[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-712-14":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":738},{"id":5,"name":6,"category":7,"favorite":8},712,"招标采购项目管理","建筑工程",0,14,50,927,[13,38,53,68,83,98,113,128,142,157,171,185,200,214,228,242,256,270,285,299,314,328,342,356,371,385,400,415,430,444,458,473,487,501,515,529,543,557,571,585,599,613,627,641,656,670,684,698,712,726],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},982966,2,"多选题","工程建设项目的设计依据主要包括()。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","方案设计任务书",true,{"key":24,"text":25,"correct":22},"B","工程设计任务书",{"key":27,"text":28,"correct":22},"C","“技术设计”要求",{"key":30,"text":31,"correct":32},"D","招标计划书",false,{"key":34,"text":35,"correct":32},"E","方案设计的选定","ABC","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},982967,"关于名义利率和实际利率，下列说法正确的有()。",[42,44,46,48,50],{"key":20,"text":43,"correct":32},"实际利率是指计息周期利率乘以一个利率周期内的计息次数所得到的利率",{"key":24,"text":45,"correct":22},"名义利率与实际利率之间的关系就如同单利与复利的关系",{"key":27,"text":47,"correct":22},"在技术经济分析中，有时存在计息周期与利率周期不一致的情况",{"key":30,"text":49,"correct":32},"在一个利率周期内，计息次数越少，实际利率越高",{"key":34,"text":51,"correct":22},"名义利率的计算没有考虑利滚利，是单利计算利息的方法","BCE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},982968,"煤气发生设备主要包括()。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"电气滤清器",{"key":24,"text":60,"correct":32},"水处理设备",{"key":27,"text":62,"correct":22},"煤气洗涤塔",{"key":30,"text":64,"correct":22},"竖管",{"key":34,"text":66,"correct":32},"燃料供应设备","ACD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},982969,"关于企业投资项目的核准程序，下列说法正确的有()。",[72,74,76,78,80],{"key":20,"text":73,"correct":32},"企业完成项目可行性研究后，应将可行性研究的基本意见和结论直接上报政府主管部门进行审核",{"key":24,"text":75,"correct":22},"核准机关受理核准申请后，如有必要，可以委托有资格的咨询机构进行评估",{"key":27,"text":77,"correct":22},"对于可能会对公众利益造成重大影响的项目，项目核准机关在进行核准审查时应采取适当方式征求公众意见",{"key":30,"text":79,"correct":22},"对于特别重大的项目，可以实行专家评议制度",{"key":34,"text":81,"correct":22},"对同意核准的项目，核准机关应向项目申报单位出具项目核准文件，同时抄送相关部门和项目下级核准机关","BCDE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},982970,"施工过程不可接受的损害风险通常是指()。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"超出了法律、法规和规章的要求",{"key":24,"text":90,"correct":22},"超出了企业施工安全的方针目标要求",{"key":27,"text":92,"correct":32},"超出了工会制定的施工安全要求",{"key":30,"text":94,"correct":32},"超出了国际上通行的施工安全要求",{"key":34,"text":96,"correct":22},"超出了人们普遍接受（通常是隐含）的要求","ABE",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":112,"analysis":37},982971,"常用的工程项目风险识别方法有()。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"PEST分析",{"key":24,"text":105,"correct":22},"专家调查法",{"key":27,"text":107,"correct":22},"故障树法",{"key":30,"text":109,"correct":32},"影响图法",{"key":34,"text":111,"correct":22},"幕景分析方法","ABCE",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":127,"analysis":37},982972,"现金流量图形象地表述了现金的变化过程，以下属于现金流量三要素的有()。",[117,119,121,123,125],{"key":20,"text":118,"correct":22},"流入与流出",{"key":24,"text":120,"correct":22},"量值的大小",{"key":27,"text":122,"correct":32},"发生的地点",{"key":30,"text":124,"correct":22},"发生的时点",{"key":34,"text":126,"correct":32},"利率的大小","ABD",{"id":129,"libraryId":5,"type":15,"typeLabel":16,"stem":130,"options":131,"answer":36,"analysis":37},982973,"工程技术与经济的分解决定了施工投标报价的方式，分解过程涉及()。",[132,134,136,138,140],{"key":20,"text":133,"correct":22},"技术类型划分",{"key":24,"text":135,"correct":22},"市场价格",{"key":27,"text":137,"correct":22},"拟采用的承包管理实施方式",{"key":30,"text":139,"correct":32},"设计方案的优劣",{"key":34,"text":141,"correct":32},"施工方案的可操作性",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},982974,"在项目的工程设计与计划阶段，业主与其聘请的管理咨询单位进度管理工作的重点是()。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"对外管理好工程设计的进度",{"key":24,"text":149,"correct":32},"制订项目进度的总体规划",{"key":27,"text":151,"correct":32},"控制计划的推行",{"key":30,"text":153,"correct":32},"编制完整的项目进度管理体系",{"key":34,"text":155,"correct":22},"对内控制好编制项目各项预控计划（包括组织、进度、投资等）的进度","AE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":127,"analysis":37},982975,"项目设计准备与审定决策阶段业主的管理工作内容包括()。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"项目方案设计的准备工作",{"key":24,"text":164,"correct":22},"确定项目建筑方案设计",{"key":27,"text":166,"correct":32},"编制项目管理实施方案",{"key":30,"text":168,"correct":22},"项目可行性研究的准备工作",{"key":34,"text":170,"correct":32},"工程设计质量管理",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":52,"analysis":37},982976,"下列各项属于路面施工的有()。",[175,177,179,181,183],{"key":20,"text":176,"correct":32},"石方施工",{"key":24,"text":178,"correct":22},"备料",{"key":27,"text":180,"correct":22},"路床施工",{"key":30,"text":182,"correct":32},"防护施工",{"key":34,"text":184,"correct":22},"路容整修",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},982977,"下列活动属于职业健康安全方针和环境方针管理任务的有()。",[189,191,193,195,197],{"key":20,"text":190,"correct":32},"分部分项工程内容的抽样检查",{"key":24,"text":192,"correct":22},"评审职业健康安全方针与环境方针所需的程序",{"key":27,"text":194,"correct":32},"按照计划评估资金使用的安全性",{"key":30,"text":196,"correct":22},"实施职业健康安全方针与环境方针所需的计划活动",{"key":34,"text":198,"correct":22},"保持职业健康安全方针与环境方针所需的惯例","BDE",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":36,"analysis":37},982978,"在PPP项目管理方式下，作为业主的管理，其实施方式可选择()。",[204,206,208,210,212],{"key":20,"text":205,"correct":22},"由单一或多家单纯投资人的组合组成社会资本投资公司",{"key":24,"text":207,"correct":22},"由单纯投资人或投资人组合与设计咨询单位组成社会资本投资公司",{"key":27,"text":209,"correct":22},"由单纯投资人或投资人组合与设计施工一体化承包人联合组成社会资本投资公司",{"key":30,"text":211,"correct":32},"由单纯投资人或投资人组合与专业项目管理单位进行管理承包组成社会资本投资公司",{"key":34,"text":213,"correct":32},"由单纯投资人或投资人组合委托专业管理咨询单位代理管理组成社会资本投资公司",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":82,"analysis":37},982979,"下列关于质量计划与施工组织设计、技术交底的关系的表述，正确的有()。",[218,220,222,224,226],{"key":20,"text":219,"correct":32},"质量计划必须作为施工组织设计的一部分，不可以单独编写",{"key":24,"text":221,"correct":22},"施工组织设计一般覆盖了质量计划的基本要求",{"key":27,"text":223,"correct":22},"施工组织设计与质量计划两者相辅相成，互相支撑",{"key":30,"text":225,"correct":22},"施工组织设计是项目实施的技术、方法和资源安排等的综合管理要求",{"key":34,"text":227,"correct":22},"技术交