[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-712-16":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":736},{"id":5,"name":6,"category":7,"favorite":8},712,"招标采购项目管理","建筑工程",0,16,50,927,[13,38,53,68,83,97,112,127,142,156,170,184,199,214,228,242,256,270,284,298,312,326,340,354,369,383,398,412,426,440,455,469,483,497,512,527,541,555,569,583,597,611,626,638,652,666,680,694,708,722],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},983066,2,"多选题","在建设项目经济费用效益分析中，根据费用和效益与项目联系的紧密程度，可分为()。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","转移支付",true,{"key":24,"text":25,"correct":22},"B","直接费用",{"key":27,"text":28,"correct":29},"C","经济费用",false,{"key":31,"text":32,"correct":22},"D","直接效益",{"key":34,"text":35,"correct":22},"E","间接效益","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},983067,"工程建设项目竣工阶段的风险应对措施主要为()。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"实施质量验收监控",{"key":24,"text":45,"correct":29},"将工程价款支付到合同预定的要用户和账户",{"key":27,"text":47,"correct":22},"工程质量风险转移",{"key":31,"text":49,"correct":29},"要求承包商投保工程质量险",{"key":34,"text":51,"correct":29},"有效预测风险前景","AC",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},983068,"关于项目经济费用效益分析，下列说法正确的有()。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"稀缺资源的开发和利用项目需要进行经济费用效益分析",{"key":24,"text":60,"correct":29},"经济费用效益分析的目的是为了节约现有资源，进行合理配置",{"key":27,"text":62,"correct":22},"经济费用效益分析需要站在国家整体的层面进行分析",{"key":31,"text":64,"correct":22},"编制经济费用效益分析报表是经济费用效益分析的程序之一",{"key":34,"text":66,"correct":22},"经济费用效益分析的基本原则是资源合理配置原则","ACDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},983069,"空负载试车的一般步骤包括()。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"办理各项竣工交接手续",{"key":24,"text":75,"correct":22},"审查各项准备工作是否已满足试车的需要",{"key":27,"text":77,"correct":22},"完成启动前的检查、检验、检测，证明可安全运转",{"key":31,"text":79,"correct":22},"单机空负荷试运转，确认合格后，即可签单机试运转合格证书",{"key":34,"text":81,"correct":22},"空负荷联动试车","BCDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":36,"analysis":37},983070,"工业项目的项目建议书一般包括()。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"初步结论和建议",{"key":24,"text":90,"correct":22},"能源、交通及其他建设条件的初步分析",{"key":27,"text":92,"correct":29},"项目的可行性分析",{"key":31,"text":94,"correct":22},"项目建设的必要性和依据",{"key":34,"text":96,"correct":22},"经济和社会效果的初步估计",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},983071,"关于安装工程材料，下列说法正确的有()。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"高分子材料根据机械性能和使用状态，分为塑料、橡胶和合成纤维三大类",{"key":24,"text":104,"correct":22},"金属材料分为黑色金属材料和有色金属材料两大类",{"key":27,"text":106,"correct":22},"工程中常用有色金属铝及铝合金、铜及铜合金",{"key":31,"text":108,"correct":22},"一般分为金属材料、非金属材料和复合材料三大类",{"key":34,"text":110,"correct":29},"非金属材料是指无机非金属材料","ABCD",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},983072,"检验批、分部分项工程完成后，其验收单位包括()。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"工程监理单位",{"key":24,"text":119,"correct":22},"建设单位",{"key":27,"text":121,"correct":22},"设计单位",{"key":31,"text":123,"correct":29},"政府部门",{"key":34,"text":125,"correct":29},"勘察单位","ABC",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},983073,"关于直接费用，下列说法正确的有()。