[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-712-15":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":739},{"id":5,"name":6,"category":7,"favorite":8},712,"招标采购项目管理","建筑工程",0,15,50,927,[13,38,53,67,82,97,112,126,141,155,170,185,199,213,228,242,257,271,286,300,314,329,343,358,373,387,400,415,429,443,457,471,485,499,513,527,541,555,569,583,597,612,626,640,654,668,683,697,711,725],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},983016,2,"多选题","下列对于措施项目费的调整的说法正确的有()。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","承包人提出调整措施项目费的，应事先将拟实施的方案提交发包人确认",true,{"key":24,"text":25,"correct":22},"B","安全文明施工费，按照实际发生变化的措施项目调整",{"key":27,"text":28,"correct":29},"C","按总价（或系数）计算的措施项目费，实际发生变化的措施项目调整，并按相关述分部分项工程费的调整方法确定单价",false,{"key":31,"text":32,"correct":22},"D","采用单价计算的措施项目费，按照实际发生变化的措施项目调整。",{"key":34,"text":35,"correct":22},"E","按总价（或系数）计算的措施项目费，除安全文明施工费外，按照实际发生变化的措施项目调整","ABDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},983017,"业主在签订项目设计合同前，需要()。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"决定拟采用的项目管理模式",{"key":24,"text":45,"correct":22},"确定分专业工程的管理模式",{"key":27,"text":47,"correct":22},"确定各专业工程设计图的出图深度",{"key":31,"text":49,"correct":22},"确定相关专业工程招标所需达到的设计深度要求",{"key":34,"text":51,"correct":29},"确保提供的图纸没有或极少有错误","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":52,"analysis":37},983018,"施工过程管理的特征包括()。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"施工过程的重大管理决策者是业主",{"key":24,"text":60,"correct":22},"施工过程的具体管理者是施工单位",{"key":27,"text":62,"correct":22},"施工管理要求强化组织协调工作",{"key":31,"text":64,"correct":22},"依施工阶段的不同，施工管理的内容分为施工准备、基础施工、结构施工、装修施工、安装施工、验收交工的管理",{"key":34,"text":66,"correct":29},"设计单位可对施工过程进行干预",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":81,"analysis":37},983019,"造成工程质量事故的原因中，属于项目决策失误的有()。",[71,73,75,77,79],{"key":20,"text":72,"correct":29},"不按工程建设强制性标准进行勘察",{"key":24,"text":74,"correct":22},"可行性研究报告的调查研究深度不够",{"key":27,"text":76,"correct":22},"决策程序不当，主观决策",{"key":31,"text":78,"correct":29},"监理检查不严格",{"key":34,"text":80,"correct":29},"竣工验收不合格","BC",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},983020,"根据适用工程性质的不同，目前国内和国际保险市场最常用的建筑安装工程保险主要有()。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"建筑工程一切险",{"key":24,"text":89,"correct":22},"施工机具保险",{"key":27,"text":91,"correct":22},"相关人员保险",{"key":31,"text":93,"correct":29},"侵权责任保险",{"key":34,"text":95,"correct":22},"安装工程一切险","ABCE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},983021,"在设计概算的编制过程中，建筑工程概算的编制方法有()。",[101,103,105,107,109],{"key":20,"text":102,"correct":29},"预算单价法",{"key":24,"text":104,"correct":29},"设备价值百分比法",{"key":27,"text":106,"correct":22},"概算定额法",{"key":31,"text":108,"correct":22},"概算指标法",{"key":34,"text":110,"correct":22},"类似工程预算法","CDE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":52,"analysis":37},983022,"现代工程建设项目内部不可或缺的四个参与方是指()。