底是根据施工组织设计和质量计划等要求编制的针对工序活动策划的实施性规定",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":36,"analysis":37},982980,"工程保险不同于其他保险种类的特点表现有()。",[232,234,236,238,240],{"key":20,"text":233,"correct":22},"工程保险业务的专业水准要求高",{"key":24,"text":235,"correct":22},"保险金额很高",{"key":27,"text":237,"correct":22},"工程保险领域存在信息不对称问题",{"key":30,"text":239,"correct":32},"保险标的投保时具有完整性",{"key":34,"text":241,"correct":32},"保险条款不可变更",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":112,"analysis":37},982981,"项目总协调体系的构建，明确建设工程现场各参建单位管理组织机构的协调管理人员及其职责分工，()。",[246,248,250,252,254],{"key":20,"text":247,"correct":22},"形成工程情况报告制度",{"key":24,"text":249,"correct":22},"实施信息沟通网络",{"key":27,"text":251,"correct":22},"建立项目计划审核制度",{"key":30,"text":253,"correct":32},"建立技术及信息的开发程序",{"key":34,"text":255,"correct":22},"建立项目计划实施的检查分析制度",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":36,"analysis":37},982982,"工程建设项目经济效果评价的主要内容包括()。",[260,262,264,266,268],{"key":20,"text":261,"correct":22},"盈利能力评价",{"key":24,"text":263,"correct":22},"偿债能力评价",{"key":27,"text":265,"correct":22},"财务生存能力评价",{"key":30,"text":267,"correct":32},"国民经济评价",{"key":34,"text":269,"correct":32},"社会评价",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":284,"analysis":37},982983,"设备正式调试的一般步骤包括()。",[274,276,278,280,282],{"key":20,"text":275,"correct":22},"检查空负荷试车的确认文件和试车中出现的问题是否已经纠正",{"key":24,"text":277,"correct":32},"审查各项准备工作是否已满足试车的需要",{"key":27,"text":279,"correct":22},"做好试运行和带负荷试车方案与准备工作的落实",{"key":30,"text":281,"correct":22},"单项工程的带负荷试车",{"key":34,"text":283,"correct":22},"带负荷联动试车","ACDE",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":97,"analysis":37},982984,"下列各项属于土木工程材料的有()。",[289,291,293,295,297],{"key":20,"text":290,"correct":22},"砌筑材料",{"key":24,"text":292,"correct":22},"气硬性胶凝材料",{"key":27,"text":294,"correct":32},"复合材料",{"key":30,"text":296,"correct":32},"金属材料",{"key":34,"text":298,"correct":22},"混凝土",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":313,"analysis":37},982985,"工程保险的理赔原则包括()。",[303,305,307,309,311],{"key":20,"text":304,"correct":22},"重合同、守信用",{"key":24,"text":306,"correct":22},"实事求是",{"key":27,"text":308,"correct":22},"主动、迅速、准确、合理",{"key":30,"text":310,"correct":22},"近因",{"key":34,"text":312,"correct":32},"平等互利","ABCD",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":313,"analysis":37},982986,"工程建设项目勘察、设计质量控制的方法有()。",[318,320,322,324,326],{"key":20,"text":319,"correct":22},"科学策划项目勘察、设计实施方案",{"key":24,"text":321,"correct":22},"合理选择勘察、设计供方单位",{"key":27,"text":323,"correct":22},"控制勘察、设计过程和设计深度",{"key":30,"text":325,"correct":22},"验收勘察成果、组织设计方案评审和施工图图纸会审",{"key":34,"text":327,"correct":32},"确保勘察、设计方案满足建设单位提出的各项功能要求",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":284,"analysis":37},982987,"投保人和被保险人在工程保险合同下的义务有()。",[332,334,336,338,340],{"key":20,"text":333,"correct":22},"如实相告",{"key":24,"text":335,"correct":32},"相互信任",{"key":27,"text":337,"correct":22},"按期缴费",{"key":30,"text":339,"correct":22},"协助追偿",{"key":34,"text":341,"correct":22},"防灾防损",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":112,"analysis":37},982988,"在通用保险合同范本基础上，根据工程项目的实际情况，设计制定出最符合工程需要的保险方案。