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"直接费用包括项目投入的各种物料、人工、资金、技术以及自然资源而带来的社会资源的消耗",{"key":24,"text":134,"correct":22},"减少其他项目（或最终消费）投入物的供应而放弃的效益属于直接费用的计算范围",{"key":27,"text":136,"correct":22},"直接费用是指项目使用投入物所产生的经济费用",{"key":31,"text":138,"correct":29},"增加出口（或减少进口）所耗用（或减收）的外汇不属于直接费用的计算范围",{"key":34,"text":140,"correct":22},"项目的直接效益和直接费用统称为项目内部效果","ABCE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":36,"analysis":37},983074,"在工程建设项目竣工验收阶段，对于承包人来说，其风险主要体现在()等方面。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"工程质量",{"key":24,"text":149,"correct":22},"债权债务处理",{"key":27,"text":151,"correct":29},"合同管理",{"key":31,"text":153,"correct":22},"利益相关方关系的协调",{"key":34,"text":155,"correct":22},"竣工验收资料管理",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":141,"analysis":37},983075,"下列各项中，承包人可提出工程索赔的有()。",[160,162,164,166,168],{"key":20,"text":161,"correct":22},"发包人指令承包人缩短工期导致的额外开支",{"key":24,"text":163,"correct":22},"发包人要求修改设计造成工期延长",{"key":27,"text":165,"correct":22},"不可预见的地下障碍物导致工程返工",{"key":31,"text":167,"correct":29},"合同非正常终止",{"key":34,"text":169,"correct":22},"施工期间，工程材料物价上涨",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":141,"analysis":37},983076,"关于通风空调工程，下列说法正确的有()。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"空调系统的组成包括送风系统和回风系统",{"key":24,"text":177,"correct":22},"通风系统按照作用功能，分为除尘、净化、事故通风、消防通风（防排烟通风）、人防通风等",{"key":27,"text":179,"correct":22},"通风方式按照促使气流流动的动力不同，分为自然通风和机械通风",{"key":31,"text":181,"correct":29},"空调系统安装包括除尘器和消声器的安装",{"key":34,"text":183,"correct":22},"通风系统分为送风系统和排风系统",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},983077,"施工过程的管理活动包括()等阶段。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"施工准备",{"key":24,"text":191,"correct":22},"施工",{"key":27,"text":193,"correct":29},"验收策划",{"key":31,"text":195,"correct":22},"竣工验收",{"key":34,"text":197,"correct":29},"工程移交","ABD",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},983078,"工程建设项目设计概算的编制形式包括()。",[203,205,207,209,211],{"key":20,"text":204,"correct":29},"分部分项工程概算",{"key":24,"text":206,"correct":29},"专业工程概算",{"key":27,"text":208,"correct":22},"单位工程概算",{"key":31,"text":210,"correct":22},"单项工程综合概算",{"key":34,"text":212,"correct":22},"工程建设项目总概算","CDE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":111,"analysis":37},983079,"项目保修阶段的管理工作内容包括()。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"与施工单位签订工程保修合同",{"key":24,"text":221,"correct":22},"制订工程保修阶段工作计划",{"key":27,"text":223,"correct":22},"定期检查项目使用和运行情况",{"key":31,"text":225,"correct":22},"审核质量缺陷修复方案，监督修复过程并进行验收",{"key":34,"text":227,"correct":29},"向政府主管部门办理其他各项审批事项",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":111,"analysis":37},983080,"关于利用近因原则判定责任，下列说法正确的有()。