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"业主",{"key":24,"text":119,"correct":22},"设计单位",{"key":27,"text":121,"correct":22},"施工单位",{"key":31,"text":123,"correct":22},"管理咨询单位",{"key":34,"text":125,"correct":29},"项目管理委员会",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":140,"analysis":37},983023,"下列保修期限中，符合《建设工程质量管理条例的》的有()。",[130,132,134,136,138],{"key":20,"text":131,"correct":22},"有防水要求的卫生间、房间和外墙面的防渗漏为五年",{"key":24,"text":133,"correct":29},"屋面防水工程的防渗漏期限为三年",{"key":27,"text":135,"correct":29},"业主与施工单位应就工程整体在保修书中约定具体的保修年限",{"key":31,"text":137,"correct":22},"供热与供冷系统为两个采暖期、供冷期",{"key":34,"text":139,"correct":22},"电气管线、给排水管道、设备安装和装修工程为两年","ADE",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":36,"analysis":37},983024,"下列关于勘察与设计的说法，正确的有()。",[145,147,149,151,153],{"key":20,"text":146,"correct":22},"建设工程的勘察与设计是两类性质相近但又不同的活动",{"key":24,"text":148,"correct":22},"从事建设工程勘察、设计活动，应当坚持先勘察、后设计、再施工的原则",{"key":27,"text":150,"correct":29},"勘察与设计是两个独立技术活动阶段",{"key":31,"text":152,"correct":22},"细分的勘察与细分的设计往往互为因果",{"key":34,"text":154,"correct":22},"可以混合穿插于同一个项目技术活动阶段",{"id":156,"libraryId":5,"type":15,"typeLabel":16,"stem":157,"options":158,"answer":169,"analysis":37},983025,"按工程建设项目参与者风险承担责任划分，工程风险可分为()。",[159,161,163,165,167],{"key":20,"text":160,"correct":22},"业主风险",{"key":24,"text":162,"correct":29},"代理风险",{"key":27,"text":164,"correct":22},"承包商风险",{"key":31,"text":166,"correct":29},"建设者风险",{"key":34,"text":168,"correct":22},"专业咨询人员风险","ACE",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":184,"analysis":37},983026,"下列财务评价指标中，反映工程建设项目偿债能力的指标有()。",[174,176,178,180,182],{"key":20,"text":175,"correct":22},"资产负债率",{"key":24,"text":177,"correct":29},"累计盈余资金",{"key":27,"text":179,"correct":22},"利息备付率",{"key":31,"text":181,"correct":29},"投资收益率",{"key":34,"text":183,"correct":29},"投资回收期","AC",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":52,"analysis":37},983027,"总价合同风险应对措施的实施要点包括()。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"采用合同手段",{"key":24,"text":192,"correct":22},"预先设立涨价预备金，应对涨价风险",{"key":27,"text":194,"correct":22},"当变更发生，双方可协商，对价格做适当调整，根据合同的工程量清单或暂定费对变更进行估价",{"key":31,"text":196,"correct":22},"要求承包商提供履约担保或者投保信用保险",{"key":34,"text":198,"correct":29},"规定工程量极限变动幅度，当工程量变幅超过极限幅度时，才允许适当调整单价来降低风险",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":52,"analysis":37},983028,"关于工程建设项目直接参与方，下列说法正确的有()。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"设计工作，包括其中的工程设计工作在国际上普遍被视为是一种咨询服务",{"key":24,"text":206,"correct":22},"业主是工程建设项目的投资人或投资人专门为项目设立的独立法人",{"key":27,"text":208,"correct":22},"管理咨询单位在建设规模大，技术构成复杂的工程建设项目中，承担着本来由业主实施的大量管理工作",{"key":31,"text":210,"correct":22},"狭义的施工单位是指承担项目产品建造责任的施工承包单位",{"key":34,"text":212,"correct":29},"业主只能与单一施工单位就项目的全部施工任务与责任签订施工总承包合同",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},983029,"关于盈亏平衡分析，下列说法错误的有()。",[217,219,221,223,225],{"key":20,"text":218,"correct":29},"根据其函数形式不同，盈亏平衡分析又分为线性盈亏平衡分析及非线性盈亏平衡分析",{"key":24,"text":220,"correct":29},"线性盈亏平衡分析是指项目的收入和成本都与产量之间呈线性关系",{"key":27,"text":222,"correct":22},"盈亏平衡生产能力利用率表示项目可以接受的最低产量",{"key":31,"text":224,"correct":22},"盈亏平衡分析能够揭示产生项目风险的原因",{"key":34,"text":226,"correct":29},"盈亏平衡分析的核心是确定盈亏平衡点","CD",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":96,"analysis":37},983030,"项目敏感性分析中的影响因素包括()。