需要考虑的关键因素有()。",[346,348,350,352,354],{"key":20,"text":347,"correct":22},"保险项目的确定",{"key":24,"text":349,"correct":22},"保险金额\u002F赔偿限额的确定",{"key":27,"text":351,"correct":22},"免赔额的确定",{"key":30,"text":353,"correct":32},"被保险人的确定",{"key":34,"text":355,"correct":22},"保险期限的确定",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":370,"analysis":37},982989,"必须加以处理的特殊地基包括()。",[360,362,364,366,368],{"key":20,"text":361,"correct":32},"地下水层",{"key":24,"text":363,"correct":22},"风化、破碎岩层",{"key":27,"text":365,"correct":22},"岩溶与土洞",{"key":30,"text":367,"correct":22},"松散、软弱土层",{"key":34,"text":369,"correct":32},"边坡","BCD",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":199,"analysis":37},982990,"下列各项属于生产性建设项目的有()。",[375,377,379,381,383],{"key":20,"text":376,"correct":32},"广播电视",{"key":24,"text":378,"correct":22},"交通",{"key":27,"text":380,"correct":32},"咨询服务",{"key":30,"text":382,"correct":22},"邮电",{"key":34,"text":384,"correct":22},"地质普查",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":399,"analysis":37},982991,"在工程项目建设投资中，工程费用由()组成。",[389,391,393,395,397],{"key":20,"text":390,"correct":32},"建设用地费",{"key":24,"text":392,"correct":32},"基本预备费",{"key":27,"text":394,"correct":22},"建筑安装工程费",{"key":30,"text":396,"correct":32},"价差预备费",{"key":34,"text":398,"correct":22},"设备及工器具购置费","CE",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":414,"analysis":37},982992,"某工程采用暂估工程量固定单价合同，在施工阶段，导致业主方合同价格风险的主要因素有()。",[404,406,408,410,412],{"key":20,"text":405,"correct":32},"施工安全措施不当",{"key":24,"text":407,"correct":32},"市场物价起伏",{"key":27,"text":409,"correct":22},"工程量无法准确计算",{"key":30,"text":411,"correct":22},"清单中项目特征描述不明确",{"key":34,"text":413,"correct":32},"市场人工费上涨","CD",{"id":416,"libraryId":5,"type":15,"typeLabel":16,"stem":417,"options":418,"answer":429,"analysis":37},982993,"下列各项属于工程施工图预算审查方法的有()。",[419,421,423,425,427],{"key":20,"text":420,"correct":22},"全面审查法",{"key":24,"text":422,"correct":22},"分组计算审查法",{"key":27,"text":424,"correct":32},"反复审查法",{"key":30,"text":426,"correct":22},"筛选审查法",{"key":34,"text":428,"correct":22},"重点审查法","ABDE",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":429,"analysis":37},982994,"工程建设项目的不同参与方，在项目实施的全过程中，()。",[434,436,438,440,442],{"key":20,"text":435,"correct":22},"在项目中的角色及利益诉求不同",{"key":24,"text":437,"correct":22},"各方的管理虽然必须相互依存，相互影响，但也会产生矛盾冲突",{"key":27,"text":439,"correct":32},"各个不同参与方采用相同的管理方法和手段，避免矛盾",{"key":30,"text":441,"correct":22},"整体管理良好的工程建设项目都是各参与方利益较为平衡、管理较为协调的项目",{"key":34,"text":443,"correct":22},"项目各方最终要成为利益共同体",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":313,"analysis":37},982995,"工程建设常见的项目管理模式包括()。",[448,450,452,454,456],{"key":20,"text":449,"correct":22},"设计一招标一施工模式",{"key":24,"text":451,"correct":22},"建造管理模式",{"key":27,"text":453