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"单一原因造成的损失，只需判断这一原因是否属于保险责任范围",{"key":24,"text":235,"correct":22},"多种原因同时发生造成的损失，如果多种风险因素对事故损失都起着重要影响，那么应该逐一研究风险因素是否属于保险责任",{"key":27,"text":237,"correct":22},"多种原因连续发生造成的损失，如果前后风险原因存在必然的因果关系，且前后原因之间的因果链未中断，那么根据牵引是否属于保险责任范围来判断最终是否赔偿",{"key":31,"text":239,"correct":22},"多种原因间断发生，当多种原因间断发生时，依据新出现而且独立的风险原因是否在保险责任范围内来判断",{"key":34,"text":241,"correct":29},"多种原因连续发生造成的损失，如果各种风险因素导致的损失能够区分开，则保险公司负责赔偿属于保险责任内的风险因素导致的损失。",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":111,"analysis":37},983081,"施工过程的管理原则包括()。",[246,248,250,252,254],{"key":20,"text":247,"correct":22},"实现全过程全方位的过程管理",{"key":24,"text":249,"correct":22},"确保项目监理的管理控制协调作用",{"key":27,"text":251,"correct":22},"建立有效的施工管理责任制",{"key":31,"text":253,"correct":22},"构建基于PDCA循环的集成化过程管理模式",{"key":34,"text":255,"correct":29},"确保监理规范和细则与施工单位一致",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":36,"analysis":37},983082,"工程建设项目职业健康安全与环境管理的特点有()。",[260,262,264,266,268],{"key":20,"text":261,"correct":22},"复杂性",{"key":24,"text":263,"correct":22},"多样性",{"key":27,"text":265,"correct":29},"独立性",{"key":31,"text":267,"correct":22},"不符合性",{"key":34,"text":269,"correct":22},"持续性",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":111,"analysis":37},983083,"工程建设项目施工质量计划的内容包括()。",[274,276,278,280,282],{"key":20,"text":275,"correct":22},"工程特点及施工条件分析",{"key":24,"text":277,"correct":22},"质量管理组织机构、人员及资源配置计划",{"key":27,"text":279,"correct":22},"为确保工程质量所采取的施工技术措施、程序和方法",{"key":31,"text":281,"correct":22},"材料设备采购和使用的控制措施",{"key":34,"text":283,"correct":29},"工程质量事故报告",{"id":285,"libraryId":5,"type":15,"typeLabel":16,"stem":286,"options":287,"answer":198,"analysis":37},983084,"设计施工一体化承包高的项目进度管理的特点包括()。",[288,290,292,294,296],{"key":20,"text":289,"correct":22},"设计施工一体化单位集成了设计与施工两个角色内部的进度管理任务",{"key":24,"text":291,"correct":22},"设计施工一体化单位介入项目的时间很早、过程很长",{"key":27,"text":293,"correct":29},"施工供货与设计工作成因果关系",{"key":31,"text":295,"correct":22},"如属专业工程的设计施工一体化承包方，其外部的进度管理与协调性强",{"key":34,"text":297,"correct":29},"如属项目总承包层面的设计施工一体化承包方，对下属设计、采购供货、施工单位进行的协调，与其外部单位的协调工作量相对较大",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":111,"analysis":37},983085,"在勘察与设计过程中，业主的利益诉求包括()。",[302,304,306,308,310],{"key":20,"text":303,"correct":22},"设计单位对设计意图的领悟能力高",{"key":24,"text":305,"correct":22},"设计单位的配合意愿强",{"key":27,"text":307,"correct":22},"设计单位的图纸质量可靠",{"key":31,"text":309,"correct":22},"设计单位对设计分包的管理控制严格",{"key":34,"text":311,"correct":29},"设计单位对施工工法理解深刻",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":67,"analysis":37},983086,"施工图设计文件的审查中，内部审查包括()。",[316,318,320,322,324],{"key":20,"text":317,"correct":22},"控制施工图与初步设计的正常衔接",{"key":24,"text":319,"correct":29},"设计规模是否达到规定的标准",{"key":27,"text":321,"correct":22},"施工图是否能够满足工程设计任务书及类似配套文件（如设计与施工技术标准）的要求",{"key":31,"text":323,"correct":22},"各专业图纸本身是否存在设计错误，分专业施工图之间是否存在冲突",{"key":34,"text":325,"correct":22},"是否按业主提出的“招标图纸”要求，按工程分解结构（合同网络图）分别出图",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":213,"analysis":37},983087