[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-712-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":613},{"id":5,"name":6,"category":7,"favorite":8},712,"招标采购项目管理","建筑工程",0,3,50,927,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,199,211,223,235,247,259,271,283,295,307,319,330,342,354,364,374,386,398,410,421,433,445,457,469,481,493,505,517,529,541,553,565,577,589,601],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},982416,1,"单选题","业主拟采购一套精密设备，考虑到采购过程有一定的技术难度，选择了有丰富的类似设备采购经验的一家招标代理机构，这属于风险应对策略中的()。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","风险规避",false,{"key":24,"text":25,"correct":22},"B","风险转移",{"key":27,"text":28,"correct":22},"C","风险自留",{"key":30,"text":31,"correct":32},"D","风险降低",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":30,"analysis":33},982417,"()将对大宗的进口设备采购的项目的招标工作带来革命性的突破。",[38,40,42,44],{"key":20,"text":39,"correct":22},"远程视讯系统",{"key":24,"text":41,"correct":22},"计算机网络系统",{"key":27,"text":43,"correct":22},"Internet网络",{"key":30,"text":45,"correct":32},"电子招标交易系统",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":30,"analysis":33},982418,"对招标采购风险估计的方法，主要选择()。",[50,52,54,56],{"key":20,"text":51,"correct":22},"类比估计法",{"key":24,"text":53,"correct":22},"自上而下估计法",{"key":27,"text":55,"correct":22},"自下而上估计法",{"key":30,"text":57,"correct":32},"主观概率估计法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":27,"analysis":33},982419,"招标采购信息管理的特点不包括()。",[62,64,66,68],{"key":20,"text":63,"correct":22},"时间跨度长",{"key":24,"text":65,"correct":22},"招标采购信息涉及各个项目相关方",{"key":27,"text":67,"correct":32},"招标采购信息具有稳定性和协调性",{"key":30,"text":69,"correct":22},"动态调整要求高",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},982420,"招标采购项目进度计划的编制步骤是()。",[74,76,78,80],{"key":20,"text":75,"correct":22},"项目背景描述→组建采购团队→确定合同包的划分→进度计划制定→平衡各工作管理因素的相互关系",{"key":24,"text":77,"correct":32},"确定各项工作的先后顺序→估计出各工作的延续时间→确定招标采购工作的时间进度→平衡各工作管理因素的相互关系→应用相关工具编制进度计划",{"key":27,"text":79,"correct":22},"平衡各工作管理因素的相互关系→工作结构分解→确定工作逻辑关系→估计工作持续时间→进度计划制定",{"key":30,"text":81,"correct":22},"招标工作列表→项目特性描述→确定工作逻辑关系→估计工作持续时间→应用相关工具编制进度计划",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},982421,"从招标采购项目十大管理任务的工作内容分析，编制招标采购项目管理方案属于()的工作内容。",[86,88,90,92],{"key":20,"text":87,"correct":22},"采购管理",{"key":24,"text":89,"correct":22},"范围管理",{"key":27,"text":91,"correct":22},"质量管理",{"key":30,"text":93,"correct":32},"整合管理",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},982422,"招标采购费用估计应该与招标工作()相联系。",[98,100,102,104],{"key":20,"text":99,"correct":32},"质量的结果",{"key":24,"text":101,"correct":22},"范围的大小",{"key":27,"text":103,"correct":22},"风险程度",{"key":30,"text":105,"correct":22},"进度情况",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},982423,"招标采购项目风险类别中，因信息不对称产生的风险是()。",[110,112,114,116],{"key":20,"text":111,"correct":22},"利率风险",{"key":24,"text":113,"correct":22},"政治风险",{"key":27,"text":115,"correct":32},"道德风险",{"key":30,"text":117,"correct":22},"汇率风险",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":24,"analysis":33},982424,"()对于招标项目的成功实施是至关重要的。",[122,124,126,128],{"key":20,"text":123,"correct":22},"工艺关系的确定",{"key":24,"text":125,"correct":32},"组织关系的确定",{"key":27,"text":127,"correct":22},"项目招标工作列表",{"key":30,"text":129,"correct":22},"实施过程中的限制和假设",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},982425,"()是招标采购活动具体的采购成果，是项目风险管理的重要手段。",[134,136,138,140],{"key":20,"text":135,"correct":22},