correct":29},"可以消除项目管理过程的不确定性",{"key":27,"text":151,"correct":22},"可以促进管理团队成员的学习和相互合作",{"key":31,"text":153,"correct":22},"可以有效使用管理资源，提高工作效率与质量",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},982477,"项目管理目标的“四重约束”是指()之间的相互约束。",[158,160,162,164],{"key":20,"text":159,"correct":29},"范围、时间、费用、资源",{"key":24,"text":161,"correct":22},"范围、进度、资源、造价",{"key":27,"text":163,"correct":22},"质量、安全、环境、时间",{"key":31,"text":165,"correct":22},"安全、质量、造价、时间",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},982478,"下列各项中，适合创新与研发的工作方式是()。",[170,172,174,176],{"key":20,"text":171,"correct":29},"项目管理工作方式",{"key":24,"text":173,"correct":22},"运营管理工作方式",{"key":27,"text":175,"correct":22},"转向基于项目的工作方式",{"key":31,"text":177,"correct":22},"转向基于运营管理的工作方式",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},982479,"项目过程通用的动态管理方法是()。",[182,184,186,188],{"key":20,"text":183,"correct":22},"PERT法",{"key":24,"text":185,"correct":22},"WBS法",{"key":27,"text":187,"correct":29},"PDCA法",{"key":31,"text":189,"correct":22},"OBS法",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},982480,"项目管理是通过合理运用与整合各个()来实现的。",[194,196,198,200],{"key":20,"text":195,"correct":22},"项目板块",{"key":24,"text":197,"correct":22},"项目周期",{"key":27,"text":199,"correct":29},"项目管理过程组",{"key":31,"text":201,"correct":22},"项目资源",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},982481,"根据项目的生命周期理论，在项目的生命周期中资源投入最高的阶段是()。",[206,208,210,212],{"key":20,"text":207,"correct":22},"开始阶段",{"key":24,"text":209,"correct":22},"计划阶段",{"key":27,"text":211,"correct":29},"执行与控制阶段",{"key":31,"text":213,"correct":22},"结束阶段",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":27,"analysis":33},982482,"承包商一定会明确固定的开始时间与结束时间，一旦按期结束项目即已完成，而不会周而复始地进行，这体现项目的()。",[218,220,222,224],{"key":20,"text":219,"correct":22},"不断完善的渐进性",{"key":24,"text":221,"correct":22},"特定成果与目标的唯一性",{"key":27,"text":223,"correct":29},"临时的一次性",{"key":31,"text":225,"correct":22},"存在风险的不确定性",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},982483,"按照项目生命周期的四阶段划分方式，属于执行和控制阶段工作内容的是()。",[230,232,233,234],{"key":20,"text":231,"correct":22},"制订项目总体目标",{"key":24,"text":111,"correct":22},{"key":27,"text":113,"correct":29},{"key":31,"text":235,"correct":22},"总结项目执行情况",{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},982484,"项目组合管理采取的是()的管理方式。",[240,242,244,246],{"key":20,"text":241,"correct":22},"自下而上",{"key":24,"text":243,"correct":29},"自上而下",{"key":27,"text":245,"correct":22},"由内到外",{"key":31,"text":247,"correct":22},"由外到内",{"id":249,"libraryId":5,"type":15,"typeLabel":16,"stem":250,"options":251,"answer":20,"analysis":33},982485,"下列各项属于典型的效益型指标的是()。",[252,254,256,258],{"key":20,"text":253,"correct":29},"项目成本节约情况",{"key":24,"text":255,"correct":22},"小时工资率",{"key":27,"text":257,"correct":22},"品牌提升度",{"key":31,"text":259,"correct":22},"技能提升度",{"id":261,"libraryId":5,"type":15,"typeLabel":16,"stem":262,"options":263,"answer":27,"analysis":33},982486,"某招标代理机构承担一项地铁工程招标代理工作。此工作需投入较多人力，涉及较多部门，且工作持续时间较长，该工作适宜选用()组织方式。",[264,265,266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":22},{"key":27,"text":127,"correct":29},{"key":31,"text":123,"correct":22},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":24,"analysis":33},982487,"在项目管理中，项目经理的职责不包括()。",[272,274,276,278],{"key":20,"text":273,"correct":22},"对项目所在组织的职责",{"key":24,"text":275,"correct":29},"对利益相关者的职责",{"key":27,"text":277,"correct":22},"对项目和客户的职责",{"key":31,"text":279,"correct":22},"对团队成员的职责",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},982488,"项目管理方案必须从实际出发，根据项目与管理者的主客观条件和相应能力制订并为管理过程增值。