,"管理咨询单位的项目诉求与管理目标包括()。",[330,332,334,336,338],{"key":20,"text":331,"correct":29},"准确详尽的设计任务书",{"key":24,"text":333,"correct":29},"明确及时的指令",{"key":27,"text":335,"correct":22},"报酬合理",{"key":31,"text":337,"correct":22},"获取信息及时准确",{"key":34,"text":339,"correct":22},"决策迅速",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":67,"analysis":37},983088,"工程保险的基本原则有()。",[344,346,348,350,352],{"key":20,"text":345,"correct":22},"保险利益原则",{"key":24,"text":347,"correct":29},"相互信任原则",{"key":27,"text":349,"correct":22},"损害补偿原则",{"key":31,"text":351,"correct":22},"近因原则",{"key":34,"text":353,"correct":22},"最大诚信原则",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":368,"analysis":37},983089,"项目建设技术方案选择的可行性研究包括()。",[358,360,362,364,366],{"key":20,"text":359,"correct":22},"技术先进性和适用性",{"key":24,"text":361,"correct":29},"基础设施的适用性",{"key":27,"text":363,"correct":22},"建设可能性和可行性",{"key":31,"text":365,"correct":29},"持续发展的可能性",{"key":34,"text":367,"correct":22},"经济合理性和有效性","ACE",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":141,"analysis":37},983090,"如果某工程由专业项目管理单位进行管理承包，则()。",[373,375,377,379,381],{"key":20,"text":374,"correct":22},"如果专业项目管理单位不能实现管理目标，该管理咨询单位承担以管理承包额为基数的经济处罚。",{"key":24,"text":376,"correct":22},"如果项目总投资或工程总造价目标超支，则超出部分一般由管理承包的咨询单位承担",{"key":27,"text":378,"correct":22},"如果项目总投资或工程总造价有节余，该管理咨询单位可以分享",{"key":31,"text":380,"correct":29},"双方各自的管理责任也很难划分清楚",{"key":34,"text":382,"correct":22},"在管理承包的方式下，项目的合同体系将调整为以管理承包方为中心的体系",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":397,"analysis":37},983091,"按产生风险的原因及其性质分类，工程风险包括()。",[387,389,391,393,395],{"key":20,"text":388,"correct":22},"信用风险",{"key":24,"text":390,"correct":29},"合同风险",{"key":27,"text":392,"correct":22},"自然风险",{"key":31,"text":394,"correct":22},"行为风险",{"key":34,"text":396,"correct":29},"管理风险","ACD",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":67,"analysis":37},983092,"关于项目进度计划，下列说法正确的有()。",[402,404,406,408,410],{"key":20,"text":403,"correct":22},"项目业主与管理咨询单位的周计划与月计划是对应的，包括内容与时限都是对应的，周计划是月计划的细化，是服从和服务于月计划的",{"key":24,"text":405,"correct":29},"专项管理工作进度计划是跨越周度的计划",{"key":27,"text":407,"correct":22},"在项目施工期，业主与管理咨询单位的月计划、周计划与项目进度总控计划（一级计划）对应",{"key":31,"text":409,"correct":22},"一个完善的进度计划管理体系能使体系内的各个计划在总体与重要的时间节点上完全相互呼应，不但包括两个计划体系之间的呼应，也包括各级计划之间的呼应",{"key":34,"text":411,"correct":22},"三级计划一般由总承包方的专业计划工程师运用必要管理软件按短周期滚动编制",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":141,"analysis":37},983093,"承包人根据办理的竣工结算文件，向发包人提交竣工结算款的支付申请，该申请应包括()。",[416,418,420,422,424],{"key":20,"text":417,"correct":22},"竣工结算合同价款总额",{"key":24,"text":419,"correct":22},"累计已实际支付的合同价款",{"key":27,"text":421,"correct":22},"应扣留的质量保证金",{"key":31,"text":423,"correct":29},"质量保证金",{"key":34,"text":425,"correct":22},"实际应支付的竣工结算额金额",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":52,"analysis":37},983094,"工程建设项目按其立项的基本性质可划分为新建项目、()等六类。",[430,432,434,436,438],{"key":20,"text":431,"correct":22},"改建项目",{"key":24,"text":433