[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-712-2":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":605},{"id":5,"name":6,"category":7,"favorite":8},712,"招标采购项目管理","建筑工程",0,2,50,927,[13,34,46,57,69,81,93,105,117,129,141,153,165,177,189,201,213,225,237,247,259,269,281,293,305,317,329,341,353,365,373,385,397,409,421,433,445,455,467,479,491,501,513,525,537,549,561,569,581,593],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},982366,1,"单选题","双代号网络图中，工作是用()表示的。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","节点及其编号",false,{"key":24,"text":25,"correct":26},"B","箭线及其两端节点编号",true,{"key":28,"text":29,"correct":22},"C","箭线及其终点节点编号",{"key":31,"text":32,"correct":22},"D","箭线及其始点节点编号","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},982367,"某工程双代号网络计划中，工作C有两项紧前工作A和B。工作A的最早开始时间为10，持续时间为5；工作B的最早开始时间为14，持续时间为4。则工作C的最早开始时间为()。",[38,40,42,44],{"key":20,"text":39,"correct":22},"10",{"key":24,"text":41,"correct":22},"14",{"key":28,"text":43,"correct":22},"15",{"key":31,"text":45,"correct":26},"18",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},982368,"某网络计划中，A工作有两项紧后工作 B、 C，已知B工作的最迟完成时间为24，持续时间为6；C工作的最迟完成时间为28，持续时间为12，则A工作的最迟完成时间是()。",[50,52,53,55],{"key":20,"text":51,"correct":26},"16",{"key":24,"text":45,"correct":22},{"key":28,"text":54,"correct":22},"24",{"key":31,"text":56,"correct":22},"28",{"id":58,"libraryId":5,"type":15,"typeLabel":16,"stem":59,"options":60,"answer":20,"analysis":33},982369,"为完成项目的作业活动需要不同的资源，耗费的成本较多，其中的估算成本属于()的工作内容。",[61,63,65,67],{"key":20,"text":62,"correct":26},"项目成本管理",{"key":24,"text":64,"correct":22},"项目进度管理",{"key":28,"text":66,"correct":22},"项目质量管理",{"key":31,"text":68,"correct":22},"项目综合管理",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":28,"analysis":33},982370,"下列各项不属于招标采购检查方法的是()。",[73,75,77,79],{"key":20,"text":74,"correct":22},"专项检查",{"key":24,"text":76,"correct":22},"日常检查",{"key":28,"text":78,"correct":26},"定期检查",{"key":31,"text":80,"correct":22},"联合检查",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":28,"analysis":33},982371,"下列关于招标采购评价特点的描述错误的是()。",[85,87,89,91],{"key":20,"text":86,"correct":22},"招标采购项目评价的本质也是一种总结和改进",{"key":24,"text":88,"correct":22},"总结是指招标采购项目完成后评估招标采购项目管理完成的满足度",{"key":28,"text":90,"correct":26},"招标采购项目层面上的评价包括廉洁自律、工作效率、专业人员队伍建设",{"key":31,"text":92,"correct":22},"总结是在项目跟踪的基础上对整个招标采购实施全过程或某一阶段的绩效与招标项目管理成果的总结评价",{"id":94,"libraryId":5,"type":15,"typeLabel":16,"stem":95,"options":96,"answer":24,"analysis":33},982372,"下列各项不属于项目总结的内容的是()。",[97,99,101,103],{"key":20,"text":98,"correct":22},"招标程序工作的满意度",{"key":24,"text":100,"correct":26},"招标文件资料的归档",{"key":28,"text":102,"correct":22},"对招标文件的再评价",{"key":31,"text":104,"correct":22},"反思招标文件中的商务和技术条款是否设置恰当",{"id":106,"libraryId":5,"type":15,"typeLabel":16,"stem":107,"options":108,"answer":24,"analysis":33},982373,"下列关于招标采购目标的说法错误的是()。",[109,111,113,115],