[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-712-11":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":742},{"id":5,"name":6,"category":7,"favorite":8},712,"招标采购项目管理","建筑工程",0,11,50,927,[13,38,53,68,82,97,112,127,142,157,171,185,200,214,229,243,258,273,287,301,315,329,343,358,372,386,401,416,430,444,459,473,487,501,515,529,543,557,571,585,600,614,627,641,655,670,685,700,714,728],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},982816,2,"多选题","责任矩阵是项目人力资源管理工具，下列说法正确的有()。",[19,23,26,29,33],{"key":20,"text":21,"correct":22},"A","责任矩阵是一种将工作分解结构与项目组织结构建立起对应关系的结构",true,{"key":24,"text":25,"correct":22},"B","责任矩阵以工作元素为行，组织单元为列，矩阵中的符号表示项目工作人员在每个工作单元中的参与角色或责任",{"key":27,"text":28,"correct":22},"C","责任矩阵建立在工作分解结构和项目组织结构确定之后，是项目工作的落实环节，也是项目计划控制和考核的依据",{"key":30,"text":31,"correct":32},"D","责任矩阵能够较清楚地反映出项目各工作部门或个人之间的工作责任和相互关系，但制作较难",false,{"key":34,"text":35,"correct":22},"E","责任矩阵可以使用在WBS的任何层次","ABCE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},982817,"项目的质量管理过程中，对于最终产品是有形产品的项目，其质量考核指标有()。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"性能和特点",{"key":24,"text":45,"correct":22},"可靠性和一致性",{"key":27,"text":47,"correct":22},"持久性和可维护性",{"key":30,"text":49,"correct":22},"美观性和感知质量",{"key":34,"text":51,"correct":32},"安全性和可维护性","ABCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},982818,"在项目生命周期的开始阶段，最适宜的成本计划管理方法有()。",[57,59,61,63,65],{"key":20,"text":58,"correct":32},"预算",{"key":24,"text":60,"correct":22},"估算",{"key":27,"text":62,"correct":22},"匡算",{"key":30,"text":64,"correct":32},"概算",{"key":34,"text":66,"correct":32},"精算","BC",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":36,"analysis":37},982819,"项目采购管理中，工作说明中应详述拟采购物品的()。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"规格",{"key":24,"text":75,"correct":22},"数量",{"key":27,"text":77,"correct":22},"性能参数",{"key":30,"text":79,"correct":32},"项目目标",{"key":34,"text":81,"correct":22},"工作地点",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},982820,"项目成本管理一般包括三个阶段性的任务，即包括()。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"估算成本",{"key":24,"text":89,"correct":32},"制定成本计划",{"key":27,"text":91,"correct":22},"制订预算",{"key":30,"text":93,"correct":22},"控制成本",{"key":34,"text":95,"correct":32},"进行成本核算","ACD",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},982821,"网络图中，工作的概念包括()。",[101,103,105,107,109],{"key":20,"text":102,"correct":22},"紧前工作",{"key":24,"text":104,"correct":22},"紧后工作",{"key":27,"text":106,"correct":32},"最早工作",{"key":30,"text":108,"correct":22},"汇聚工作",{"key":34,"text":110,"correct":22},"发散工作","ABDE",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},982822,"项目整合管理的过程包括()。",[116,118,120,122,124],{"key":20,"text":117,"correct":22},"制订项目章程",{"key":24,"text":119,"correct":22},"指导与管理项目执行",{"key":27,"text":121,"correct":32},"项目范围修正控制",{"key":30,"text":123,"correct":22},"实施整体变更控制",{"key":34,"text":125,"correct":32},"项目范围确认","ABD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},982823,"单代号网络计划图（见图）中，关键线路有()。",[131,133,135,137,139],{"key":20,"text":132,"correct":32},"A→B→E→G→I",{"key":24,"text":134,"correct":22},"A→B→E→H→I",{"key":27,"text":136,"correct":32},"A→C→E→G→I",{"key":30,"text":138,"correct":22},"A→C→E→H→I",{"key":34,"text":140,"correct":32},"A→C→F→H→I","BD",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":156,"analysis":37},982824,"项目整合管理的关注重点是项目各组成部分和参与要素之间交互界面的识别、监测和控制，这些交互界面一般包括()等。",[146,148,150,152,154],{"key":20,"text":147,"correct":22},"时间界面",{"key":24,"text":149,"correct":32},"环境界面",{"key":27,"text":151,"correct":22},"人员界面",{"key":30,"text":153,"correct":22},"技术界面",{"key":34,"text":155,"correct":22},"工作范围界面","ACDE",{"id":158,"libraryId":5,"type":15,"typeLabel":16,"stem":159,"options":160,"answer":36,"analysis":37},982825,"S曲线的绘制步骤包括()。",[161,163,165,167,169],{"key":20,"text":162,"correct":22},"编制项目进度计划的横道图",{"key":24,"text":164,"correct":22},"根据每单位时间内完成的工作或者投入的人力、物力和财力，计算单位时间（月、旬或周）的成本，在时标网络图上按时间编制成本计划",{"key":27,"text":166,"correct":22},"计算规定时间内计划累计支出的成本额",{"key":30,"text":168,"correct":32},"依据成本额衡量各项活动的重要性",{"key":34,"text":170,"correct":22},"根据累计计划成本，绘制S曲线",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":111,"analysis":37},982826,"绘制和使用因果分析图应注意的问题包括()。",[175,177,179,181,183],{"key":20,"text":176,"correct":22},"绘制因果分析图时应做到集思广益，互相启发",{"key":24,"text":178,"correct":22},"质量特性要具体，才便于分析和寻找原因",{"key":27,"text":180,"correct":32},"不同的质量特性应放在同一张因果分析图上进行分析",{"key":30,"text":182,"correct":22},"在原因分析时，应该从大到小，按一级、二级、三级原因的层次逐次进行分析，直至分解到具体的原因，以便采取对策",{"key":34,"text":184,"correct":22},"关键性的主要原因应该具体、简练而明确，并在图上做出标记",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":199,"analysis":37},982827,"关于项目成本管理常用工具，下列说法错误的有()。",[189,191,193,195,197],{"key":20,"text":190,"correct":32},"类比估算法是与已完成的类似项目进行类比",{"key":24,"text":192,"correct":32},"自上而下估算的基础是收集上层和中层管理人员的经验和判断",{"key":27,"text":194,"correct":22},"自上而下估算在有类似项目未完成的情况下应用",{"key":30,"text":196,"correct":22},"自下而上估算法首先从下往上估算整个项目费用",{"key":34,"text":198,"correct":32},"S曲线法中每一条S曲线都对应某一特定的进度计划","CD",{"id":201,"libraryId":5,"type":15,"typeLabel":16,"stem":202,"options":203,"answer":199,"analysis":37},982828,"在项目时间管理中，估算活动持续时间的准确性主要依赖于()。",[204,206,208,210,212],{"key":20,"text":205,"correct":32},"对项目的质量要求",{"key":24,"text":207,"correct":32},"项目范围定义",{"key":27,"text":209,"correct":22},"对项目工作了解程度",{"key":30,"text":211,"correct":22},"可以参考的历史经验",{"key":34,"text":213,"correct":32},"工作人员的个人经验",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":228,"analysis":37},982829,"项目中各项工作之间的逻辑关系具体表现为()等关系。",[218,220,222,224,226],{"key":20,"text":219,"correct":22},"平行",{"key":24,"text":221,"correct":32},"交叉",{"key":27,"text":223,"correct":32},"螺旋",{"key":30,"text":225,"correct":22},"顺序",{"key":34,"text":227,"correct":22},"搭接","ADE",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":242,"analysis":37},982830,"下列关于网络图中时差的表述，正确的有()。 