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"经济成本",{"key":24,"text":235,"correct":22},"产销量",{"key":27,"text":237,"correct":22},"产品价格",{"key":31,"text":239,"correct":29},"库存数量",{"key":34,"text":241,"correct":22},"项目投资",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":256,"analysis":37},983031,"下列情况中，可以采用业主自设管理机构实施管理方式的有()。",[246,248,250,252,254],{"key":20,"text":247,"correct":22},"业主常年进行工程建设项目投资，拥有稳定的专业化的工程项目管理机构，具有所投资项目的管理经验与能力",{"key":24,"text":249,"correct":22},"项目投资较小、管理难度小",{"key":27,"text":251,"correct":29},"业主设有较小的管理机构，投资项目较大、周期很长",{"key":31,"text":253,"correct":29},"业主具有项目管理能力，管理经验较少",{"key":34,"text":255,"correct":22},"保密等特殊情况","ABE",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":36,"analysis":37},983032,"质量、境与职业健康安全管理体系认证和保持的步骤包括()。",[261,263,265,267,269],{"key":20,"text":262,"correct":22},"企业向认证机构提交申请书",{"key":24,"text":264,"correct":22},"签订认证合同",{"key":27,"text":266,"correct":29},"制定审核措施和方案",{"key":31,"text":268,"correct":22},"现场认证审核",{"key":34,"text":270,"correct":22},"指定审核小组，开展文件预审",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":285,"analysis":37},983033,"社会评价的内容包括()。",[275,277,279,281,283],{"key":20,"text":276,"correct":29},"推广性分析",{"key":24,"text":278,"correct":22},"社会风险分析",{"key":27,"text":280,"correct":22},"社会影响分析",{"key":31,"text":282,"correct":29},"可操作性分析",{"key":34,"text":284,"correct":22},"互适性分析","BCE",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":96,"analysis":37},983034,"企业投资项目的备案程序包括()。",[290,292,294,296,298],{"key":20,"text":291,"correct":22},"可行性研究",{"key":24,"text":293,"correct":22},"申报备案，申请相关材料",{"key":27,"text":295,"correct":22},"政府合规性审查",{"key":31,"text":297,"correct":29},"行业或部门规划",{"key":34,"text":299,"correct":22},"项目备案确认书",{"id":301,"libraryId":5,"type":15,"typeLabel":16,"stem":302,"options":303,"answer":169,"analysis":37},983035,"编制项目进度计划的步骤有()。",[304,306,308,310,312],{"key":20,"text":305,"correct":22},"利用工作（工程）分解结构确定管理任务和子项任务",{"key":24,"text":307,"correct":29},"完成管理任务与子任务",{"key":27,"text":309,"correct":22},"检查工作之间的逻辑关系",{"key":31,"text":311,"correct":29},"确定工期",{"key":34,"text":313,"correct":22},"完善并优化进度计划",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":328,"analysis":37},983036,"下列关于设计单位进度管理的说法正确的有()。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"设计单位最初是在项目的策划决策阶段以设计或技术的咨询方式介入项目的",{"key":24,"text":321,"correct":29},"在项目的策划决策阶段，设计单位与其他参与方协调众多",{"key":27,"text":323,"correct":22},"进入工程设计与计划阶段后，设计单位首先是要完成自己承担的设计任务",{"key":31,"text":325,"correct":22},"进入工程设计与计划阶段后，进度管理主要体现在确定项目内部设计团队的组成与分工，确定具体设计过程",{"key":34,"text":327,"correct":22},"在施工阶段，设计单位的工作主要是协调专业设计单位的二次设计，或是配合业主所做的设计施工一体化工程的招标与实施，并参与设计变更的管理与配合工作","ACDE",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":52,"analysis":37},983037,"工程计价工作的特征包括()。