{"key":20,"text":110,"correct":22},"从满足招标采购项目整体利益的最大化为出发点",{"key":24,"text":112,"correct":26},"招标采购不限时间",{"key":28,"text":114,"correct":22},"招标采购的目标要求控制采购过程所发生的费用",{"key":31,"text":116,"correct":22},"招标采购的目标是多层次、多系统的目标群",{"id":118,"libraryId":5,"type":15,"typeLabel":16,"stem":119,"options":120,"answer":28,"analysis":33},982374,"对于招标方来说，由于信息不对称对投标方的信息掌握的不完全，其主要风险来自于()。",[121,123,125,127],{"key":20,"text":122,"correct":22},"招标的结果",{"key":24,"text":124,"correct":22},"招标的方式",{"key":28,"text":126,"correct":26},"投标方的行为",{"key":31,"text":128,"correct":22},"评标委员会成员的意见",{"id":130,"libraryId":5,"type":15,"typeLabel":16,"stem":131,"options":132,"answer":31,"analysis":33},982375,"下列招标采购项目质量管理的服务要素中，属于质量管理方案内容的是()。",[133,135,137,139],{"key":20,"text":134,"correct":22},"过程控制点设置",{"key":24,"text":136,"correct":22},"招标方式",{"key":28,"text":138,"correct":22},"验收标准",{"key":31,"text":140,"correct":26},"组织机构",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":28,"analysis":33},982376,"编制招标采购项目管理方案的注意事项不包括()。",[145,147,149,151],{"key":20,"text":146,"correct":22},"设定适当的质量标准",{"key":24,"text":148,"correct":22},"经济性",{"key":28,"text":150,"correct":26},"组织结构合理",{"key":31,"text":152,"correct":22},"风险责任分配",{"id":154,"libraryId":5,"type":15,"typeLabel":16,"stem":155,"options":156,"answer":20,"analysis":33},982377,"招标采购服务项目质量控制的目标是()。",[157,159,161,163],{"key":20,"text":158,"correct":26},"招标采购合理低价",{"key":24,"text":160,"correct":22},"质量保证体系完善",{"key":28,"text":162,"correct":22},"项目人员职责明确",{"key":31,"text":164,"correct":22},"过程控制点设置合理",{"id":166,"libraryId":5,"type":15,"typeLabel":16,"stem":167,"options":168,"answer":20,"analysis":33},982378,"招标采购项目经理的基本权限不包括()。",[169,171,173,175],{"key":20,"text":170,"correct":26},"承接项目的决定权",{"key":24,"text":172,"correct":22},"财务决策权",{"key":28,"text":174,"correct":22},"项目团队的组建权",{"key":31,"text":176,"correct":22},"项目实施控制权",{"id":178,"libraryId":5,"type":15,"typeLabel":16,"stem":179,"options":180,"answer":31,"analysis":33},982379,"招标采购项目管理方案的特点不包括()。",[181,183,185,187],{"key":20,"text":182,"correct":22},"层次性",{"key":24,"text":184,"correct":22},"基础性",{"key":28,"text":186,"correct":22},"集成性",{"key":31,"text":188,"correct":26},"广泛性",{"id":190,"libraryId":5,"type":15,"typeLabel":16,"stem":191,"options":192,"answer":24,"analysis":33},982380,"下列各项不属于采购合同的是()。",[193,195,197,199],{"key":20,"text":194,"correct":22},"协议",{"key":24,"text":196,"correct":26},"卖方发票",{"key":28,"text":198,"correct":22},"一致意见",{"key":31,"text":200,"correct":22},"订购单",{"id":202,"libraryId":5,"type":15,"typeLabel":16,"stem":203,"options":204,"answer":31,"analysis":33},982381,"下列关于招标采购标准化管理特点的说法错误的是()。",[205,207,209,211],{"key":20,"text":206,"correct":22},"标准化管理融政策性、技术性为一体",{"key":24,"text":208,"correct":22},"标准化管理贯穿项目整体项目管理的全过程",{"key":28,"text":210,"correct":22},"招标采购的标准化具有连续性",{"key":31,"text":212,"correct":26},"招标采购的标准化