,"correct":22},"管理承包模式",{"key":30,"text":455,"correct":22},"工程设计采购建造模式",{"key":34,"text":457,"correct":32},"现代工程管理模式",{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":472,"analysis":37},982996,"设计任务的常见采购方式包括()。",[462,464,466,468,470],{"key":20,"text":463,"correct":22},"征集、竞赛方式",{"key":24,"text":465,"correct":32},"竞价",{"key":27,"text":467,"correct":32},"磋商",{"key":30,"text":469,"correct":22},"招标方式",{"key":34,"text":471,"correct":32},"比选","AD",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":82,"analysis":37},982997,"施工职业健康与安全管理的特点有()。",[477,479,481,483,485],{"key":20,"text":478,"correct":32},"控制的静态性",{"key":24,"text":480,"correct":22},"控制的动态性",{"key":27,"text":482,"correct":22},"控制的范围广",{"key":30,"text":484,"correct":22},"控制的严谨性",{"key":34,"text":486,"correct":22},"控制系统的交叉性",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":67,"analysis":37},982998,"工程建设项目投资决策的原则包括()。",[491,493,495,497,499],{"key":20,"text":492,"correct":22},"效益决策原则",{"key":24,"text":494,"correct":32},"回避利益冲突原则",{"key":27,"text":496,"correct":22},"决策责任制原则",{"key":30,"text":498,"correct":22},"科学决策原则",{"key":34,"text":500,"correct":32},"经济性原则",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":514,"analysis":37},982999,"工程保险除遵循近因原则外，还应遵循()原则。",[505,507,509,511,512],{"key":20,"text":506,"correct":22},"保险利益",{"key":24,"text":508,"correct":32},"不计免赔",{"key":27,"text":510,"correct":22},"损害补偿",{"key":30,"text":339,"correct":32},{"key":34,"text":513,"correct":22},"最大诚信","ACE",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":429,"analysis":37},983000,"设计准备阶段的基本工作内容及步骤主要有()。",[519,521,523,525,527],{"key":20,"text":520,"correct":22},"业主完成项目建议书的审批或完成项目申请报告的备案或核准，工程建设项目立项",{"key":24,"text":522,"correct":22},"业主获得国有土地管理部门对项目建设用地使用权属及建设性质的认定",{"key":27,"text":524,"correct":32},"业主基于项目建议书的内容进行项目功能需求评价",{"key":30,"text":526,"correct":22},"完成可开工建设项目的“可研勘察”，获得规划建设用地的初步水文地质资料",{"key":34,"text":528,"correct":22},"获得项目所在地城市规划管理部门对项目建设类型及规划条件的认可，取得项目建设的“规划意见书”",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":429,"analysis":37},983001,"下列各项属于设备及安装工程概算编制方法的有()。",[533,535,537,539,541],{"key":20,"text":534,"correct":22},"预算单价法",{"key":24,"text":536,"correct":22},"扩大单价法",{"key":27,"text":538,"correct":32},"工料单价法",{"key":30,"text":540,"correct":22},"设备价值百分比法",{"key":34,"text":542,"correct":22},"综合吨位指标法",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":112,"analysis":37},983002,"一体化管理体系构建和实施主要包括()。",[547,549,551,553,555],{"key":20,"text":548,"correct":22},"建立一体化的管理方针目标",{"key":24,"text":550,"correct":22},"调整组织结构",{"key":27,"text":552,"correct":22},"制订管理措施计划或管理方案",{"key":30,"text":554,"correct":32},"管理体系的运行和改进",{"key":34,"text":556,"correct":22},"确定体系文件",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":82,"analysis":37},983003,"下列项目中，一般应进行经济费用效益分析的有()。",[561,563,565,567,569],{"key":20,"text":562,"correct":32},"基础设施建设项目",{"key":24,"text":564,"correct":22},"国家及地方政府参与投资的项目",{"key":27,"text":