"招标文件",{"key":24,"text":137,"correct":32},"项目合同",{"key":27,"text":139,"correct":22},"合同管理",{"key":30,"text":141,"correct":22},"文件管理",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},982426,"()是招标采购团队存在的基础。",[146,148,150,152],{"key":20,"text":147,"correct":32},"共同的目标",{"key":24,"text":149,"correct":22},"有效的沟通",{"key":27,"text":151,"correct":22},"共同的价值观",{"key":30,"text":153,"correct":22},"共同的标准",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},982427,"项目经理在中标通知书的工作中职责是()。",[158,160,162,164],{"key":20,"text":159,"correct":32},"必须通报的",{"key":24,"text":161,"correct":22},"必须咨询的",{"key":27,"text":163,"correct":22},"决定性决策",{"key":30,"text":165,"correct":22},"部分或参与决策",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":30,"analysis":33},982428,"下列工作任务中，属于招标采购项目范围管理的是()。",[170,172,174,176],{"key":20,"text":171,"correct":22},"确定招标采购服务的总体目标。",{"key":24,"text":173,"correct":22},"制定招标采购管理流程",{"key":27,"text":175,"correct":22},"确定服务质量标准",{"key":30,"text":177,"correct":32},"合理划分标段与合同包",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},982429,"跟踪分析报告重点应分析()对于招标采购活动的影响。",[182,184,186,188],{"key":20,"text":183,"correct":32},"跟踪结果",{"key":24,"text":185,"correct":22},"跟踪范围",{"key":27,"text":187,"correct":22},"跟踪内容",{"key":30,"text":189,"correct":22},"跟踪方法",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},982430,"在招标采购工作中，造价工程师在编制招标文件中的责任是()。",[194,195,196,197],{"key":20,"text":163,"correct":22},{"key":24,"text":161,"correct":22},{"key":27,"text":159,"correct":32},{"key":30,"text":198,"correct":22},"参与决策",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":30,"analysis":33},982431,"关于招标采购质量管理的特点，下列说法不正确的是()。",[203,205,207,209],{"key":20,"text":204,"correct":22},"服务质量标准难以预先确定",{"key":24,"text":206,"correct":22},"服务的提供与使用具有同步性",{"key":27,"text":208,"correct":22},"招标内容的多样性",{"key":30,"text":210,"correct":32},"招标服务质量可以在检查合格后再交付客户",{"id":212,"libraryId":5,"type":15,"typeLabel":16,"stem":213,"options":214,"answer":30,"analysis":33},982432,"进度管理中进度安排要素的主要内容不包括()。",[215,217,219,221],{"key":20,"text":216,"correct":22},"进度编制",{"key":24,"text":218,"correct":22},"时间估计",{"key":27,"text":220,"correct":22},"成本估计",{"key":30,"text":222,"correct":32},"进度目标细化",{"id":224,"libraryId":5,"type":15,"typeLabel":16,"stem":225,"options":226,"answer":27,"analysis":33},982433,"工作之间的工艺关系通常是不可调整的，主要依赖于()的限制。",[227,229,231,233],{"key":20,"text":228,"correct":22},"管理方面",{"key":24,"text":230,"correct":22},"组织方面",{"key":27,"text":232,"correct":32},"技术方面",{"key":30,"text":234,"correct":22},"经济方面",{"id":236,"libraryId":5,"type":15,"typeLabel":16,"stem":237,"options":238,"answer":20,"analysis":33},982434,"项目管理可以有效地应用于招标采购管理的主要依据是()。",[239,241,243,245],{"key":20,"text":240,"correct":32},"采购管理属于项目管理的主要内容",{"key":24,"text":242,"correct":22},"招标采购工作具有项目的基本属性",{"key":27,"text":244,"correct":22},"招标采购的主要目标是价格目标",{"key":30,"text":246,"correct":22},"招标采购的工作重点是控制成本",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":30,"analysis":33},982435,"()是招标采购活动的根本目的。",[251,253,255,257],{"key":20,"text":252,"correct":22},"价格合理低价",{"key":24,"text":254,"correct":22},"合同完善无歧义",{"key":27,"text":256,"correct":22},"中标、合同、结算价格基本一致",{"key":30,"text":258,"correct":32},"采购到符合质量要求的工程、货物和服务",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":27,"analysis":33},982436,"为实现招标采购项目成本控制目标，应采取的措施包括()。",[263,265,267,269],{"key":20,"text":264,"correct":22},"确保招标文件系