具有静态稳定性",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":28,"analysis":33},982382,"招标采购项目人力资源计划编制的依据不包括()。",[217,219,221,223],{"key":20,"text":218,"correct":22},"人力资源安排描述",{"key":24,"text":220,"correct":22},"招标工作进度计划",{"key":28,"text":222,"correct":26},"招标工作费用计划",{"key":31,"text":224,"correct":22},"招标工作分解",{"id":226,"libraryId":5,"type":15,"typeLabel":16,"stem":227,"options":228,"answer":31,"analysis":33},982383,"()可以规避不具备招标文件规定资格的单位投标及不当竞争造成的风险。",[229,231,233,235],{"key":20,"text":230,"correct":22},"科学策划和编制招标文件",{"key":24,"text":232,"correct":22},"投标担保",{"key":28,"text":234,"correct":22},"履约担保",{"key":31,"text":236,"correct":26},"资格预审",{"id":238,"libraryId":5,"type":15,"typeLabel":16,"stem":239,"options":240,"answer":24,"analysis":33},982384,"在招标采购过程中，可通过()来转移供应商行为可能带来的信用风险。",[241,242,244,245],{"key":20,"text":234,"correct":22},{"key":24,"text":243,"correct":26},"保证保险",{"key":28,"text":232,"correct":22},{"key":31,"text":246,"correct":22},"合同担保",{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":28,"analysis":33},982385,"控制或减少各种意外损失，实现招标采购预期目标的活动称为()。",[251,253,255,257],{"key":20,"text":252,"correct":22},"招标采购",{"key":24,"text":254,"correct":22},"招标采购信息管理",{"key":28,"text":256,"correct":26},"招标采购风险管理",{"key":31,"text":258,"correct":22},"招标采购质量管理",{"id":260,"libraryId":5,"type":15,"typeLabel":16,"stem":261,"options":262,"answer":24,"analysis":33},982386,"下列各项不属于开标前的风险监控内容的是()。",[263,265,267,268],{"key":20,"text":264,"correct":22},"严格资格预审",{"key":24,"text":266,"correct":26},"合同履约担保",{"key":28,"text":230,"correct":22},{"key":31,"text":232,"correct":22},{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":20,"analysis":33},982387,"项目评价的最主要特点是具有()。",[273,275,277,279],{"key":20,"text":274,"correct":26},"反馈性",{"key":24,"text":276,"correct":22},"透明性",{"key":28,"text":278,"correct":22},"全面性",{"key":31,"text":280,"correct":22},"可信性",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},982388,"招标采购风险是招标采购的实际结果与预期目标相偏离的()。",[285,287,289,291],{"key":20,"text":286,"correct":22},"范围",{"key":24,"text":288,"correct":26},"程度和可能性",{"key":28,"text":290,"correct":22},"作用力",{"key":31,"text":292,"correct":22},"过程",{"id":294,"libraryId":5,"type":15,"typeLabel":16,"stem":295,"options":296,"answer":28,"analysis":33},982389,"关于招标采购评价的内容，下列描述错误的是()。",[297,299,301,303],{"key":20,"text":298,"correct":22},"项目评价的内容包括全部招标活动的回顾和招标活动绩效方面的评价",{"key":24,"text":300,"correct":22},"在程序方面包括公开性、公平性和公正性的评价",{"key":28,"text":302,"correct":26},"绩效方面的评价主要是评价合同制定的情况",{"key":31,"text":304,"correct":22},"招标文件编制是否符合基本规定，内容是否完备属于全部招标采购活动回顾",{"id":306,"libraryId":5,"type":15,"typeLabel":16,"stem":307,"options":308,"answer":28,"analysis":33},982390,"招标采购项目风险管理中，为有效规避来自于招标人内部人员的道德风险，适宜采用的风险应对策略是()。",[309,311,313,315],{"key":20,"text":310,"correct":22},"实行资格预审",{"key":24,"text":312,"correct":22},"完善合同条款",{"key":28,"text":314,"correct