A、网络图中，时差是指工作的机动时间，分为自由时差和总时差 B、自由时差（F F）是指在不影响其紧后工作最早开始时间的前提下，本工作可以利用的机动时间 C、总时差（T",[233,235,237,239,241],{"key":20,"text":234,"correct":22},"是指在不影响其紧后工作最早开始时间的前提下，本工作可以利用的机动时间",{"key":24,"text":236,"correct":22},"自由时差（F",{"key":27,"text":238,"correct":32},"是指在不影响计划完工工期的前提下，本工作可以利用的机动时间",{"key":30,"text":240,"correct":32},"总时差（T",{"key":34,"text":238,"correct":22},"ABE",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":257,"analysis":37},982831,"下列关于排列图曲线的说法，正确的有()。 A、通常将曲线的累计频率分为三级，与之相对应的因素分为 A、",[247,249,251,253,255],{"key":20,"text":248,"correct":22},"C三类",{"key":24,"text":250,"correct":32},"A类因素对应于频率0～70%，是影响质量的主要因素",{"key":27,"text":252,"correct":32},"B类因素对应于频率70%～80%，是影响质量的次要因素",{"key":30,"text":254,"correct":32},"C类因素对应于频率80%～100%，是影响质量的一般因素",{"key":34,"text":256,"correct":22},"运用排列图，便于找出主次矛盾，有利于针对性地采取对策","AE",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":272,"analysis":37},982832,"项目沟通管理的主要工作过程有()。",[262,264,266,268,270],{"key":20,"text":263,"correct":32},"组建项目组织",{"key":24,"text":265,"correct":22},"编制沟通计划",{"key":27,"text":267,"correct":22},"信息发布",{"key":30,"text":269,"correct":22},"编制绩效报告",{"key":34,"text":271,"correct":32},"薪酬管理","BCD",{"id":274,"libraryId":5,"type":15,"typeLabel":16,"stem":275,"options":276,"answer":52,"analysis":37},982833,"人力资源计划包括()。",[277,279,281,283,285],{"key":20,"text":278,"correct":22},"项目角色与职责记录",{"key":24,"text":280,"correct":22},"项目组织机构图",{"key":27,"text":282,"correct":22},"人员招募和遣散时间表",{"key":30,"text":284,"correct":22},"培训需求",{"key":34,"text":286,"correct":32},"为人员制定健全的医保计划",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":156,"analysis":37},982834,"项目风险管理的工作过程包括()。",[291,293,295,297,299],{"key":20,"text":292,"correct":22},"规划风险管理",{"key":24,"text":294,"correct":32},"风险评价与预测",{"key":27,"text":296,"correct":22},"定性风险分析",{"key":30,"text":298,"correct":22},"规划风险应对",{"key":34,"text":300,"correct":22},"监控风险",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":228,"analysis":37},982835,"已知某工程的双代号网络计划如图所示，下列说法正确的有()。",[305,307,309,311,313],{"key":20,"text":306,"correct":22},"该计划的工期为12天",{"key":24,"text":308,"correct":32},"工作④一⑥最早开始时间为4天",{"key":27,"text":310,"correct":32},"关键线路为①一③一⑤一⑥",{"key":30,"text":312,"correct":22},"工作②一⑥为非关键工作",{"key":34,"text":314,"correct":22},"关键线路为①一②一④一⑥",{"id":316,"libraryId":5,"type":15,"typeLabel":16,"stem":317,"options":318,"answer":52,"analysis":37},982836,"关于WBS的分解成果，下列说法正确的有()。",[319,321,323,325,327],{"key":20,"text":320,"correct":22},"WBS的分解成果包括工作分解结构和工作分解结构词典",{"key":24,"text":322,"correct":22},"工作分解结构是以可交付成果为导向的工作层级分解",{"key":27,"text":324,"correct":22},"工作分解结构词典是对工作分解结构组成部分（包括工作包和控制账户）进行的更详细描述",{"key":30,"text":326,"correct":22},"工作分解结构每向下分解一层，代表着对项目工作更详细的定义",{"key":34,"text":328,"correct":32},"常用的WBS分解成果的表达形式有层次结构图和数值形式",{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":36,"analysis":37},982837,"招标采购合同基础性资料包括()。",[333,335,337,339,341],{"key":20,"text":334,"correct":22},"采购管理计划",{"key":24,"text":336,"correct":22},"采购合同",{"key":27,"text":338,"correct":22},"采购管理的有关信息和文件",{"key":30,"text":340,"correct":32},"变更申请",{"key":34,"text":342,"correct":22},"工作绩效信息",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":357,"analysis":37},982838,"项目招标采购的经济风险主要包括()。