统严谨、逻辑合理",{"key":24,"text":266,"correct":22},"定期对里程碑计划的执行进行检查",{"key":27,"text":268,"correct":32},"采用项目群管理方式合理安排人力资源",{"key":30,"text":270,"correct":22},"掌握项目总体进度对招标采购工作时间的要求",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":24,"analysis":33},982437,"招标采购沟通计划的重点不包括()。",[275,277,279,281],{"key":20,"text":276,"correct":22},"总结报告",{"key":24,"text":278,"correct":32},"编制招标文件",{"key":27,"text":280,"correct":22},"招标内容的发布",{"key":30,"text":282,"correct":22},"潜在委托项目的信息收集",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":30,"analysis":33},982438,"开标后，招标人为了有效控制定标决策风险，可采用的措施是()。",[287,289,291,293],{"key":20,"text":288,"correct":22},"科学设定评标标准",{"key":24,"text":290,"correct":22},"实行投标保证金制度",{"key":27,"text":292,"correct":22},"严格审查评标报告",{"key":30,"text":294,"correct":32},"合理设置合同条款",{"id":296,"libraryId":5,"type":15,"typeLabel":16,"stem":297,"options":298,"answer":30,"analysis":33},982439,"采购信息管理的措施之一是标准化，通过标准化可最终形成采购信息系统的()。",[299,301,303,305],{"key":20,"text":300,"correct":22},"数据流程图、资源分配图",{"key":24,"text":302,"correct":22},"资源分配图、组织结构图",{"key":27,"text":304,"correct":22},"组织结构图、业务流程图",{"key":30,"text":306,"correct":32},"业务流程图、数据流程图",{"id":308,"libraryId":5,"type":15,"typeLabel":16,"stem":309,"options":310,"answer":30,"analysis":33},982440,"关于政府对招标采购活动的行政监督职能，下列说法错误的是()。",[311,313,315,317],{"key":20,"text":312,"correct":22},"评委确定方式、抽取和评标活动监督",{"key":24,"text":314,"correct":22},"对投标人违法行为的监督和处理",{"key":27,"text":316,"correct":22},"对重大建设项目进行各类稽查",{"key":30,"text":318,"correct":32},"审查招标从业人员的资格",{"id":320,"libraryId":5,"type":15,"typeLabel":16,"stem":321,"options":322,"answer":30,"analysis":33},982441,"招标代理机构收集各种类型项目的采购案例，从中总结经验和教训，以避免失误。该项工作属于招标采购()的工作内容。",[323,324,326,328],{"key":20,"text":89,"correct":22},{"key":24,"text":325,"correct":22},"风险管理",{"key":27,"text":327,"correct":22},"综合管理",{"key":30,"text":329,"correct":32},"信息管理",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},982442,"由于招标采购活动的成本中大部分属于人力资源费用，对于招标代理机构而言，其成本控制的关键是()。",[334,336,338,340],{"key":20,"text":335,"correct":22},"执行严格的法定程序",{"key":24,"text":337,"correct":32},"组建合理、高效的招标工作团队",{"key":27,"text":339,"correct":22},"建设并完善市场信息库",{"key":30,"text":341,"correct":22},"厉行节约，减少额外费用开支",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":30,"analysis":33},982443,"编制招标采购项目进度计划时，不作为编制依据的是()。",[346,348,350,352],{"key":20,"text":347,"correct":22},"各项工作的时间估计",{"key":24,"text":349,"correct":22},"项目采购的技术经济条件",{"key":27,"text":351,"correct":22},"法律法规的时限规定",{"key":30,"text":353,"correct":32},"项目经理的权限和责任",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":20,"analysis":33},982444,"从风险管理的角度，投标担保属于风险应对措施中的()。",[358,359,360,362],{"key":20,"text":25,"correct":32},{"key":24,"text":28,"correct":22},{"key":27,"text":361,"correct":22},"风险控制",{"key":30,"text":363,"correct":22},"风险回避",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":27,"analysis":33},982445,"在招标信息管理过程中，使用()，只需要将项目的基本信息录入系统，系统便会自动生成多种专业表格文件。",[368,370,371,373],{"key":20,"text":369,"correct":22},"多媒体计算机技术",{"key":24,"text":43,"correct":22},{"key":27,"text":372,"correct":32},"招标文件生成系统",{"key":30,"text":41,"correct":22},{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":20,"analysis":33},982446,"各种风险往往通过()体现演变特征。",[378,380,382,384],{"key":20,"text":379,"correct":32},"信息",{"key":24,"text":381,"correct":22},"预测",{"key":27,"text":383,"correct":22},"沟通",{"key":30,"text":385,"correct":22},"管理",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":30,"analysis":33},982447,"在招标代理工作的责任分配矩阵中，采用字母来表示工作参与角色或责任时，字母D代表()。",[390,392,394,396],{"key":20,"text":391,"correct":22},"执行工作",{"key":24,"text":393,"correct":22},"控制进度",{"key":27,"text":395,"correct":22},"需要培训工作",{"key":30,"text":397,"correct":32},"单独或决定性决策",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},982448,"下列关于招标方案的制订说法错误的是()。",[402,404,406,408],{"key":20,"text":403,"correct":22},"招标方案的制订需要在招标采购实施启动前做好",{"key":24,"text":405,"correct":32},"大、中型项目的招标采购，招标方案可以与招标采购项目管理方案合一",{"key":27,"text":407,"correct":22},"招标方案针对所采购对象，可区分招标类型或标段（合同包）分开进行",{"key":30,"text":409,"correct":22},"招标方案编制中应及时调整招标方案并启动项目管理的“变更程序”",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":27,"analysis":33},982449,"下列各项不属于减轻风险的措施的是()。",[414,416,418,419],{"key":20,"text":415,"correct":22},"风险分散",{"key":24,"text":417,"correct":22},"风险分离",{"key":27,"text":25,"correct":32},{"key":30,"text":420,"correct":22},"后备应急措施",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":27,"analysis":33},982450,"采购管理的生命周期不包括()。",[425,427,429,431],{"key":20,"text":426,"correct":22},"规划采购",{"key":24,"text":428,"correct":22},"实施采购",{"key":27,"text":430,"correct":32},"组织采购",{"key":30,"text":432,"correct":22},"管理采购",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":30,"analysis":33},982451,"()是保证项目招标采购成功、降低项目风险的重要标志。",[437,439,441,443],{"key":20,"text":438,"correct":22},"对投资的控制标准",{"key":24,"text":440,"correct":22},"对投资的控制结果",{"key":27,"text":442,"correct":22},"对项目的质量、进度和成本的控制标准",{"key":30,"text":444,"correct":32},"对项目的质量、进度和成本的控制结果",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":30,"analysis":33},982452,"下列关于规避风险的表述错误的是()。",[449,451,453,455],{"key":20,"text":450,"correct":22},"风险规避是要规避风险可能造成的损失",{"key":24,"text":452,"correct":22},"风险规避包括降低损失发生的几率和降低损失程度",{"key":27,"text":454,"correct":22},"降低损失发生的几率主要采取的是事先控制",{"key":30,"text":456,"correct":32},"风险规避意味着完全消除风险",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":20,"analysis":33},982453,"()可以规避决策风险造成招标人的损失。",[461,463,465,467],{"key":20,"text":462,"correct":32},"科学策划和编制招标文件",{"key":24,"text":464,"correct":22},"投标担保",{"key":27,"text":466,"correct":22},"资格预审",{"key":30,"text":468,"correct":22},"评标委员会评标",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":24,"analysis":33},982454,"下列关于招标采购项目方案策划的表述，错误的是()。",[473,475,477,479],{"key":20,"text":474,"correct":22},"应围绕项目实施过程的各种管理需求，展开合同制定各种管理因素的分析与评价",{"key":24,"text":476,"correct":32},"招标采购的关键是方案策划，策划正确的项目一定成功",{"key":27,"text":478,"correct":22},"应确保合同制定的条款质量符合项目目标要求",{"key":30,"text":480,"correct":22},"策划的基点是充分满足项目实施的风险预防需求",{"id":482,"libraryId":5,"type":15,"typeLabel":16,"stem":483,"options":484,"answer":30,"analysis":33},982455,"招标采购项目进度管理中，确定招标工作排序的基础性工作是()。",[485,487,489,491],{"key":20,"text":486,"correct":22},"项目采购时间要求",{"key":24,"text":488,"correct":22},"采购工作持续时间",{"key":27,"text":490,"correct":22},"采购工作资源条件",{"key":30,"text":492,"correct":32},"制订项目招标工作内容",{"id":494,"libraryId":5,"type":15,"typeLabel":16,"stem":495,"options":496,"answer":24,"analysis":33},982456,"与工程建设项目进度计划不同，招标采购进度计划必须()。",[497,499,501,503],{"key":20,"text":498,"correct":22},"保证服务效果满足客户明确的需要",{"key":24,"text":500,"correct":32},"服从于整体项目进度要求",{"key":27,"text":502,"correct":22},"保证服务效果满足客户隐含的需要",{"key":30,"text":504,"correct":22},"适应采购项目管理组织方式",{"id":506,"libraryId":5,"type":15,"typeLabel":16,"stem":507,"options":508,"answer":24,"analysis":33},982457,"按照PDCA方法循环开展项目质量管理工作时，P阶段的工作内容是()。",[509,511,513,515],{"key":20,"text":510,"correct":22},"确定质量改进目标，制订改进措施",{"key":24,"text":512,"correct":32},"明确质量目标，提出质量管理程序",{"key":27,"text":514,"correct":22},"采取应急措施，解决质量问题",{"key":30,"text":516,"correct":22},"规范质量行为，组织实施质量计划",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":24,"analysis":33},982458,"某企业需要对某生产设备进行技术改造，这项工作专业性强、涉及范围小、工期短，其采用的项目管理组织是()组织。",[521,523,525,527],{"key":20,"text":522,"correct":22},"项目式",{"key":24,"text":524,"correct":32},"职能式",{"key":27,"text":526,"correct":22},"矩阵式",{"key":30,"text":528,"correct":22},"组合式",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":24,"analysis":33},982459,"在项目管理目标的制定中，实现目标的执行方法应授权相应的()根据项目具体情况自行确定。",[533,535,537,539],{"key":20,"text":534,"correct":22},"项目发起人及项目经理",{"key":24,"text":536,"correct":32},"项目经理及管理团队",{"key":27,"text":538,"correct":22},"项目投资人及项目经理",{"key":30,"text":540,"correct":22},"项目承包商及供应商",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":27,"analysis":33},982460,"项目生命周期中，开始阶段需要完成的工作是()。",[545,547,549,551],{"key":20,"text":546,"correct":22},"进行项目细节设计",{"key":24,"text":548,"correct":22},"制定项目基本目标",{"key":27,"text":550,"correct":32},"成立项目基本组织",{"key":30,"text":552,"correct":22},"编制资源需求计划",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":20,"analysis":33},982461,"关于多项目集成管理与项目管理组织方式关系的说法，正确的是()。",[557,559,561,563],{"key":20,"text":558,"correct":32},"项目群管理是矩阵式组织方式的特殊运用",{"key":24,"text":560,"correct":22},"项目群组织方式不能与项目式组织方式相结合",{"key":27,"text":562,"correct":22},"项目组合管理是组合式组织方式的特殊运用",{"key":30,"text":564,"correct":22},"项目组合管理不能与职能式组织方式相结合",{"id":566,"libraryId":5,"type":15,"typeLabel":16,"stem":567,"options":568,"answer":20,"analysis":33},982462,"根据项目生命周期阶段划分理论，提出项目概念、进行项目界定的工作，应当在()阶段完成。",[569,571,573,575],{"key":20,"text":570,"correct":32},"启动",{"key":24,"text":572,"correct":22},"计划",{"key":27,"text":574,"correct":22},"控制",{"key":30,"text":576,"correct":22},"执行",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":24,"analysis":33},982463,"下列各项中，不属于项目管理过程组中执行过程的管理活动的是()。",[581,583,585,587],{"key":20,"text":582,"correct":22},"组织和协调入力资源及其他资源",{"key":24,"text":584,"correct":32},"编制工作方案",{"key":27,"text":586,"correct":22},"组织和协调各项工作",{"key":30,"text":588,"correct":22},"激励项目团队去完成既定的工作计划",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":20,"analysis":33},982464,"在项目管理中，前一个管理任务包所含工作的完成都构成后一个管理任务包所开始的充分和必要条件，具备此特点的管理流程称为()管理流程。",[593,595,597,599],{"key":20,"text":594,"correct":32},"瀑布式",{"key":24,"text":596,"correct":22},"里程碑式",{"key":27,"text":598,"correct":22},"网络式",{"key":30,"text":600,"correct":22},"快速式",{"id":602,"libraryId":5,"type":15,"typeLabel":16,"stem":603,"options":604,"answer":27,"analysis":33},982465,"项目总体管理目标应由()制订。",[605,607,609,611],{"key":20,"text":606,"correct":22},"项目总承包单位",{"key":24,"text":608,"correct":22},"政府主管部门",{"key":27,"text":610,"correct":32},"项目发起人",{"key":30,"text":612,"correct":22},"项目招标代理机构",[614,617,620,623,626,629],{"id":15,"name":615,"category":7,"favorite":616},"领导干部任职前廉政法规知识测试题",92,{"id":618,"name":619,"category":7,"favorite":15},595,"建筑结构与设备",{"id":621,"name":622,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":624,"name":625,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":627,"name":628,"category":7,"favorite":8},534,"BIM工程师",{"id":630,"name":628,"category":7,"favorite":8},535]