[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-712-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":734},{"id":5,"name":6,"category":7,"favorite":8},712,"招标采购项目管理","建筑工程",0,12,50,927,[13,38,53,68,83,98,112,127,141,154,169,184,199,214,229,243,257,272,287,301,315,329,343,357,371,385,400,414,428,442,456,471,483,497,511,525,539,553,567,581,595,609,624,638,652,666,680,692,706,720],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},982866,2,"多选题","政府对招标采购活动的监管有多种分类，其分类依据包括()。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","监管类型",true,{"key":24,"text":25,"correct":26},"B","监管时间",false,{"key":28,"text":29,"correct":22},"C","监督对象",{"key":31,"text":32,"correct":22},"D","所属行业",{"key":34,"text":35,"correct":22},"E","项目投资类型","ACDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},982867,"政府依法对招标采购活动的行政管理职能包括()。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"不接受自行招标备案",{"key":24,"text":45,"correct":22},"指定发布招标公告的媒介",{"key":28,"text":47,"correct":26},"确定招标方式及招标内容",{"key":31,"text":49,"correct":22},"编制有关标准招标文本",{"key":34,"text":51,"correct":22},"招标代理机构资质管理及招标从业人员资格管理","BDE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},982868,"项目经理拥有的项目团队的组建权包括()。",[57,59,61,63,65],{"key":20,"text":58,"correct":26},"审核各类文件的权利",{"key":24,"text":60,"correct":22},"项目管理班子的组建权",{"key":28,"text":62,"correct":26},"项目管理团队的任免权",{"key":31,"text":64,"correct":22},"项目团队队员的选拔权",{"key":34,"text":66,"correct":26},"向项目采购团队下达指令的权利","BD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":82,"analysis":37},982869,"下列关于招标采购项目管理的说法中，正确的有()。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"招标采购整合管理的内容包括编制招标采购计划、确定目标和任务，制定招标采购的管理流程计划和制定控制措施、协调各种资源并实施",{"key":24,"text":75,"correct":22},"招标采购风险管理包括制订风险防范计划，识别并评估风险，确定风险应对措施，实施风险控制",{"key":28,"text":77,"correct":26},"招标采购时间管理即确定招标工作各环节的程序",{"key":31,"text":79,"correct":26},"招标采购范围管理的内容仅限于界定招标范围和招标服务工作范围",{"key":34,"text":81,"correct":22},"招标采购的采购管理的工作内容包括收集并分析市场信息，分析是否需要招标项目组织机构以外的资源","ABE",{"id":84,"libraryId":5,"type":15,"typeLabel":16,"stem":85,"options":86,"answer":97,"analysis":37},982870,"招标采购项目控制的措施中，下列各项属于采购费用控制措施的有()。",[87,89,91,93,95],{"key":20,"text":88,"correct":22},"减少额外费用支出",{"key":24,"text":90,"correct":26},"掌握项目总体进度对招标采购项目计划时间的要求",{"key":28,"text":92,"correct":22},"建立费用管理（申报、报销等）制度、标准及审核、审批程序",{"key":31,"text":94,"correct":22},"合理安排人力资源，避免间歇式工作，采用招标项目群管理方式，充分利用信息和共享资源",{"key":34,"text":96,"correct":26},"准确、完整的理解委托人的意图，提供完整的备案资料，与行政监督管理部门充分沟通，及时反馈过程问题","ACD",{"id":99,"libraryId":5,"type":15,"typeLabel":16,"stem":100,"options":101,"answer":97,"analysis":37},982871,"按照采购()原则要求，招标采购中产生的文件与资料，应当依法保存。",[102,104,106,108,110],{"key":20,"text":103,"correct":22},"公平",{"key":24,"text":105,"correct":26},"合法",{"key":28,"text":107,"correct":22},"公正",{"key":31,"text":109,"correct":22},"公开",{"key":34,"text":111,"correct":26},"公义",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},982872,"招标采购项目管理的内部风险包括()。