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"国内经济波动",{"key":24,"text":350,"correct":22},"国际经济形势的变化",{"key":27,"text":352,"correct":22},"货币汇率变化",{"key":30,"text":354,"correct":32},"行贿受贿",{"key":34,"text":356,"correct":32},"交货期限的拖延风险","ABC",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":96,"analysis":37},982839,"招标采购的评价科目包括()。",[362,364,366,368,370],{"key":20,"text":363,"correct":22},"招标全过程质量",{"key":24,"text":365,"correct":32},"招标进度",{"key":27,"text":367,"correct":22},"采购数量",{"key":30,"text":369,"correct":22},"采购时间",{"key":34,"text":371,"correct":32},"招标成本",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":36,"analysis":37},982840,"沟通计划的内容包括()。",[376,378,380,382,384],{"key":20,"text":377,"correct":22},"需要提供的信息",{"key":24,"text":379,"correct":22},"提供信息的来源",{"key":27,"text":381,"correct":22},"传递信息的方式",{"key":30,"text":383,"correct":32},"信息的主要类型",{"key":34,"text":385,"correct":22},"提供信息的时间和方法",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":400,"analysis":37},982841,"下列关于招标采购项目管理方案的表述，正确的有()。",[390,392,394,396,398],{"key":20,"text":391,"correct":22},"是用于指导招标采购管理的初步纲领性文件",{"key":24,"text":393,"correct":22},"是指导招标采购工作具体开展的全局性指导文件",{"key":27,"text":395,"correct":32},"招标采购项目管理方案是在实施招标工作过程中，合理安排招标工作的总体规划",{"key":30,"text":397,"correct":32},"主要明确“做什么”、“谁负责”、“为什么做”“完成任务的起止时间”等基本管理内容",{"key":34,"text":399,"correct":32},"制定招标采购项目管理方案，就是把招标采购目标转换成定义明确、要求清晰，且可操作的项目总体规划文件的过程","AB",{"id":402,"libraryId":5,"type":15,"typeLabel":16,"stem":403,"options":404,"answer":415,"analysis":37},982842,"工作先后依赖关系包括()。",[405,407,409,411,413],{"key":20,"text":406,"correct":32},"隶属关系",{"key":24,"text":408,"correct":32},"协调关系",{"key":27,"text":410,"correct":22},"组织关系",{"key":30,"text":412,"correct":32},"工序关系",{"key":34,"text":414,"correct":22},"工艺关系","CE",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":357,"analysis":37},982843,"制定沟通计划是选择项目参与人员及项目外部环境之间的信息()。",[420,422,424,426,428],{"key":20,"text":421,"correct":22},"沟通渠道",{"key":24,"text":423,"correct":22},"沟通模式",{"key":27,"text":425,"correct":22},"沟通内容",{"key":30,"text":427,"correct":32},"沟通结果",{"key":34,"text":429,"correct":32},"沟通形式",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":242,"analysis":37},982844,"招标采购项目实施过程的风险控制是比较复杂，需要根据()确定风险控制策略。",[434,436,438,440,442],{"key":20,"text":435,"correct":22},"抗风险能力",{"key":24,"text":437,"correct":22},"招标采购的具体情况",{"key":27,"text":439,"correct":32},"风险管理者风险偏好",{"key":30,"text":441,"correct":32},"风险管理者风险敏感度",{"key":34,"text":443,"correct":22},"风险管理者的心理承受能力",{"