,"correct":29},"分项工程",{"key":27,"text":435,"correct":22},"迁建项目",{"key":31,"text":437,"correct":29},"单位工程",{"key":34,"text":439,"correct":29},"建设项目",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":454,"analysis":37},983095,"在工程建设项目的工程设计与计划阶段，业主的工作内容有()。",[444,446,448,450,452],{"key":20,"text":445,"correct":29},"组织方案设计评审",{"key":24,"text":447,"correct":22},"审查初步设计概算",{"key":27,"text":449,"correct":29},"拟定施工合同条款",{"key":31,"text":451,"correct":22},"签署施工监理委托合同",{"key":34,"text":453,"correct":29},"编制施工组织设计","BD",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":141,"analysis":37},983096,"下列关于施工环境管理要求的表述，正确的有()。",[459,461,463,465,467],{"key":20,"text":460,"correct":22},"收集和落实施工项目相关的法律法规要求，及时进行合规性评价",{"key":24,"text":462,"correct":22},"应明确施工项目运行的控制对象",{"key":27,"text":464,"correct":22},"环境绩效监测（检查）和改进",{"key":31,"text":466,"correct":29},"不影响周边道路的交通秩序",{"key":34,"text":468,"correct":22},"从制度上规定施工现场实施适宜的运行程序和方法",{"id":470,"libraryId":5,"type":15,"typeLabel":16,"stem":471,"options":472,"answer":141,"analysis":37},983097,"投资决策的一般决策程序包括()。",[473,475,477,479,481],{"key":20,"text":474,"correct":22},"选择最佳方案",{"key":24,"text":476,"correct":22},"分析评估",{"key":27,"text":478,"correct":22},"搜集材料，拟订方案",{"key":31,"text":480,"correct":29},"确定实施计划，提出合理化建议",{"key":34,"text":482,"correct":22},"试验实证",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":368,"analysis":37},983098,"关于环境影响评价与工程建设程序的对应关系，下列说法正确的有()。",[487,489,491,493,495],{"key":20,"text":488,"correct":22},"运行一进行项目周边环境监测",{"key":24,"text":490,"correct":29},"施工一监督设计，落实评价结论",{"key":27,"text":492,"correct":22},"项目建议书批准一编制环境影响评价大纲",{"key":31,"text":494,"correct":29},"编制工程项目的可行性研究一编制环境影响评价大纲",{"key":34,"text":496,"correct":22},"工程设计一监督设计，落实评价结论",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":511,"analysis":37},983099,"在编制进度总控制计划时，主要遵循()步骤进行。",[501,503,505,507,509],{"key":20,"text":502,"correct":22},"由业主或管理咨询单位编制项目进度总控制计划的初始版本",{"key":24,"text":504,"correct":29},"由设计单位编制项目进度总控制计划的初始版本",{"key":27,"text":506,"correct":29},"由施工单位编制项目进度总控制计划的初始版本",{"key":31,"text":508,"correct":22},"项目进度总控制计划的正式版本",{"key":34,"text":510,"correct":22},"项目进度总控制计划的调改版本","ADE",{"id":513,"libraryId":5,"type":15,"typeLabel":16,"stem":514,"options":515,"answer":526,"analysis":37},983100,"工程建设项目施工阶段的施工技术风险因素主要包括()。",[516,518,520,522,524],{"key":20,"text":517,"correct":29},"缺陷设计，错误和遗漏",{"key":24,"text":519,"correct":22},"应用新技术新方案的失败",{"key":27,"text":521,"correct":29},"规范不恰当，未考虑地质条件",{"key":31,"text":523,"correct":22},"不合理的施工技术和方案",{"key":34,"text":525,"correct":22},"考虑现场情况不周","BDE",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":67,"analysis":37},983101,"喷水灭火系统分为()。",[531,533,535,537,539],{"key":20,"text":532,"correct":22},"重复启闭预作用灭火系统",{"key":24,"text":534,"correct":29},"给水系统",{"key":27,"text":536,"correct":22},"湿式系统",{"key":31,"text":538,"correct":22},"预作用系统",{"key":34,"text":540,"correct":22},"干式系统",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