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"道德风险",{"key":24,"text":119,"correct":22},"决策风险",{"key":28,"text":121,"correct":26},"环境风险",{"key":31,"text":123,"correct":22},"合同风险",{"key":34,"text":125,"correct":26},"质量风险","ABD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":82,"analysis":37},982873,"开标准备情况检查表的检查内容包括()。",[131,133,135,137,139],{"key":20,"text":132,"correct":22},"监督机构",{"key":24,"text":134,"correct":22},"评标委员会名单",{"key":28,"text":136,"correct":26},"定标原则",{"key":31,"text":138,"correct":26},"招标日程安排",{"key":34,"text":140,"correct":22},"主持人的发言稿",{"id":142,"libraryId":5,"type":15,"typeLabel":16,"stem":143,"options":144,"answer":36,"analysis":37},982874,"招标采购进度管理的主要内容包括()。",[145,147,149,150,152],{"key":20,"text":146,"correct":22},"准确、完整的理解委托人的意图，提供完整的备案资料",{"key":24,"text":148,"correct":26},"建设市场信息库并充分利用公共信息平台",{"key":28,"text":90,"correct":22},{"key":31,"text":151,"correct":22},"有效的做好项目和子目标工作的时间顺序和搭接关系",{"key":34,"text":153,"correct":22},"对里程碑计划和重要招标工作环节设置检查点，并定期进行考核",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":168,"analysis":37},982875,"协调招标人与中标人的利益时，应注意()。",[158,160,162,164,166],{"key":20,"text":159,"correct":26},"识别招标人与中标人的利益诉求的相同点",{"key":24,"text":161,"correct":22},"评价招标人与中标人之间的利益平衡的条件和可行性",{"key":28,"text":163,"correct":22},"评估确定平衡利益诉求措施的有效性和风险",{"key":31,"text":165,"correct":22},"制定合理科学、具有预见性的相关管理措施",{"key":34,"text":167,"correct":22},"把相关管理措施与招投标方案结合实施","BCDE",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":183,"analysis":37},982876,"招标采购总结应该()。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"把个案调查与以往的案例研究结合",{"key":24,"text":176,"correct":22},"把经验与教训结合",{"key":28,"text":178,"correct":22},"把定量分析与定性分析结合",{"key":31,"text":180,"correct":26},"把具体分析与综合分析结合",{"key":34,"text":182,"correct":22},"把集中起来与坚持下去结合","ABCE",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},982877,"在招标采购项目的团队建设中应注意的问题包括()。",[188,190,192,194,196],{"key":20,"text":189,"correct":22},"组建招标采购团队",{"key":24,"text":191,"correct":22},"明确招标采购项目经理的责任",{"key":28,"text":193,"correct":22},"明确招标采购项目经理的权力",{"key":31,"text":195,"correct":22},"确定招标采购的组织方式",{"key":34,"text":197,"correct":26},"确定招标采购项目造价工程师的权力","ABCD",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":213,"analysis":37},982878,"在项目跟踪中，属于项目的内部因素跟踪的有()。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"资金使用情况",{"key":24,"text":206,"correct":26},"政策制度",{"key":28,"text":208,"correct":22},"项目人员投入",{"key":31,"text":210,"correct":26},"自然环境",{"key":34,"text":212,"correct":22},"组织责任落实情况","ACE",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},982879,"下列各项中，属于采购管理主要工作内容的有()。",[218,220,222,224,226],{"key":20,"text":219,"correct":26},"组建团队，分配任务",{"key":24,"text":221,"correct":22},"收集并分析市场信息",{"key":28,"text":223,"correct":22},"分析是否需要招标项目组织机构以外的资源",{"key":31,"text":225,"correct":22},"制订计划并实施",{"key":34,"text":227,"correct":26},"确定招标工作各环节的顺序","BCD",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":36,"analysis":37},982880,"招标采购目标的特点包括()。",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"多重性",{"key":24,"text":236,"correct":26},"客观性",{"key":28,"text":238,"correct":22},"层次性",{"key":31,"text":240,"correct":22},"相关性",{"key":34,"text":242,"correct":22},"动态性",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":168,"analysis":37},982881,"跟踪分析报告的内容主要包括()等。",[247,249,251,253,255],{"key":20,"text":248,"correct":26},"跟踪技术",{"key":24,"text":250,"correct":22},"跟踪目的",{"key":28,"text":252,"correct":22},"起止时间",{"key":31,"text":254,"correct":22},"跟踪内容",{"key":34,"text":256,"correct":22},"合同履行中的偏差",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":271,"analysis":37},982882,"费用管理的服务要素包括()。",[261,263,265,267,269],{"key":20,"text":262,"correct":26},"工作排序",{"key":24,"text":264,"correct":22},"费用控制",{"key":28,"text":266,"correct":22},"费用预算",{"key":31,"text":268,"correct":26},"绩效评价",{"key":34,"text":270,"correct":26},"管理方案","BC",{"id":273,"libraryId":5,"type":15,"typeLabel":16,"stem":274,"options":275,"answer":286,"analysis":37},982883,"评标的控制内容包括()。",[276,278,280,282,284],{"key":20,"text":277,"correct":22},"提供符合评标的场所",{"key":24,"text":279,"correct":26},"相关接待工作无瑕疵",{"key":28,"text":281,"correct":26},"投标文件保管完好",{"key":31,"text":283,"correct":22},"评标委员会组建符合法律规定",{"key":34,"text":285,"correct":22},"为评标准备必要的表格、文具和服务","ADE",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":286,"analysis":37},982884,"招标采购项目风险管理的内容包括()。",[291,293,295,297,299],{"key":20,"text":292,"correct":22},"招标采购的风险识别",{"key":24,"text":294,"correct":26},"招标采购风险预防实施",{"key":28,"text":296,"correct":26},"招标采购风险预防计划",{"key":31,"text":298,"correct":22},"招标采购的风险评估",{"key":34,"text":300,"correct":22},"招标采购风险的监控",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":213,"analysis":37},982885,"下列关于合同报告和备案控制的描述，正确的有()。",[305,307,309,311,313],{"key":20,"text":306,"correct":22},"控制的内容包括备案和资料收集、归档等",{"key":24,"text":308,"correct":26},"经办人是资料员",{"key":28,"text":310,"correct":22},"审核人是项目经理",{"key":31,"text":312,"correct":26},"审批人是行政总监",{"key":34,"text":314,"correct":22},"经办人是报建员",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":198,"analysis":37},982886,"在进行招标采购项目管理时，常用的信息技术主要有()。",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"计算机网络技术及其应用",{"key":24,"text":322,"correct":22},"项目管理辅助工具",{"key":28,"text":324,"correct":22},"电子招投标交易系统",{"key":31,"text":326,"correct":22},"专用软件的应用",{"key":34,"text":328,"correct":26},"系统工程",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":82,"analysis":37},982887,"招标采购项目管理方案中，实现招标采购目标的相关内容有()。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"招标采购标的、技术标准和要求、批次、时机和顺序",{"key":24,"text":336,"correct":22},"质量、价格、进度需求目标分解及计划",{"key":28,"text":338,"correct":26},"沟通、标准化、信息、风险防范等计划",{"key":31,"text":340,"correct":26},"组织管理体系、制度、人力资源及费用计划",{"key":34,"text":342,"correct":22},"招标方式、组织形式的方法和原则",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":67,"analysis":37},982888,"招标采购收尾所运用的方法和技术包括()。",[347,349,351,353,355],{"key":20,"text":348,"correct":26},"合同管理",{"key":24,"text":350,"correct":22},"采购审计",{"key":28,"text":352,"correct":26},"绩效检查",{"key":31,"text":354,"correct":22},"协商解决",{"key":34,"text":356,"correct":26},"投诉建议",{"id":358,"libraryId":5,"type":15,"typeLabel":16,"stem":359,"options":360,"answer":183,"analysis":37},982889,"标的物合同履行跟踪的内容包括()。",[361,363,365,367,369],{"key":20,"text":362,"correct":22},"项目计划和目标的实现情况",{"key":24,"text":364,"correct":22},"项目的外部因素",{"key":28,"text":366,"correct":22},"项目的内部因素",{"key":31,"text":368,"correct":26},"项目的结果预测情况",{"key":34,"text":370,"correct":22},"对招标采购过程或结果的反馈",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":168,"analysis":37},982890,"招标采购标准化管理的作用包括()。",[375,377,379,381,383],{"key":20,"text":376,"correct":26},"实现最优采购目标",{"key":24,"text":378,"correct":22},"为招标采购的科学管理奠定了基础",{"key":28,"text":380,"correct":22},"促进工作效率提高，完善管理绩效",{"key":31,"text":382,"correct":22},"保证招标采购质量",{"key":34,"text":384,"correct":22},"预防风险",{"id":386,"libraryId":5,"type":15,"typeLabel":16,"stem":387,"options":388,"answer":399,"analysis":37},982891,"下列关于