566,"correct":22},"具有垄断特征的项目",{"key":30,"text":568,"correct":22},"外部效果显著的项目",{"key":34,"text":570,"correct":22},"涉及国家经济安全的项目",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":284,"analysis":37},983004,"关于工程建设项目管理实施方法的说法，正确的有（)。",[575,577,579,581,583],{"key":20,"text":576,"correct":22},"采用快速路径法可使项目工期更短",{"key":24,"text":578,"correct":32},"快速路径法相对于线性顺序法更先进",{"key":27,"text":580,"correct":22},"采用线性顺序法可使项目风险更小",{"key":30,"text":582,"correct":22},"同一个项目中可同时采用线性顺序法和快速路径法",{"key":34,"text":584,"correct":22},"快速路径法应以线性顺序法为基础",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":399,"analysis":37},983005,"项目施工单位在不同的承包方式下，施工单位或工程总承包方介入的阶段各不相同。下列说法错误的有()。",[589,591,593,595,597],{"key":20,"text":590,"correct":32},"在国内施工总承包的方式下，施工单位在中标后照图施工，介入的是项目的施工阶段",{"key":24,"text":592,"correct":32},"在国外施工总承包方式下，施工单位介入了项目的施工图设计阶段",{"key":27,"text":594,"correct":22},"在国外施工总承包方式下，施工单位介入的是项目的施工阶段",{"key":30,"text":596,"correct":32},"在EPC工程总承包方式下，EPC工程总承包方介入的是项目建造的全过程",{"key":34,"text":598,"correct":22},"在EPC工程总承包方式下，EPC工程总承包方介入的是项目的施工阶段",{"id":600,"libraryId":5,"type":15,"typeLabel":16,"stem":601,"options":602,"answer":36,"analysis":37},983006,"承担勘察与设计业务的资质要求包括()。",[603,605,607,609,611],{"key":20,"text":604,"correct":22},"承担工程勘察任务，不论处于哪一个勘察阶段，均应具有“工程勘察资质”",{"key":24,"text":606,"correct":22},"承担项目的“工程设计”任务须具有“工程设计资质”，但对承担方案设计任务的设计单位不受限制",{"key":27,"text":608,"correct":22},"对承担方案设计任务的设计单位，只要具备相应的能力及相关的业绩支持，必要时在有管辖权的勘察设计管理部门进行备案即可",{"key":30,"text":610,"correct":32},"设计单位具有协调专业设计分包方的能力",{"key":34,"text":612,"correct":32},"提供的图纸没有错误",{"id":614,"libraryId":5,"type":15,"typeLabel":16,"stem":615,"options":616,"answer":313,"analysis":37},983007,"按现行法律法规及政府规章，工程建设项目竣工验收的依据包括()。",[617,619,621,623,625],{"key":20,"text":618,"correct":22},"工程建设项目据以建设的项目建议书、可行性研究报告及有关修改文件",{"key":24,"text":620,"correct":22},"工程设计文件",{"key":27,"text":622,"correct":22},"有关法律、法规和与项目相关的标准、规范",{"key":30,"text":624,"correct":22},"专业工程验收的确认文件",{"key":34,"text":626,"correct":32},"工程施工情况",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":429,"analysis":37},983008,"施工准备阶段，施工单位应负责的活动包括()。",[631,633,635,637,639],{"key":20,"text":632,"correct":22},"聘任项目经理",{"key":24,"text":634,"correct":22},"设立项目经理部",{"key":27,"text":636,"correct":32},"完成施工图纸的内部审查与外部审查",{"key":30,"text":638,"correct":22},"编制并完善施工组织设计及质量计划",{"key":34,"text":640,"correct":22},"施工现场准备",{"id":642,"libraryId":5,"type":15,"typeLabel":16,"stem":643,"options":644,"answer":655,"analysis":37},983009,"在项目整体的进度管理体系及各个参与方承担的进度管理工作中，()所做的进度管理工作处于核心地位。",[645,647,649,651,653],{"key":20,"text":646,"correct":22},"业主",{"key":24,"text":648,"correct":22},"管理咨询单位",{"key":27,"text":650,"correct":32},"项目部经理",{"key":30,"text":652,"correct":32},"监理单位",{"key":34,"text":654,"correct":32},"施工方与设计方","AB",{"id":657,"libraryId":5,"type":15,"typeLabel":16,"stem":658,"options":659,"answer":429,"analysis":37},983010,"《施工企业质量管理规范》在确保《质量管理体系要求》GB\u002FT19001-ISO9001的基础上，按照施工流程及其实施特点规定了施工活动的质量管理要求