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"计价的单件性",{"key":24,"text":336,"correct":22},"计价方法的多样性",{"key":27,"text":338,"correct":22},"计价依据的复杂性",{"key":31,"text":340,"correct":22},"计价的组合性",{"key":34,"text":342,"correct":29},"计价数据的客观性",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":357,"analysis":37},983038,"生产运营准备期间，其管理工作包括()等。",[347,349,351,353,355],{"key":20,"text":348,"correct":29},"目标计划的制定",{"key":24,"text":350,"correct":22},"管理制度建设",{"key":27,"text":352,"correct":22},"技术文件准备",{"key":31,"text":354,"correct":22},"物资准备",{"key":34,"text":356,"correct":22},"辅助条件检查","BCDE",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":372,"analysis":37},983039,"资金申请报告的内容包括()。",[362,364,366,368,370],{"key":20,"text":363,"correct":29},"政府投资项目的可行性研究报告",{"key":24,"text":365,"correct":22},"项目单位的基本情况和财务状况",{"key":27,"text":367,"correct":29},"实行备案管理的企业投资项目的备案意见",{"key":31,"text":369,"correct":22},"项目的基材情况",{"key":34,"text":371,"correct":22},"国家发展改革委要求提供的其他内容","BDE",{"id":374,"libraryId":5,"type":15,"typeLabel":16,"stem":375,"options":376,"answer":96,"analysis":37},983040,"施工职业健康与安全管理要求必须把好安全生产“六关”，有()。",[377,379,381,383,385],{"key":20,"text":378,"correct":22},"措施关",{"key":24,"text":380,"correct":22},"交底关",{"key":27,"text":382,"correct":22},"教育关",{"key":31,"text":384,"correct":29},"验收关",{"key":34,"text":386,"correct":22},"改进关",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":52,"analysis":37},983041,"下列险种中，与工程相关的有()。",[391,393,395,397,398],{"key":20,"text":392,"correct":22},"意外伤害保险",{"key":24,"text":394,"correct":22},"监理责任保险",{"key":27,"text":396,"correct":22},"设计责任保险",{"key":31,"text":89,"correct":22},{"key":34,"text":399,"correct":29},"平安险",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":414,"analysis":37},983042,"下列各项属于职业健康安全管理具体内容的有()。",[404,406,408,410,412],{"key":20,"text":405,"correct":22},"作业安全",{"key":24,"text":407,"correct":29},"施工安全",{"key":27,"text":409,"correct":29},"职员健康",{"key":31,"text":411,"correct":29},"操作安全",{"key":34,"text":413,"correct":22},"职业健康","AE",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":52,"analysis":37},983043,"企业投资项目核准的条件包括()。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"符合国家法律、法规",{"key":24,"text":422,"correct":22},"符合国民经济和社会发展规划",{"key":27,"text":424,"correct":22},"符合国家宏观调控政策",{"key":31,"text":426,"correct":22},"主要产品未对国内市场形成垄断",{"key":34,"text":428,"correct":29},"企业投资资金安全和设备风险可控",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":256,"analysis":37},983044,"建造管理模式的特点包括()。",[433,435,437,439,441],{"key":20,"text":434,"correct":22},"建造管理模式的技术基础是快速路径法",{"key":24,"text":436,"correct":22},"由业主及业主委托的CM经理与建筑师组成一个联合小组，共同组织和管理项目建造期的规划、设计和施工",{"key":27,"text":438,"correct":29},"业主与各个设计、施工承包商、设备供应商、安装单位等签订合同，是咨询合同关系",{"key":31,"text":440,"correct":29},"CM模式下的合同方式多为接续发包，管理协调简单",{"key":34,"text":442,"correct":22},"CM模式下，管理造成的损失与收益由业主直接承担或享有",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":328,"analysis":37},983045,"关于施工职业健康与安全管理的基本要求，下列说法正确的有()。",[447,449,451,453,455