招标采购项目特点的描述，错误的有()。",[389,391,393,395,397],{"key":20,"text":390,"correct":26},"招标服务的提供与使用具有同步性",{"key":24,"text":392,"correct":22},"招标采购进度计划必须服从预期目标的进度要求",{"key":28,"text":394,"correct":22},"招标采购成本是指招标采购所发生的一切费用",{"key":31,"text":396,"correct":26},"招标采购项目一般工作内容单纯，工作周期较短",{"key":34,"text":398,"correct":22},"招标服务质量可以从功能性、经济性和范围性三个因素衡量","BCE",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":36,"analysis":37},982892,"招标采购实施阶段的标志性成果包括()。",[404,406,408,410,412],{"key":20,"text":405,"correct":22},"确定中标人",{"key":24,"text":407,"correct":26},"落实招标方案",{"key":28,"text":409,"correct":22},"采购合同授予",{"key":31,"text":411,"correct":22},"更新后的项目文件",{"key":34,"text":413,"correct":22},"更新后的项目管理计划",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":126,"analysis":37},982893,"在工程招标中，进度规划的内容有()。",[418,420,422,424,426],{"key":20,"text":419,"correct":22},"工程建设程序",{"key":24,"text":421,"correct":22},"招标相关工作顺序和时间安排",{"key":28,"text":423,"correct":26},"工程建设项目衔接配套",{"key":31,"text":425,"correct":22},"工程项目的细分",{"key":34,"text":427,"correct":26},"采购货物名称",{"id":429,"libraryId":5,"type":15,"typeLabel":16,"stem":430,"options":431,"answer":286,"analysis":37},982894,"关于项目经理应履行的职责，下列说法正确的有()。",[432,434,436,438,440],{"key":20,"text":433,"correct":22},"全面负责招标采购全过程活动",{"key":24,"text":435,"correct":26},"监督投标资金的使用情况",{"key":28,"text":437,"correct":26},"合理控制项目团队的人员结构",{"key":31,"text":439,"correct":22},"主持招标投标活动中的重大事项",{"key":34,"text":441,"correct":22},"主持编制或审核招标采购各类主要成果文件",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":36,"analysis":37},982895,"标的物合同履行管理过程常用的项目管理工具及技术包括()。",[446,448,450,452,454],{"key":20,"text":447,"correct":22},"采购绩效审查",{"key":24,"text":449,"correct":26},"订购系统",{"key":28,"text":451,"correct":22},"检查和审计",{"key":31,"text":453,"correct":22},"记录管理系统",{"key":34,"text":455,"correct":22},"索赔管理",{"id":457,"libraryId":5,"type":15,"typeLabel":16,"stem":458,"options":459,"answer":470,"analysis":37},982896,"下列风险应对措施中，属于风险转移方式的有()。",[460,462,464,466,468],{"key":20,"text":461,"correct":26},"资格预审",{"key":24,"text":463,"correct":26},"评标策略",{"key":28,"text":465,"correct":22},"投标担保",{"key":31,"text":467,"correct":22},"履约担保",{"key":34,"text":469,"correct":22},"保证保险","CDE",{"id":472,"libraryId":5,"type":15,"typeLabel":16,"stem":473,"options":474,"answer":286,"analysis":37},982897,"评标定标后，签订合同时招标方合同风险管理的主要措施包括()。",[475,476,477,479,481],{"key":20,"text":467,"correct":22},{"key":24,"text":465,"correct":26},{"key":28,"text":478,"correct":26},"严格资格预审",{"key":31,"text":480,"correct":22},"履约保证保险",{"key":34,"text":482,"correct":22},"合同主要条款的设置策略",{"id":484,"libraryId":5,"type":15,"typeLabel":16,"stem":485,"options":486,"answer":286,"analysis":37},982898,"下列关于工程招标采购项目控制的描述，错误的有()。",[487,489,491,493,495],{"key":20,"text":488,"correct":22},"招标文件出售时限的经办人是造价师",{"key":24,"text":490,"correct":26},"预备会的经办人是项目部办事员",{"key":28,"text":492,"correct":26},"标底或限价编制的审批人是项目经理",{"key":31,"text":494,"correct":22},"投标保证金的审核人是经营副总",{"key":34,"text":496,"correct":22},"评标的审核人是造价师",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":67,"analysis":37},982899,"下列方法中，可用于招标采购服务项目成本控制的有()。",[501,503,505,507,509],{"key":20,"text":502,"correct":26},"控制图法",{"key":24,"text":504,"correct":22},"类比估计法",{"key":28,"text":506,"correct":26},"抽样调查统计",{"key":31,"text":508,"correct":22},"费用计划曲线",{"key