，()。",[660,662,664,666,668],{"key":20,"text":661,"correct":22},"系统反映了施工企业质量管理的基本要求",{"key":24,"text":663,"correct":22},"全面提升了施工企业质量管理的整体水平",{"key":27,"text":665,"correct":32},"集中表现了施工企业质量管理的核心水平",{"key":30,"text":667,"correct":22},"标志着施工企业质量管理体系的认证工作进入了新的阶段",{"key":34,"text":669,"correct":22},"充分体现了施工企业实施《质量管理体系要求》ISO9001的行业特点",{"id":671,"libraryId":5,"type":15,"typeLabel":16,"stem":672,"options":673,"answer":199,"analysis":37},983011,"一般根据项目的类型及其产生的影响，环境影响评价的工作内容分为()。",[674,676,678,680,682],{"key":20,"text":675,"correct":32},"建设条件调查",{"key":24,"text":677,"correct":22},"环境条件调查",{"key":27,"text":679,"correct":32},"项目分析",{"key":30,"text":681,"correct":22},"环境影响因素确定及分析",{"key":34,"text":683,"correct":22},"工程分析",{"id":685,"libraryId":5,"type":15,"typeLabel":16,"stem":686,"options":687,"answer":82,"analysis":37},983012,"生产运营准备期间，物资准备应注意()。",[688,690,692,694,696],{"key":20,"text":689,"correct":32},"主要材料和辅助材料的购买遵循“物美价廉”的原则",{"key":24,"text":691,"correct":22},"主要材料和辅助材料的材质必须符合规定的技术标准要求",{"key":27,"text":693,"correct":22},"供应的时间和数量应满足试运行的要求，并有一定合理储备",{"key":30,"text":695,"correct":22},"分析化验的器具材料、专用维修工具和备品备件要准备齐全",{"key":34,"text":697,"correct":22},"建立物资接货、保管和发放的相关规章制度",{"id":699,"libraryId":5,"type":15,"typeLabel":16,"stem":700,"options":701,"answer":313,"analysis":37},983013,"由各参与方各自的项目管理集成的项目管理体系中，业主的核心工作包括()。",[702,704,706,708,710],{"key":20,"text":703,"correct":22},"确定项目的功能与规模，安排筹融资",{"key":24,"text":705,"correct":22},"建立项目管理体系与架构",{"key":27,"text":707,"correct":22},"决定其他各方参与项目的时间、方式和条件",{"key":30,"text":709,"correct":22},"制订项目管理的各项目标，并编制项目管理的全部预控计划",{"key":34,"text":711,"correct":32},"优先做好自己的管理工作",{"id":713,"libraryId":5,"type":15,"typeLabel":16,"stem":714,"options":715,"answer":67,"analysis":37},983014,"关于工程建设项目全过程管理，下列说法正确的有()。",[716,718,720,722,724],{"key":20,"text":717,"correct":22},"施工阶段一般是指从项目开工直至工业或工艺处理设备完成安装，具备进行试车条件的过程",{"key":24,"text":719,"correct":32},"非工业项目包括立项决策阶段、设计准备阶段、设计阶段、施工阶段、动用前准备阶段和质保责任阶段",{"key":27,"text":721,"correct":22},"设计阶段的范围包括国内所称的初步设计及施工图设计",{"key":30,"text":723,"correct":22},"立项决策阶段是指自提出项目投资概念后到项目建议书获得批复的过程",{"key":34,"text":725,"correct":32},"项目竣工投入使用，工程实体进入运行管理状态，将完全脱离原工程建设的项目管理状态，不再具有原项目的属性",{"id":727,"libraryId":5,"type":15,"typeLabel":16,"stem":728,"options":729,"answer":429,"analysis":37},983015,"工程项目的参与方一般包括()。",[730,731,732,734,736],{"key":20,"text":646,"correct":22},{"key":24,"text":648,"correct":22},{"key":27,"text":733,"correct":32},"项目的承包商监督方",{"key":30,"text":735,"correct":22},"设计单位",{"key":34,"text":737,"correct":22},"施工单位",[739,743,746,749,752,755],{"id":740,"name":741,"category":7,"favorite":742},1,"领导干部任职前廉政法规知识测试题",92,{"id":744,"name":745,"category":7,"favorite":740},595,"建筑结构与设备",{"id":747,"name":748,"category":7,"favorite":740},715,"招标采购专业知识与法律法规",{"id":750,"name":751,"category":7,"favorite":740},848,"市政方向-通用基础",{"id":753,"name":754,"category":7,"favorite":8},534,"BIM工程师",{"id":756,"name":754,"category":7,"favorite":8},535]