],{"key":20,"text":448,"correct":22},"各类人员必须具备相应的执业资格才能上岗",{"key":24,"text":450,"correct":29},"施工机械经过安全检查后即可使用",{"key":27,"text":452,"correct":22},"施工单位必须持有《施工企业安全合格证》",{"key":31,"text":454,"correct":22},"施工现场所有安全设施应确保齐全，并符合国家及地方有关规定",{"key":34,"text":456,"correct":22},"只有取得安全行政主管部门颁发的《安全施工许可证》以后才可以开工",{"id":458,"libraryId":5,"type":15,"typeLabel":16,"stem":459,"options":460,"answer":52,"analysis":37},983046,"项目的试运行及质量保修管理期间，人员培训应考虑()。",[461,463,465,467,469],{"key":20,"text":462,"correct":22},"制订培训计划",{"key":24,"text":464,"correct":22},"确定培训对象与培训目的",{"key":27,"text":466,"correct":22},"人员培训的原则",{"key":31,"text":468,"correct":22},"培训地点",{"key":34,"text":470,"correct":29},"培训通过标准",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":372,"analysis":37},983047,"按照受损程度将利益群体划分为()。",[475,477,479,481,483],{"key":20,"text":476,"correct":29},"受损较小",{"key":24,"text":478,"correct":22},"受损较大",{"key":27,"text":480,"correct":29},"受损较轻",{"key":31,"text":482,"correct":22},"受损一般",{"key":34,"text":484,"correct":22},"受损严重",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":96,"analysis":37},983048,"勘察设计单位的利益诉求包括()。",[489,491,493,495,497],{"key":20,"text":490,"correct":22},"业主的项目功能策划清晰",{"key":24,"text":492,"correct":22},"业主及时提供方案设计任务书及工程设计任务书",{"key":27,"text":494,"correct":22},"业主给予的设计周期充分，设计变更要求少、审批快",{"key":31,"text":496,"correct":29},"设计单位提供的图纸没有或极少有错误",{"key":34,"text":498,"correct":22},"及时支付设计费用",{"id":500,"libraryId":5,"type":15,"typeLabel":16,"stem":501,"options":502,"answer":285,"analysis":37},983049,"关于敏感性分析，下列说法正确的有()。",[503,505,507,509,511],{"key":20,"text":504,"correct":29},"主要分析产品价格波动对方案净收益的影响，则可选用内部收益率作为分析指标",{"key":24,"text":506,"correct":22},"敏感因素是指其变化会对项目发生很大影响的不确定因素",{"key":27,"text":508,"correct":22},"一般而言，灵敏度越大的因素越敏感",{"key":31,"text":510,"correct":29},"敏感性分析的核心是寻找敏感因素并加以分析",{"key":34,"text":512,"correct":22},"按同时分析的不确定因素的多少，敏感性分析分为单因素敏感性分析和多因素敏感性分析",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":96,"analysis":37},983050,"工程建设项目勘察、设计质量控制的内容比较繁杂，其要求包括()。",[517,519,521,523,525],{"key":20,"text":518,"correct":22},"执行国家建设法律法规和各项技术标准",{"key":24,"text":520,"correct":22},"控制工程总造价，达到项目技术经济目标的要求",{"key":27,"text":522,"correct":22},"建筑材料、构配件和设备的质量必须符合国家及行业规定的标准",{"key":31,"text":524,"correct":29},"施工作业技术活动的投入与产出过程的质量控制",{"key":34,"text":526,"correct":22},"勘察成果（报告）应符合国家和合同规定的要求",{"id":528,"libraryId":5,"type":15,"typeLabel":16,"stem":529,"options":530,"answer":357,"analysis":37},983051,"在施工现场的组织与协调阶段，业主应该()。",[531,533,535,537,539],{"key":20,"text":532,"correct":29},"控制项目工程进度",{"key":24,"text":534,"correct":22},"建立工程协调制度",{"key":27,"text":536,"correct":22},"督促各施工单位整理并保管好各类工程技术资料，及时绘制竣工图纸",{"key":31,"text":538,"correct":22},"定期提供各类工程项目管理报表",{"key":34,"text":540,"correct":22},"组织落实工地的现场安全保卫及工程成品保护工作",{"id":542,"libraryId":5,"type":15,"typeLabel":16,"stem":543,"options":544,"answer":81,"analysis":37},983052,"施工质量控制包括施工准备、施工过程、施工验收等过程的质量控制。