":34,"text":510,"correct":26},"甘特图法",{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":198,"analysis":37},982900,"招标采购项目是为实现招标采购目标，通过实施满足()等约束条件的一系列措施所做出的一次性努力。",[515,517,519,521,523],{"key":20,"text":516,"correct":22},"进度",{"key":24,"text":518,"correct":22},"质量",{"key":28,"text":520,"correct":22},"费用",{"key":31,"text":522,"correct":22},"资源",{"key":34,"text":524,"correct":26},"资金",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":168,"analysis":37},982901,"关于招标采购项目管理理论，下列说法正确的有()。",[529,531,533,535,537],{"key":20,"text":530,"correct":26},"质量保证的主要内容是过程控制点设置",{"key":24,"text":532,"correct":22},"费用控制的主要内容有费用计划、变更控制和费用调整",{"key":28,"text":534,"correct":22},"费用预算的主要内容有资源消耗、成本分类、资源分配等",{"key":31,"text":536,"correct":22},"管理方案的主要内容有项目背景描述、组织机构、工作分解、责任分配等",{"key":34,"text":538,"correct":22},"质量保证的主要内容有质量保证体系、招标方式、招标组织形式以及工作流程",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":52,"analysis":37},982902,"为了达到招标采购信息管理的目的，采购信息管理的方法包括()。",[543,545,547,549,551],{"key":20,"text":544,"correct":26},"了解供应商的信誉和经营能力",{"key":24,"text":546,"correct":22},"了解和掌握采购信息来源，对采购信息进行分类",{"key":28,"text":548,"correct":26},"掌握采购信息的基本流程",{"key":31,"text":550,"correct":22},"掌握采购信息管理的手段",{"key":34,"text":552,"correct":22},"建立采购信息管理系统",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":183,"analysis":37},982903,"下列关于招标采购风险应对措施的表述，正确的有()。",[557,559,561,563,565],{"key":20,"text":558,"correct":22},"保证保险的保险标的是被保证人的信用风险",{"key":24,"text":560,"correct":22},"保证保险实际上是一种担保业务",{"key":28,"text":562,"correct":22},"利用合同条款可以进一步明确当事人的权利和义务，转移部分采购风险",{"key":31,"text":564,"correct":26},"招标人为保证中标人能够按合同要求完成招标合同规定的义务，要求中标人提供合同担保",{"key":34,"text":566,"correct":22},"在招标采购过程中可采用合同保证保险和商业信用保证保险来转移供应商行为可能带来的信用风险和所提供的商品质量风险",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":198,"analysis":37},982904,"招标采购服务工作中发生的费用包括()。",[571,573,575,577,579],{"key":20,"text":572,"correct":22},"人力资源费",{"key":24,"text":574,"correct":22},"市场调研费",{"key":28,"text":576,"correct":22},"资料费",{"key":31,"text":578,"correct":22},"专家评审费",{"key":34,"text":580,"correct":26},"机械台班费",{"id":582,"libraryId":5,"type":15,"typeLabel":16,"stem":583,"options":584,"answer":286,"analysis":37},982905,"招标采购项目的管理要素包括()。",[585,587,589,591,593],{"key":20,"text":586,"correct":22},"人力资源",{"key":24,"text":588,"correct":26},"风险管理",{"key":28,"text":590,"correct":26},"信息管理",{"key":31,"text":592,"correct":22},"费用管理",{"key":34,"text":594,"correct":22},"质量管理",{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":198,"analysis":37},982906,"合同履行的跟踪策划的内容包括()。",[599,601,603,605,607],{"key":20,"text":600,"correct":22},"确定跟踪的对象",{"key":24,"text":602,"correct":22},"确定收集信息的范围",{"key":28,"text":604,"correct":22},"确定项目跟踪过程",{"key":31,"text":606,"correct":22},"确定跟踪的工作制度",{"key":34,"text":608,"correct":26},"确定跟踪的进度",{"id":610,"libraryId":5,"type":15,"typeLabel":16,"stem":611,"options":612,"answer":623,"analysis":37},982907,"一个项目的投标文件的组成内容应包括()。",[613,615,617,619,621],{"key":20,"text":614,"correct":22},"投标函部分",{"key":24,"text":616,"correct":22},"技术部分",{"key":28,"text":618,"correct":22},"商务部分",{"key":31,"text":620,"correct":26},"报价部分",{"key":34,"text":622,"correct":26},"经济部分","ABC",{"id":625,"libraryId":5,"type":15,"typeLabel":16,"stem":626,"options":627,"answer":198,"analysis":37},982908,"招标采购评价的原则包括()。",[628,630,632,634,636],{"