这反映了项目管理方案的()特点。",[284,286,288,290],{"key":20,"text":285,"correct":22},"预见性",{"key":24,"text":287,"correct":29},"针对性",{"key":27,"text":289,"correct":22},"可操作性",{"key":31,"text":291,"correct":22},"指令性",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":20,"analysis":33},982489,"按照影响项目的方式，项目利益相关方分为()。",[296,298,300,302],{"key":20,"text":297,"correct":29},"源生项目利益相关方和衍生项目利益相关方",{"key":24,"text":299,"correct":22},"内部项目利益相关方和外部项目利益相关方",{"key":27,"text":301,"correct":22},"国内项目利益相关方和国外项目利益相关方",{"key":31,"text":303,"correct":22},"社会项目利益相关方和经济项目利益相关方",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":20,"analysis":33},982490,"为了有效地实施项目的绩效管理及考核，对项目团队及成员进行绩效考核的管理目标与标准应在()中确定。",[308,310,312,314],{"key":20,"text":309,"correct":29},"项目绩效管理计划",{"key":24,"text":311,"correct":22},"绩效沟通",{"key":27,"text":313,"correct":22},"团队组建",{"key":31,"text":315,"correct":22},"薪酬管理",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":24,"analysis":33},982491,"项目是为实现既定目标，在()的条件下开展的一次性工作。",[320,322,324,326],{"key":20,"text":321,"correct":22},"组织结构约束",{"key":24,"text":323,"correct":29},"资源约束",{"key":27,"text":325,"correct":22},"组织目标约束",{"key":31,"text":327,"correct":22},"内外环境约束",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":27,"analysis":33},982492,"项目发起人与其任命并授权的项目经理和管理团队依据双方达成的协议来实施的、双方互动检查实现项目目标的过程是()。",[332,334,336,338],{"key":20,"text":333,"correct":22},"项目管理流程的编制",{"key":24,"text":335,"correct":22},"项目的执行管理",{"key":27,"text":337,"correct":29},"项目绩效管理",{"key":31,"text":339,"correct":22},"项目的验收管理",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},982493,"下列项目管理组织方式中，具有关系单一、决策迅速特点的是()。",[344,345,346,347],{"key":20,"text":89,"correct":29},{"key":24,"text":87,"correct":22},{"key":27,"text":91,"correct":22},{"key":31,"text":93,"correct":22},{"id":349,"libraryId":5,"type":15,"typeLabel":16,"stem":350,"options":351,"answer":24,"analysis":33},982494,"职能式组织结构的主要特点是()。",[352,354,356,358],{"key":20,"text":353,"correct":22},"项目管理成员相对固定",{"key":24,"text":355,"correct":29},"一般不设专门项目经理",{"key":27,"text":357,"correct":22},"职能部门不参与决策",{"key":31,"text":359,"correct":22},"不同专业之间易于协调",{"id":361,"libraryId":5,"type":15,"typeLabel":16,"stem":362,"options":363,"answer":20,"analysis":33},982495,"国际上成立最早的项目管理国际组织是()。",[364,366,368,370],{"key":20,"text":365,"correct":29},"IPMA",{"key":24,"text":367,"correct":22},"PMRC",{"key":27,"text":369,"correct":22},"PMI",{"key":31,"text":371,"correct":22},"C-PMBOK",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":20,"analysis":33},982496,"下列各项中，能够准确描述一个完整的项目管理过程组的是()。",[376,378,380,382],{"key":20,"text":377,"correct":29},"启动过程—规划过程—执行过程—监控过程—收尾过程",{"key":24,"text":379,"correct":22},"规划过程—启动过程—执行过程—监控过程—收尾过程",{"key":27,"text":381,"correct":22},"启动过程—规划过程—监控过程—执行过程—收尾过程",{"key":31,"text":383,"correct":22},"启动过程—监控过程—规划过程—执行过程—收尾过程",{"id":385,"libraryId":5,"type":15,"typeLabel":16,"stem":386,"options":387,"answer":24,"analysis":33},982497,"对于一般的工程建设项目，项目设计不包括()。",[388,390,392,394],{"key":20,"text":389,"correct":22},"概念设计",{"key":24,"text":391,"correct":29},"技术设计",{"key":27,"text":393,"correct":22},"初步设计",{"key":31,"text":395,"correct":22},"施工