下列工程中，属于施工过程质量控制的有()。",[545,547,549,551,553],{"key":20,"text":546,"correct":29},"施工组织设计审核",{"key":24,"text":548,"correct":22},"质量控制点设置",{"key":27,"text":550,"correct":22},"工程变更控制",{"key":31,"text":552,"correct":29},"质量回访",{"key":34,"text":554,"correct":29},"图纸会审",{"id":556,"libraryId":5,"type":15,"typeLabel":16,"stem":557,"options":558,"answer":96,"analysis":37},983053,"项目试生产阶段，业主的管理工作内容包括()。",[559,561,563,565,567],{"key":20,"text":560,"correct":22},"组织编制重要设施与生产设备的使用及维修手册",{"key":24,"text":562,"correct":22},"进行生产人员及物业管理人员的培训",{"key":27,"text":564,"correct":22},"组织项目的物业管理单位参与项目建筑设备的调试与验收",{"key":31,"text":566,"correct":29},"检查和记录工程质量缺陷，对缺陷原因进行调查分析并确定责任归属",{"key":34,"text":568,"correct":22},"审核本阶段各类付款",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":96,"analysis":37},983054,"建设工程施工质量验收的要求主要有()。",[573,575,577,579,581],{"key":20,"text":574,"correct":22},"在工程质量验收之前，施工单位应完成自行的检查评定",{"key":24,"text":576,"correct":22},"隐蔽工程应在隐蔽前由施工单位通知有关单位进行验收，并形成验收文件",{"key":27,"text":578,"correct":22},"应安排具有规定资格的人员参加施工质量验收",{"key":31,"text":580,"correct":29},"涉及结构安全的材料及施工内容，应对材料及施工内容进行全面检测",{"key":34,"text":582,"correct":22},"工程外观质量应由验收人员通过现场检查后共同确认结果",{"id":584,"libraryId":5,"type":15,"typeLabel":16,"stem":585,"options":586,"answer":357,"analysis":37},983055,"工程建设项目质量的影响因素有()。",[587,589,591,593,595],{"key":20,"text":588,"correct":29},"人员储备",{"key":24,"text":590,"correct":22},"施工方法",{"key":27,"text":592,"correct":22},"决策过程",{"key":31,"text":594,"correct":22},"材料和设备",{"key":34,"text":596,"correct":22},"施工环境",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":611,"analysis":37},983056,"设计任务采购过程中，确定中标人的方式主要有()。",[601,603,605,607,609],{"key":20,"text":602,"correct":22},"以方案优劣评价因素为主",{"key":24,"text":604,"correct":22},"以设计承诺为主决定中标",{"key":27,"text":606,"correct":29},"以设计方案价格因素为主",{"key":31,"text":608,"correct":29},"以设计方案可操作性为主",{"key":34,"text":610,"correct":29},"以设计单位规模大小为主","AB",{"id":613,"libraryId":5,"type":15,"typeLabel":16,"stem":614,"options":615,"answer":184,"analysis":37},983057,"在项目设计阶段经常出现的问题主要有()。",[616,618,620,622,624],{"key":20,"text":617,"correct":22},"图纸的可施工性差",{"key":24,"text":619,"correct":29},"设计深度不能达到规定的标准",{"key":27,"text":621,"correct":22},"采用材料设备的可获得性差",{"key":31,"text":623,"correct":29},"新施工工法的经济性差",{"key":34,"text":625,"correct":29},"设计费用支付不及时",{"id":627,"libraryId":5,"type":15,"typeLabel":16,"stem":628,"options":629,"answer":36,"analysis":37},983058,"技术协调应从施工过程管理的组织结构、制约机制、协调程序等方面着手，采取的措施主要有()。",[630,632,634,636,638],{"key":20,"text":631,"correct":22},"建立科学的项目管理内、外部结构",{"key":24,"text":633,"correct":22},"建立高效合理的项目管理机制",{"key":27,"text":635,"correct":29},"整理并保管各类工程技术资料",{"key":31,"text":637,"correct":22},"建立技术及信息的协调管理程序",{"key":34,"text":639,"correct":22},"建立快捷的信息管理枢纽",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":52,"analysis":37},983059,"竣工验收资料管理从()方面为承包商带来风险。",[644,646,648,650,652],{"key":20,"text":645,"correct":22},"由于施工项目经理部或企业未按有关资料管理的规定做，使竣工资料不全或混乱",{"key":24,"text":647,"correct":22},"监理人未能按规定及时签发相关资料，以致在竣工验收时发生纠纷",{"key":27,"text":649,"correct":22},"资源供应方为了今后索取款项故意不按时交付有关证明文件",{"key":31,"text":651,"correct":22},"由于市场的供求机制不健全，法规不健全，发包人拖欠工程款，承包人拖欠材料款",{"key":34,"text":653,"correct":29},"洪水、地震等不可抗拒自然条件，复杂地质，施工对环境的影响",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":256,"analysis":37},983060,"项目主要参与方共同编制并执行的多级进度计划体系包括()。",[658,660,662,664,666],{"key":20,"text":659,"correct":22},"项目进度总控制计划",{"key":24,"text":661,"correct":22},"各专业工程进度计划",{"key":27,"text":663,"correct":29},"各单项工程进度计划",{"key":31,"text":665,"correct":29},"项目长周期工程综合进度计划",{"key":34,"text":667,"correct":22},"项目短周期工程综合进度计划",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":682,"analysis":37},983061,"业主与其聘请的项目管理单位组成一体团队，共同进行项目管理工作的特点有()。",[672,674,676,678,680],{"key":20,"text":673,"correct":29},"适用于保密性强的特殊项目",{"key":24,"text":675,"correct":22},"可减少项目管理工作的接口和界面，提高效率",{"key":27,"text":677,"correct":29},"重大事项由业主决策，管理责任划分清楚",{"key":31,"text":679,"correct":29},"合同体系以项目管理单位为中心",{"key":34,"text":681,"correct":22},"项目团队建设及组织融合有一定困难","BE",{"id":684,"libraryId":5,"type":15,"typeLabel":16,"stem":685,"options":686,"answer":52,"analysis":37},983062,"一般工程建设项目，项目勘察需要进行()。",[687,689,691,693,695],{"key":20,"text":688,"correct":22},"可研勘察",{"key":24,"text":690,"correct":22},"初设勘察",{"key":27,"text":692,"correct":22},"详细勘察",{"key":31,"text":694,"correct":22},"施工勘察",{"key":34,"text":696,"correct":29},"竣工勘察",{"id":698,"libraryId":5,"type":15,"typeLabel":16,"stem":699,"options":700,"answer":710,"analysis":37},983063,"工程建设项目的环境管理主要体现在()的控制。",[701,703,705,707,708],{"key":20,"text":702,"correct":22},"项目设计方案",{"key":24,"text":704,"correct":29},"项目施工方案",{"key":27,"text":706,"correct":29},"施工工艺",{"key":31,"text":596,"correct":22},{"key":34,"text":709,"correct":29},"组织管理","AD",{"id":712,"libraryId":5,"type":15,"typeLabel":16,"stem":713,"options":714,"answer":724,"analysis":37},983064,"按进度计划编制的不同深度划分，项目进度计划的类型包括()。",[715,717,719,720,722],{"key":20,"text":716,"correct":22},"项目进度总体规划",{"key":24,"text":718,"correct":29},"控制性进度计划",{"key":27,"text":659,"correct":22},{"key":31,"text":721,"correct":22},"项目子系统进度计划",{"key":34,"text":723,"correct":29},"设计进度计划","ACD",{"id":726,"libraryId":5,"type":15,"typeLabel":16,"stem":727,"options":728,"answer":184,"analysis":37},983065,"国内初步设计的作用主要体现在()。",[729,731,733,735,737],{"key":20,"text":730,"correct":22},"作为衔接方案设计与施工图设计的技术链环",{"key":24,"text":732,"correct":29},"通过初步设计明确专业性的方案设计需求",{"key":27,"text":734,"correct":22},"对于政府投资的工程建设项目，经审批的初步设计及概算作为财政部门向建设单位拨付投资资金的根据",{"key":31,"text":736,"correct":29},"明确本项目基本功能构成",{"key":34,"text":738,"correct":29},"确定项目规划意见书的主要内容和条件",[740,744,747,750,753,756],{"id":741,"name":742,"category":7,"favorite":743},1,"领导干部任职前廉政法规知识测试题",92,{"id":745,"name":746,"category":7,"favorite":741},595,"建筑结构与设备",{"id":748,"name":749,"category":7,"favorite":741},715,"招标采购专业知识与法律法规",{"id":751,"name":752,"category":7,"favorite":741},848,"市政方向-通用基础",{"id":754,"name":755,"category":7,"favorite":8},534,"BIM工程师",{"id":757,"name":755,"category":7,"favorite":8},535]