id":445,"libraryId":5,"type":15,"typeLabel":16,"stem":446,"options":447,"answer":458,"analysis":37},982845,"下列招标采购项目风险中，因招标双方信息不对称产生的风险有()。",[448,450,452,454,456],{"key":20,"text":449,"correct":32},"经济风险",{"key":24,"text":451,"correct":22},"信用风险",{"key":27,"text":453,"correct":32},"政策风险",{"key":30,"text":455,"correct":22},"财务风险",{"key":34,"text":457,"correct":22},"道德风险","BDE",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":458,"analysis":37},982846,"招标采购项目化管理各个阶段的关系表现为()。",[463,465,467,469,471],{"key":20,"text":464,"correct":32},"招标采购各个阶段责任划分明确，相互独立",{"key":24,"text":466,"correct":22},"招标采购与整体项目管理各个阶段相互作用、相互影响",{"key":27,"text":468,"correct":32},"招标采购与项目管理的各个阶段完全重合",{"key":30,"text":470,"correct":22},"招标采购各个阶段的有关过程需要反复实施",{"key":34,"text":472,"correct":22},"招标采购管理与项目管理的知识领域互相交叠",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":156,"analysis":37},982847,"选择项目跟踪方法时应该注意的内容有()。",[477,479,481,483,485],{"key":20,"text":478,"correct":22},"应用先进的IT技术",{"key":24,"text":480,"correct":32},"项目跟踪的有效性",{"key":27,"text":482,"correct":22},"项目跟踪的及时性",{"key":30,"text":484,"correct":22},"信息的标准化和报表的规范化",{"key":34,"text":486,"correct":22},"项目跟踪的协调性",{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":228,"analysis":37},982848,"关于招标采购项目管理，下列说法正确的有()。",[491,493,495,497,499],{"key":20,"text":492,"correct":22},"招标采购质量控制的目标是确保招标程序合法，价格合理低价",{"key":24,"text":494,"correct":32},"招标采购成本和费用控制的目标是使采购成本和费用最低",{"key":27,"text":496,"correct":32},"可以利用工作结构分解方法来进行招标采购质量控制",{"key":30,"text":498,"correct":22},"招标采购进度控制的目标是满足建设项目整体进度的要求",{"key":34,"text":500,"correct":22},"可以通过采取事前预测，事中检查、纠正，事后总结、评价来达到招标采购质量控制的目标",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":156,"analysis":37},982849,"下列有关招标采购与项目管理关系的表述中，正确的有()。",[505,507,509,511,513],{"key":20,"text":506,"correct":22},"采购管理是项目管理的重要环节",{"key":24,"text":508,"correct":32},"项目失败是由于采购管理环节的问题",{"key":27,"text":510,"correct":22},"可以将招标采购作为一个项目进行管理",{"key":30,"text":512,"correct":22},"可以借助项目管理的方法和工具以便有效完成招标采购任务",{"key":34,"text":514,"correct":22},"采购管理本身具有项目的一般特征，涉及整合、范围、时间、质量、费用、人力资源、沟通、风险、资源采购以及干系人等各方面的管理任务",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":96,"analysis":37},982850,"关于招标采购项目管理方案的作用，下列说法正确的有()。",[519,521,523,525,527],{"key":20,"text":520,"correct":22},"建立采购目标系统",{"key":24,"text":522,"correct":32},"形成有效满足招标需求的项目管理机制，消除实施的风险",{"key":27,"text":524,"correct":22},"指导采购项目管理实施的具体工作",{"key":30,"text":526,"correct":22},"确立采购项目实施组织方式",{"key":34,"text":528,"correct":32},"拟定项目招标策略",{"id":530,"libraryId":5,"type":15,"typeLabel":16,"stem":531,"options":532,"answer":156,"analysis":37},982851,"招标采购团队的特征包括()。",[533,535,537,539,541],{"key":20,"text":534,"correct":22},"共同而明确的采购目标",{"key":24,"text":536,"correct":32},"招标采购团队是由同一部门、同一专业的员工组成",{"key":27,"text":538,"correct":22},"信息沟通顺畅",{"key":30,"text":540,"correct":22},"团队成员能力互补",{"key":34,"text":542,"correct":22},"角色适当分工",{"id":544,"libraryId":5,"type":15,"typeLabel":16,"stem":545,"options":546,"answer":156,"analysis":37},982852,"编制招标采购项目管理方案时，正确的处理原则有()。",[547,549,551,553,555],{"key":20,"text":548,"correct":22},"质量标准应适应招标市场的现实",{"key":24,"text":550,"correct":32},"不考虑采购活动的社会总成本",{"key":27,"text":552,"correct":22},"应充分考虑工作效率与工作质量的均衡",{"key":30,"text":554,"correct":22},"应将风险分配到能够以最低成本承担风险损失的承担者",{"key":34,"text":556,"correct":22},"应注意回避利益冲突",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":228,"analysis":37},982853,"招标采购计划实施过程中，检查计划实施情况的重点内容有()。",[561,563,565,567,569],{"key":20,"text":562,"correct":22},"招标采购工作的人员组成",{"key":24,"text":564,"correct":32},"招标采购费用支出",{"key":27,"text":566,"correct":32},"招标采购委托合同",{"key":30,"text":568,"correct":22},"招标采购中面临的风险",{"key":34,"text":570,"correct":22},"招标采购工作进度",{"id":572,"libraryId":5,"type":15,"typeLabel":16,"stem":573,"options":574,"answer":400,"analysis":37},982854,"招标采购评价的作用包括()。",[575,577,579,581,583],{"key":20,"text":576,"correct":22},"完善招标采购程序与制度",{"key":24,"text":578,"correct":22},"提高招标采购队伍的管理水平",{"key":27,"text":580,"correct":32},"为解决其他同类项目的合同问题提供基础信息和资料",{"key":30,"text":582,"correct":32},"促进招标投标行业可持续发展",{"key":34,"text":584,"correct":32},"规范管理行为",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":599,"analysis":37},982855,"招标采购活动的核心工作内容包括()。",[589,591,593,595,597],{"key":20,"text":590,"correct":22},"招标采购的实施",{"key":24,"text":592,"correct":32},"招标项目方案策划",{"key":27,"text":594,"correct":32},"合同的签订阶段",{"key":30,"text":596,"correct":22},"合同制定",{"key":34,"text":598,"correct":32},"招标项目的评价","AD",{"id":601,"libraryId":5,"type":15,"typeLabel":16,"stem":602,"options":603,"answer":96,"analysis":37},982856,"确定资格预审工作由()负责。",[604,606,608,610,612],{"key":20,"text":605,"correct":22},"项目经理",{"key":24,"text":607,"correct":32},"开标人员",{"key":27,"text":609,"correct":22},"采购团队辅助人员",{"key":30,"text":611,"correct":22},"造价工程师",{"key":34,"text":613,"correct":32},"工程技术人员",{"id":615,"libraryId":5,"type":15,"typeLabel":16,"stem":616,"options":617,"answer":126,"analysis":37},982857,"在责任分配矩阵中，()是项目经理通常担当的角色与责任。",[618,620,622,623,625],{"key":20,"text":619,"correct":22},"执行工作",{"key":24,"text":621,"correct":22},"部分或参与决策",{"key":27,"text":93,"correct":32},{"key":30,"text":624,"correct":22},"必须通报的",{"key":34,"text":626,"correct":32},"控制质量",{"id":628,"libraryId":5,"type":15,"typeLabel":16,"stem":629,"options":630,"answer":52,"analysis":37},982858,"招标采购评价的()是评价成败的关键环节。",[631,633,635,637,639],{"key":20,"text":632,"correct":22},"结论的扩散",{"key":24,"text":634,"correct":22},"反馈机制",{"key":27,"text":636,"correct":22},"手段",{"key":30,"text":638,"correct":22},"方法",{"key":34,"text":640,"correct":32},"内容",{"id":642,"libraryId":5,"type":15,"typeLabel":16,"stem":643,"options":644,"answer":156,"analysis":37},982859,"招标采购质量管理的管理要素包括()。",[645,647,649,651,653],{"key":20,"text":646,"correct":22},"质量控制",{"key":24,"text":648,"correct":32},"团队建设",{"key":27,"text":650