图设计",{"id":397,"libraryId":5,"type":15,"typeLabel":16,"stem":398,"options":399,"answer":20,"analysis":33},982498,"可用以在约束条件下确定项目各项活动最早、最晚的开始和完成时间的方法是()。",[400,402,404,406],{"key":20,"text":401,"correct":29},"关键路径法",{"key":24,"text":403,"correct":22},"PERT图",{"key":27,"text":405,"correct":22},"横道图法",{"key":31,"text":407,"correct":22},"网络图",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":27,"analysis":33},982499,"关于工程预付款的支付与扣回，下列做法正确的是()。",[412,414,416,418],{"key":20,"text":413,"correct":22},"发包人在合同约定的开工当天支付预付款",{"key":24,"text":415,"correct":22},"包工包料工程的预付款比例为40%",{"key":27,"text":417,"correct":29},"发包人已向承包人支付的工程预付款应以充抵工程价款的方式陆续扣回",{"key":31,"text":419,"correct":22},"发包人在工程开工后的第15天内预付了当年的安全文明施工费总额的50%",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":27,"analysis":33},982500,"质量计划展现()对质量责任的承诺和保证。",[424,426,428,430],{"key":20,"text":425,"correct":22},"建设单位",{"key":24,"text":427,"correct":22},"咨询单位",{"key":27,"text":429,"correct":29},"施工单位",{"key":31,"text":431,"correct":22},"监理单位",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},982501,"下列关于工程建设项目的说法错误的是()。",[436,438,440,442],{"key":20,"text":437,"correct":22},"单项工程的施工条件往往具有相对的独立性",{"key":24,"text":439,"correct":29},"分项工程是对单项工程的再分解",{"key":27,"text":441,"correct":22},"分部工程是单位工程的组成部分，按单位工程的各个部分划分",{"key":31,"text":443,"correct":22},"建设项目可以由一个或多个单项工程组成",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":24,"analysis":33},982502,"工程项目档案的范围不包括()。",[448,450,452,454],{"key":20,"text":449,"correct":22},"与工程项目决策有关的文件",{"key":24,"text":451,"correct":29},"会议记录相关文件",{"key":27,"text":453,"correct":22},"项目实施前准备阶段的工作资料",{"key":31,"text":455,"correct":22},"相关政府主管部门的批准文件",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":31,"analysis":33},982503,"下列各项中，()不属于工程建设项目质量验收实施主体。",[460,461,462,464],{"key":20,"text":429,"correct":22},{"key":24,"text":431,"correct":22},{"key":27,"text":463,"correct":22},"设计单位",{"key":31,"text":465,"correct":29},"政府部门",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},982504,"工程建设项目职业健康安全管理的目的是()。",[470,472,474,476],{"key":20,"text":471,"correct":29},"保护施工生产者和相关人员的健康与安全",{"key":24,"text":473,"correct":22},"充分体现节能减排的社会责任",{"key":27,"text":475,"correct":22},"控制作业现场的各种环境因素对环境的污染和危害",{"key":31,"text":477,"correct":22},"使社会的经济发展与人类的生存环境相协调",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":27,"analysis":33},982505,"下列关于进度计划的说法正确的是()。",[482,484,486,488],{"key":20,"text":483,"correct":22},"项目子系统进度计划属于按进度计划的功能性不同划分的类型",{"key":24,"text":485,"correct":22},"设计进度计划属于按进度计划所涉及的工程建设项目阶段的不同划分的类型",{"key":27,"text":487,"correct":29},"项目进度总体规划属于按进度计划编制的深度划分的类型",{"key":31,"text":489,"correct":22},"年度或跨年度进度计划属于按进度计划编制主体的不同划分的类型",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":24,"analysis":33},982506,"已标价工程量清单中有适用于变更工程项目的，按()原则，调整其分部分项工程费。",[494,496,498,500],{"key":20,"text":495,"correct":22},"在合理范围内参照类似项目的单价",{"key":24,"text":497,"correct":29},"直接采用该清单项目的单价",{"key":27,"text":499,"correct":22},"承包人根据变更工程资料等和承包人报价浮动率提出变更工程项目的单价，报发包人确认后调整",{"key":31,"text":501,"correct":22},"承包人根据变更工程资料等取得有合法依据的市场价格提出变更工程项目的单价，报发包人确认后调整",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},982507,"PEST是一种从政治、经济、社会、技术等四个方面分析项目外部环境的方法，常用于项目风险管理的()过程。",[506,508,510,512],{"key":20,"text":507,"correct":29},"风险识别",{"key":24,"text":509,"correct":22},"风险估计",{"key":27,"text":511,"correct":22},"风险评价",{"key