":26},"评标委员会评标",{"key":31,"text":316,"correct":22},"提交投标保证金",{"id":318,"libraryId":5,"type":15,"typeLabel":16,"stem":319,"options":320,"answer":20,"analysis":33},982391,"下列关于项目采购管理内容的说法错误的是()。",[321,323,325,327],{"key":20,"text":322,"correct":26},"从项目组织内部获得服务。",{"key":24,"text":324,"correct":22},"从项目组织外部采购产品",{"key":28,"text":326,"correct":22},"合同由具有相应权限的项目团队成员签发",{"key":31,"text":328,"correct":22},"管理合同或订购单",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":24,"analysis":33},982392,"下列各项不属于招标采购外部风险的是()。",[333,335,337,339],{"key":20,"text":334,"correct":22},"政策风险",{"key":24,"text":336,"correct":26},"合同风险",{"key":28,"text":338,"correct":22},"经济风险",{"key":31,"text":340,"correct":22},"供应商风险",{"id":342,"libraryId":5,"type":15,"typeLabel":16,"stem":343,"options":344,"answer":20,"analysis":33},982393,"下列各项属于项目招标采购决策风险的是()。",[345,347,349,351],{"key":20,"text":346,"correct":26},"屈从领导决定",{"key":24,"text":348,"correct":22},"管理人员责任心差",{"key":28,"text":350,"correct":22},"涉及深化风险",{"key":31,"text":352,"correct":22},"市场信息失真",{"id":354,"libraryId":5,"type":15,"typeLabel":16,"stem":355,"options":356,"answer":24,"analysis":33},982394,"为实现招标采购流程的标准化，招标人、招标代理人可应用()软件达到目的。",[357,359,361,363],{"key":20,"text":358,"correct":22},"系统",{"key":24,"text":360,"correct":26},"专用",{"key":28,"text":362,"correct":22},"网络",{"key":31,"text":364,"correct":22},"视频",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":31,"analysis":33},982395,"下列风险应对方法中，属于风险规避的是()。",[369,370,371,372],{"key":20,"text":266,"correct":22},{"key":24,"text":232,"correct":22},{"key":28,"text":243,"correct":22},{"key":31,"text":236,"correct":26},{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":31,"analysis":33},982396,"项目外部因素跟踪的目的不包括()。",[377,379,381,383],{"key":20,"text":378,"correct":22},"对应环境的变化，了解分析其影响",{"key":24,"text":380,"correct":22},"确定应对环境变化的最终解决方案",{"key":28,"text":382,"correct":22},"为解决其他同类项目的合同问题提供基础信息和资料",{"key":31,"text":384,"correct":26},"了解并分析实际偏差对合同履行的影响和在必要时向项目管理者提出预警信号",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":28,"analysis":33},982397,"()是防止资格预审和评标失误的关键环节。",[389,391,393,395],{"key":20,"text":390,"correct":22},"制定科学的评标办法",{"key":24,"text":392,"correct":22},"制定有效的招标策略",{"key":28,"text":394,"correct":26},"合理确定中标人",{"key":31,"text":396,"correct":22},"科学、严密设置合同主要条款",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":24,"analysis":33},982398,"从招标采购服务项目成本构成的特点分析，招标代理机构欲实现项目盈利，应采取的主要措施是()。",[401,403,405,407],{"key":20,"text":402,"correct":22},"合理设定招标控制价",{"key":24,"text":404,"correct":26},"科学安排项目人力资源",{"key":28,"text":406,"correct":22},"严格进行资格预审",{"key":31,"text":408,"correct":22},"认真审核招标文件",{"id":410,"libraryId":5,"type":15,"typeLabel":16,"stem":411,"options":412,"answer":24,"analysis":33},982399,"招标采购管理方案涉及的控制范围的层次不包括()。",[413,415,417,419],{"key":20,"text":414,"correct":22},"针对招标采购活动进行规划",{"key":24,"text":416,"correct":26},"针对项目建设期进行的规划",{"key":28,"text":418,"correct":22},"针对整个项目生命周期进行规划",{"key":31,"text":420,"correct":22},"针对从项目筹备到交付使用期间进行规划",{"id":422,"libraryId":5,"type":15,"typeLabel":16,"stem":423,"options":424,"answer":20,"analysis":33},982400,"招标采购项目管理方案的基本内容不包括()。",[425,427,429,431],{"key":20,"text":426,"correct":26},"招标采购项目沟通管理",{"key":24,"text":428,"correct":22},"招标采购管理保障措施",{"key":28,"text":430,"correct":22},"质量、价格、进度需求目标分解",{"key":31,"text":432,"correct":22},"目标、任务、范围、进度等分解、难点分析及对策",{"id":434,"libraryId":5,"type":15,"typeLabel":16,"stem":435,"options":436,"answer":24,"analysis":33},982401,"下列关于沟通的描述，错误的是()。",[437,439,441,443],{"key":20,"text":438,"correct":22},"沟通分为外部沟通和内部沟通两个方面",{"key":24,"text":440,"correct":26},"沟通的效果取决于信息发送者发送信息的及时性",{"key":28,"text":442,"correct":22},"外部沟通是指组织与环境之间的沟通，是群体间的沟通",{"key":31,"text":444,"correct":22},"内部沟通是指组织内部的信息传递和交换",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":20,"analysis":33},982402,"招标采购中产生的风险主要是()。",[449,451,453,454],{"key":20,"text":450,"correct":26},"人为风险",{"key":24,"text":452,"correct":22},"技术风险",{"key":28,"text":334,"correct":22},{"key":31,"text":338,"correct":22},{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":31,"analysis":33},982403,"工程招标采购中，招标人和中标人应当自()内，按照招标文件和中标人的投标文件订立书面合同。",[459,461,463,465],{"key":20,"text":460,"correct":22},"评标结束后15日",{"key":24,"text":462,"correct":22},"评标结束后30日",{"key":28,"text":464,"correct":22},"中标通知书发出之日起15日",{"key":31,"text":466,"correct":26},"中标通知书发出之日起30日",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":31,"analysis":33},982404,"在开标与评标工作中，项目经理的工作职责是()。",[471,473,475,477],{"key":20,"text":472,"correct":22},"参与决策",{"key":24,"text":474,"correct":22},"决定性决策",{"key":28,"text":476,"correct":22},"必须咨询的",{"key":31,"text":478,"correct":26},"执行工作",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":31,"analysis":33},982405,"风险自留属于()措施。",[483,485,487,489],{"key":20,"text":484,"correct":22},"规避风险",{"key":24,"text":486,"correct":22},"减轻风险",{"key":28,"text":488,"correct":22},"转移风险",{"key":31,"text":490,"correct":26},"接受风险",{"id":492,"libraryId":5,"type":15,"typeLabel":16,"stem":493,"options":494,"answer":24,"analysis":33},982406,"在招标采购项目风险规避的方式中，可以规避投标过程中道德风险造成的行贿、屈从领导意志等情况出现的方式是()。",[495,496,498,499],{"key":20,"text":392,"correct":22},{"key":24,"text":497,"correct":26},"确保按照招标文件制定的评标办法评标",{"key":28,"text":236,"correct":22},{"key":31,"text":500,"correct":22},"合同主要条款科学、严密设置",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":20,"analysis":33},982407,"工程建设项目招标文件的检查表审查内容不包括()。",[505,507,509,511],{"key":20,"text":506,"correct":26},"业主人员名单",{"key":24,"text":508,"correct":22},"合格的投标人",{"key":28,"text":510,"correct":22},"主要合同条款",{"key":31,"text":512,"correct":22},"投标文件的密封和标记",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":31,"analysis":33},982408,"招标采购项目()是沟通管理的基础。",[517,519,521,523],{"key":20