,"correct":22},"管理方案",{"key":30,"text":652,"correct":22},"技术文件",{"key":34,"text":654,"correct":22},"质量验收",{"id":656,"libraryId":5,"type":15,"typeLabel":16,"stem":657,"options":658,"answer":669,"analysis":37},982860,"招标采购标准化管理的内容包括()。",[659,661,663,665,667],{"key":20,"text":660,"correct":32},"行业标准与规范的收集整理",{"key":24,"text":662,"correct":22},"招标采购流程的标准化管理",{"key":27,"text":664,"correct":22},"基础数据收集的标准化制定",{"key":30,"text":666,"correct":22},"招标采购检查、评价体系的标准化管理",{"key":34,"text":668,"correct":22},"招标采购文档体系的标准化管理","BCDE",{"id":671,"libraryId":5,"type":15,"typeLabel":16,"stem":672,"options":673,"answer":684,"analysis":37},982861,"招标采购项目进度计划必须具有()。",[674,676,678,680,682],{"key":20,"text":675,"correct":22},"合理性",{"key":24,"text":677,"correct":32},"可靠性",{"key":27,"text":679,"correct":22},"紧凑性",{"key":30,"text":681,"correct":32},"经济性",{"key":34,"text":683,"correct":32},"持久性","AC",{"id":686,"libraryId":5,"type":15,"typeLabel":16,"stem":687,"options":688,"answer":699,"analysis":37},982862,"货物招标采购进度规划中包含的内容有()。",[689,691,693,695,697],{"key":20,"text":690,"correct":32},"各批次采购活动的采购方式",{"key":24,"text":692,"correct":22},"各批次采购活动的顺序安排",{"key":27,"text":694,"correct":22},"各批次采购活动与工程建设项目或生产需求的衔接配套",{"key":30,"text":696,"correct":32},"各批次采购活动的划分依据及标准",{"key":34,"text":698,"correct":22},"各批次采购活动的时间节点","BCE",{"id":701,"libraryId":5,"type":15,"typeLabel":16,"stem":702,"options":703,"answer":36,"analysis":37},982863,"招标采购工作中，招标采购工作费用估计的主要依据包括()。",[704,706,708,710,712],{"key":20,"text":705,"correct":22},"WBS",{"key":24,"text":707,"correct":22},"历史信息",{"key":27,"text":709,"correct":22},"资源价格",{"key":30,"text":711,"correct":32},"采购人员的工资",{"key":34,"text":713,"correct":22},"工作的延续时间",{"id":715,"libraryId":5,"type":15,"typeLabel":16,"stem":716,"options":717,"answer":415,"analysis":37},982864,"为便于信息的搜集、处理、储存、传递和利用，采购信息管理应采用的措施包括()。",[718,720,722,724,726],{"key":20,"text":719,"correct":32},"更新信息",{"key":24,"text":721,"correct":32},"程序化措施",{"key":27,"text":723,"correct":22},"标准化措施",{"key":30,"text":725,"correct":32},"鉴别措施",{"key":34,"text":727,"correct":22},"制度化措施",{"id":729,"libraryId":5,"type":15,"typeLabel":16,"stem":730,"options":731,"answer":52,"analysis":37},982865,"招标采购进度计划制订的依据包括()。",[732,734,736,738,740],{"key":20,"text":733,"correct":22},"项目采购时间要求",{"key":24,"text":735,"correct":22},"项目采购的特点",{"key":27,"text":737,"correct":22},"项目采购的技术经济条件",{"key":30,"text":739,"correct":22},"招标采购各项工作的时间估计",{"key":34,"text":741,"correct":32},"招标采购各项工作的人员组合",[743,747,750,753,756,759],{"id":744,"name":745,"category":7,"favorite":746},1,"领导干部任职前廉政法规知识测试题",92,{"id":748,"name":749,"category":7,"favorite":744},595,"建筑结构与设备",{"id":751,"name":752,"category":7,"favorite":744},715,"招标采购专业知识与法律法规",{"id":754,"name":755,"category":7,"favorite":744},848,"市政方向-通用基础",{"id":757,"name":758,"category":7,"favorite":8},534,"BIM工程师",{"id":760,"name":758,"category":7,"favorite":8},535]