key":20,"text":629,"correct":22},"现实性",{"key":24,"text":631,"correct":22},"全面性",{"key":28,"text":633,"correct":22},"透明性",{"key":31,"text":635,"correct":22},"可信性",{"key":34,"text":637,"correct":26},"针对性",{"id":639,"libraryId":5,"type":15,"typeLabel":16,"stem":640,"options":641,"answer":82,"analysis":37},982909,"招标人对外沟通的重要信息平台有()。",[642,644,646,648,650],{"key":20,"text":643,"correct":22},"招标公告",{"key":24,"text":645,"correct":22},"招标文件",{"key":28,"text":647,"correct":26},"招标准备会",{"key":31,"text":649,"correct":26},"资格预审文件",{"key":34,"text":651,"correct":22},"评标结果公示",{"id":653,"libraryId":5,"type":15,"typeLabel":16,"stem":654,"options":655,"answer":36,"analysis":37},982910,"招标采购项目化管理的全过程包括()。",[656,658,660,662,664],{"key":20,"text":657,"correct":22},"招标采购规划阶段",{"key":24,"text":659,"correct":26},"招标采购需求分析阶段",{"key":28,"text":661,"correct":22},"招标采购实施与控制阶段",{"key":31,"text":663,"correct":22},"标的物合同履行阶段",{"key":34,"text":665,"correct":22},"招标采购收尾阶段",{"id":667,"libraryId":5,"type":15,"typeLabel":16,"stem":668,"options":669,"answer":183,"analysis":37},982911,"招标采购信息收集的主要内容有()。",[670,672,674,676,678],{"key":20,"text":671,"correct":22},"与招标采购活动相关的法律、法规资料的收集",{"key":24,"text":673,"correct":22},"工程项目和产品信息收集",{"key":28,"text":675,"correct":22},"供应商信息收集",{"key":31,"text":677,"correct":26},"招标采购的人员组成收集",{"key":34,"text":679,"correct":22},"采购案例信息的收集",{"id":681,"libraryId":5,"type":15,"typeLabel":16,"stem":682,"options":683,"answer":126,"analysis":37},982912,"项目管理的三大主要管理目标包括()。",[684,686,687,689,690],{"key":20,"text":685,"correct":22},"成本",{"key":24,"text":518,"correct":22},{"key":28,"text":688,"correct":26},"投资",{"key":31,"text":516,"correct":22},{"key":34,"text":691,"correct":26},"信息",{"id":693,"libraryId":5,"type":15,"typeLabel":16,"stem":694,"options":695,"answer":198,"analysis":37},982913,"招标采购与合同制订风险控制的常用方法包括()。",[696,698,700,702,704],{"key":20,"text":697,"correct":22},"规避风险",{"key":24,"text":699,"correct":22},"接受风险",{"key":28,"text":701,"correct":22},"减轻风险",{"key":31,"text":703,"correct":22},"转移风险",{"key":34,"text":705,"correct":26},"消除风险",{"id":707,"libraryId":5,"type":15,"typeLabel":16,"stem":708,"options":709,"answer":198,"analysis":37},982914,"招标机构在落实质量管理的岗位责任体系方面应履行的职责有()。",[710,712,714,716,718],{"key":20,"text":711,"correct":22},"建立招标采购质量保证体系",{"key":24,"text":713,"correct":22},"确保招标采购活动程序的规范化",{"key":28,"text":715,"correct":22},"严格招标采购主要成果文件的校审程序",{"key":31,"text":717,"correct":22},"保证中标、合同、结算价格基本一致",{"key":34,"text":719,"correct":26},"招标采购团队建设",{"id":721,"libraryId":5,"type":15,"typeLabel":16,"stem":722,"options":723,"answer":623,"analysis":37},982915,"招标采购活动质量控制的目标有()。",[724,726,728,730,732],{"key":20,"text":725,"correct":22},"采购合同完善无歧义",{"key":24,"text":727,"correct":22},"采购签约价格合理低价",{"key":28,"text":729,"correct":22},"采购程序合法规范",{"key":31,"text":731,"correct":26},"采购在计划周期内完成",{"key":34,"text":733,"correct":26},"采购过程费用合理",[735,739,742,745,748,751],{"id":736,"name":737,"category":7,"favorite":738},1,"领导干部任职前廉政法规知识测试题",92,{"id":740,"name":741,"category":7,"favorite":736},595,"建筑结构与设备",{"id":743,"name":744,"category":7,"favorite":736},715,"招标采购专业知识与法律法规",{"id":746,"name":747,"category":7,"favorite":736},848,"市政方向-通用基础",{"id":749,"name":750,"category":7,"favorite":8},534,"BIM工程师",{"id":752,"name":750,"category":7,"favorite":8},535]