":397,"analysis":37},983102,"业主面临的财务风险主要来自()。",[545,547,549,551,553],{"key":20,"text":546,"correct":22},"国家政策变化",{"key":24,"text":548,"correct":29},"客观环境",{"key":27,"text":550,"correct":22},"自身原因",{"key":31,"text":552,"correct":22},"承包商",{"key":34,"text":554,"correct":29},"自然因素",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":397,"analysis":37},983103,"关于不同资金来源的项目，下列说法正确的有()。",[559,561,563,565,567],{"key":20,"text":560,"correct":22},"联合投资项目中，企业通过项目建成后的产权移交或特许经营权下的项目运营来收回投资",{"key":24,"text":562,"correct":29},"政府投资项目多投资于长期占用的厂房等建筑物和大型的机械设备",{"key":27,"text":564,"correct":22},"非政府投资项目是指未使用政府的财政性资金，而由其他社会资金投资的建设项目",{"key":31,"text":566,"correct":22},"政府投资项目又具体分为经营性与非经营性项目两类",{"key":34,"text":568,"correct":29},"联合投资项目的特点是投资额大、风险大并且需要较多的相关业务经验与知识，但其投资收益也较高",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":82,"analysis":37},983104,"关于业主与项目咨询管理单位的角色定位，下列说法正确的有()。",[573,575,577,579,581],{"key":20,"text":574,"correct":29},"项目管理咨询单位具有从项目全局与整体看待进度管理的视野，是项目全过程进度管理的主导者",{"key":24,"text":576,"correct":22},"业主与管理咨询单位拥有搭建项目管理架构的权力",{"key":27,"text":578,"correct":22},"业主及其聘用的项目管理咨询单位，尤其是后者往往具备较高的进度计划管理与组织能力",{"key":31,"text":580,"correct":22},"项目前期是整个开发建设周期的重要组成部分，往往占据了一半或更多的时间，而此时项目的进度管理主要是由业主承担的",{"key":34,"text":582,"correct":22},"业主是项目唯一的全过程的参与者",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":397,"analysis":37},983105,"涵洞按构造形式不同，分为()。",[587,589,591,593,595],{"key":20,"text":588,"correct":22},"盖板涵",{"key":24,"text":590,"correct":29},"明涵",{"key":27,"text":592,"correct":22},"拱涵",{"key":31,"text":594,"correct":22},"箱涵",{"key":34,"text":596,"correct":29},"石涵",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":36,"analysis":37},983106,"关于线性顺序法和快速路径法，下列描述正确的有()。",[601,603,605,607,609],{"key":20,"text":602,"correct":22},"要改变一个普遍存在的模糊看法，即快速路径法是先进的，而线性顺序法是落后的",{"key":24,"text":604,"correct":22},"快速路径法是建立在线性顺序法基础之上的，可以被看做一个一个子项目按线性顺序法实施的组合",{"key":27,"text":606,"correct":29},"同一个项目中往往采用快速路径法来实施",{"key":31,"text":608,"correct":22},"在同一个项目中，既可以对其中部分子项目或子项目组合采用线性顺序法实施，又可以对另一部分子项目进行第二级的分割，按照快速路径法实施。",{"key":34,"text":610,"correct":22},"二者分别适用于不同技术复杂程度与管理要求的项目",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":625,"analysis":37},983107,"工程建设项目风险管理中广泛使用的风险转移方式有()。",[615,617,619,621,623],{"key":20,"text":616,"correct":22},"工程担保",{"key":24,"text":618,"correct":22},"工程保险",{"key":27,"text":620,"correct":29},"建立风险事件应急预案",{"key":31,"text":622,"correct":29},"制定风险管理制度",{"key":34,"text":624,"correct":22},"设定保护性合同条款","ABE",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":625,"analysis":37},983108,"工程施工质量的监控主体有()。",[630,631,632,634,636],{"key":20,"text":119,"correct":22},{"key":24,"text":121,"correct":22},{"key":27,"text":633,"correct":29},"供应单位",{"key":31,"text":635,"correct":29},"施工单位",{"key":34,"text":637,"correct":22},"政府",{"id":639,"libraryId":5,"type":15,"typeLabel":16,"stem":640,"options":641,"answer":141,"analysis":37},983109,"融资服务项目招标阶段的工