,"text":518,"correct":22},"质量管理",{"key":24,"text":520,"correct":22},"技术管理",{"key":28,"text":522,"correct":22},"成本管理",{"key":31,"text":524,"correct":26},"信息管理",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":20,"analysis":33},982409,"风险责任分配的一般原则不包括()。",[529,531,533,535],{"key":20,"text":530,"correct":26},"政策性原则",{"key":24,"text":532,"correct":22},"可预见性原则",{"key":28,"text":534,"correct":22},"可管理性原则",{"key":31,"text":536,"correct":22},"经济性原则",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":31,"analysis":33},982410,"将所分解的工作任务落实到项目有关部门或个人，并明确表示他们在组织中的关系、责任和地位的管理方法和工具是()。",[541,543,545,547],{"key":20,"text":542,"correct":22},"工作分解结构",{"key":24,"text":544,"correct":22},"组织分解结构",{"key":28,"text":546,"correct":22},"合同分解矩阵",{"key":31,"text":548,"correct":26},"责任分配矩阵",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":20,"analysis":33},982411,"项目跟踪的实施者不包括()。",[553,555,557,559],{"key":20,"text":554,"correct":26},"施工企业",{"key":24,"text":556,"correct":22},"咨询企业",{"key":28,"text":558,"correct":22},"有关管理部门的人员",{"key":31,"text":560,"correct":22},"招标活动的实际操作者",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":28,"analysis":33},982412,"在招标采购项目转移的方法中，转移违规行为风险、保证招标人招标活动成功进行的有效方式是()。",[565,566,567,568],{"key":20,"text":234,"correct":22},{"key":24,"text":243,"correct":22},{"key":28,"text":232,"correct":26},{"key":31,"text":246,"correct":22},{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":24,"analysis":33},982413,"检查分析报告重点应分析()对于招标采购过程的影响，评估需要采取改进措施的需求。",[573,575,577,579],{"key":20,"text":574,"correct":22},"检查范围",{"key":24,"text":576,"correct":26},"检查结果",{"key":28,"text":578,"correct":22},"检查内容",{"key":31,"text":580,"correct":22},"检查方法",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":20,"analysis":33},982414,"下列各项属于招标采购进度管理的主要内容是()。",[585,587,589,591],{"key":20,"text":586,"correct":26},"有效做好项目目标和子目标工作的时间顺序安排和搭接关系的衔接",{"key":24,"text":588,"correct":22},"合理安排人力资源，避免间歇式工作，采用招标项目群管理方式",{"key":28,"text":590,"correct":22},"建立市场信息库并充分利用公共信息平台",{"key":31,"text":592,"correct":22},"招标文件系统严谨，逻辑合理，避免投诉",{"id":594,"libraryId":5,"type":15,"typeLabel":16,"stem":595,"options":596,"answer":20,"analysis":33},982415,"招标采购工作之间的先后依赖关系分为工艺关系和组织关系两种。关于确定工作先后关系的说法，正确的是()。",[597,599,601,603],{"key":20,"text":598,"correct":26},"应首先确定工艺关系，然后确定组织关系",{"key":24,"text":600,"correct":22},"应首先确定组织关系，然后确定工艺关系",{"key":28,"text":602,"correct":22},"视资源约束情况确定工作顺序",{"key":31,"text":604,"correct":22},"视工期紧迫程度确定工作顺序",[606,609,612,615,618,621],{"id":15,"name":607,"category":7,"favorite":608},"领导干部任职前廉政法规知识测试题",92,{"id":610,"name":611,"category":7,"favorite":15},595,"建筑结构与设备",{"id":613,"name":614,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":616,"name":617,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":619,"name":620,"category":7,"favorite":8},534,"BIM工程师",{"id":622,"name":620,"category":7,"favorite":8},535]