":31,"text":513,"correct":22},"风险处置",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":27,"analysis":33},982508,"下列关于泵、风机和压缩机的说法错误的是()。",[518,520,522,524],{"key":20,"text":519,"correct":22},"风机的种类主要有通风机、鼓风机、压缩机",{"key":24,"text":521,"correct":22},"按照作用原理，泵可分为动力式泵类、容积式泵类及其他类型泵",{"key":27,"text":523,"correct":29},"泵的安装顺序为泵的清洗检查、开箱检查、泵的安装和试运转",{"key":31,"text":525,"correct":22},"压缩机按作用原理可分为容积式和透平式两大类",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},982509,"经济净现值是指()。",[530,532,534,536],{"key":20,"text":531,"correct":22},"各年现金流入与现金流出的差额",{"key":24,"text":533,"correct":22},"项目在计算期内经济净效益流量的现值累计等于0时的折现率",{"key":27,"text":535,"correct":22},"按照财务基准收益率计算得出的项目计算期内净现金流量的现值和",{"key":31,"text":537,"correct":29},"项目按照社会折现率将计算期内各年的经济效益流量折现到建设期初的现值之和",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":31,"analysis":33},982510,"下列各项不属于常用的风险分析方法的是()。",[542,544,546,548],{"key":20,"text":543,"correct":22},"故障树法",{"key":24,"text":545,"correct":22},"蒙特卡罗法",{"key":27,"text":547,"correct":22},"影响图法",{"key":31,"text":549,"correct":29},"PEST分析",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":24,"analysis":33},982511,"下列关于基础性项目的说法错误的是()。",[554,556,558,560],{"key":20,"text":555,"correct":22},"可以吸收外商直接投资",{"key":24,"text":557,"correct":29},"这类建设项目应以企业作为投资主体，自主决策、自担投资风险",{"key":27,"text":559,"correct":22},"直接增强国力的符合经济规模的支柱产业项目属于基础性项目",{"key":31,"text":561,"correct":22},"主要应由政府集中必要的财力、物力",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":27,"analysis":33},982512,"工程建设项目投资巨大、工期长、参与者众多，整个建设过程都存在各种各样的风险。市场预测失误、价格波动、供求关系发生变化属于()。",[566,568,570,572],{"key":20,"text":567,"correct":22},"政治风险",{"key":24,"text":569,"correct":22},"技术风险",{"key":27,"text":571,"correct":29},"经济风险",{"key":31,"text":573,"correct":22},"信用风险",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":27,"analysis":33},982513,"因承包人原因造成的超过合同工程范围的施工或返工所涉及的工程量应该()。",[578,580,582,584],{"key":20,"text":579,"correct":22},"据实计量",{"key":24,"text":581,"correct":22},"酌情计量",{"key":27,"text":583,"correct":29},"不予以计量",{"key":31,"text":585,"correct":22},"按时计量",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":24,"analysis":33},982514,"关于施工图预算的编制，下列说法错误的是()。",[590,592,594,596],{"key":20,"text":591,"correct":22},"施工图预算的主要编制方法有单价法和实物法",{"key":24,"text":593,"correct":29},"实物法又称实物质法",{"key":27,"text":595,"correct":22},"单价法又称工料单价法",{"key":31,"text":597,"correct":22},"单位工程施工图预算由建筑安装工程费和设备及工器具购置费组成",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":31,"analysis":33},982515,"关于工业项目与带有工艺处理设备的基础设施项目试运行方式，下列说法错误的是()。",[602,604,606,608],{"key":20,"text":603,"correct":22},"在业主采用工程总承包方式时，一般会选择根据工程总承包合同，由工程总承包负责空负荷试运行，合格后即可进行竣工验收并交付业主与使用单位",{"key":24,"text":605,"correct":22},"有的行业特别规定，特大型、大型基本建设项目和大型技术改造项目，应在投料试车正常后一年内完成竣工验收",{"key":27,"text":607,"correct":22},"有的行业特别规定，中、小型建设项目应在6个月内完成竣工验收",{"key":31,"text":609,"correct":29},"项目采用施工总承包方式交付，且生产设备的采购与提供由业主负责，则业主需要安排空载试运行并在合格后进行项目的竣工验收，交付建设及使用单位后，再由他们安排投料试生产及正式的投产",[611,614,617,620,623,626],{"id":15,"name":612,"category":7,"favorite":613},"领导干部任职前廉政法规知识测试题",92,{"id":615,"name":616,"category":7,"favorite":15},595,"建筑结构与设备",{"id":618,"name":619,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":621,"name":622,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":624,"name":625,"category":7,"favorite":8},534,"BIM工程师",{"id":627,"name":625,"category":7,"favorite":8},535]