作范围包括()。",[642,644,646,648,650],{"key":20,"text":643,"correct":22},"资格预审",{"key":24,"text":645,"correct":22},"招标投标",{"key":27,"text":647,"correct":22},"谈判定标",{"key":31,"text":649,"correct":29},"合同定标",{"key":34,"text":651,"correct":22},"协议签署",{"id":653,"libraryId":5,"type":15,"typeLabel":16,"stem":654,"options":655,"answer":36,"analysis":37},983110,"当事人对科技咨询服务项目中新技术成果的归属问题进行约定时，应遵循()的原则。",[656,658,660,662,664],{"key":20,"text":657,"correct":22},"权利对等",{"key":24,"text":659,"correct":22},"费用互惠",{"key":27,"text":661,"correct":29},"风险承担对等",{"key":31,"text":663,"correct":22},"使用权利对等",{"key":34,"text":665,"correct":22},"交换期限对等",{"id":667,"libraryId":5,"type":15,"typeLabel":16,"stem":668,"options":669,"answer":82,"analysis":37},983111,"物流服务项目范围管理的主要内容包括()。",[670,672,674,676,678],{"key":20,"text":671,"correct":29},"物流服务项目范围设计",{"key":24,"text":673,"correct":22},"物流服务项目范围界定",{"key":27,"text":675,"correct":22},"物流服务项目范围确认",{"key":31,"text":677,"correct":22},"物流服务项目范围计划",{"key":34,"text":679,"correct":22},"物流服务项目范围变更",{"id":681,"libraryId":5,"type":15,"typeLabel":16,"stem":682,"options":683,"answer":526,"analysis":37},983112,"咨询服务项目管理中，()管理是关键内容。",[684,686,688,690,692],{"key":20,"text":685,"correct":29},"投资",{"key":24,"text":687,"correct":22},"范围",{"key":27,"text":689,"correct":29},"成本",{"key":31,"text":691,"correct":22},"质量",{"key":34,"text":693,"correct":22},"进度",{"id":695,"libraryId":5,"type":15,"typeLabel":16,"stem":696,"options":697,"answer":36,"analysis":37},983113,"物流服务项目范围变更控制的结果有()。",[698,700,702,704,706],{"key":20,"text":699,"correct":22},"生成变更的行动方案",{"key":24,"text":701,"correct":22},"改善物流服务工作绩效和结果",{"key":27,"text":703,"correct":29},"变更物流服务项目范围计划",{"key":31,"text":705,"correct":22},"生成物流服务范围变更的正式记录",{"key":34,"text":707,"correct":22},"生成物流服务项目的范围、工期、成本、质量更新的计划文件",{"id":709,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":711,"answer":126,"analysis":37},983114,"总价合同适用于有明确的()的简单服务项目。",[712,714,716,718,720],{"key":20,"text":713,"correct":22},"服务内容",{"key":24,"text":715,"correct":22},"服务期限",{"key":27,"text":717,"correct":22},"服务成果",{"key":31,"text":719,"correct":29},"支付方式",{"key":34,"text":721,"correct":29},"酬金提成",{"id":723,"libraryId":5,"type":15,"typeLabel":16,"stem":724,"options":725,"answer":67,"analysis":37},983115,"产品质量鉴定工作的原则有()。",[726,728,730,732,734],{"key":20,"text":727,"correct":22},"公正",{"key":24,"text":729,"correct":29},"公开",{"key":27,"text":731,"correct":22},"公平",{"key":31,"text":733,"correct":22},"科学",{"key":34,"text":735,"correct":22},"求实",[737,741,744,747,750,753],{"id":738,"name":739,"category":7,"favorite":740},1,"领导干部任职前廉政法规知识测试题",92,{"id":742,"name":743,"category":7,"favorite":738},595,"建筑结构与设备",{"id":745,"name":746,"category":7,"favorite":738},715,"招标采购专业知识与法律法规",{"id":748,"name":749,"category":7,"favorite":738},848,"市政方向-通用基础",{"id":751,"name":752,"category":7,"favorite":8},534,"BIM工程师",{"id":754,"name":752,"category":7,"favorite":8},535]