[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-712-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":595},{"id":5,"name":6,"category":7,"favorite":8},712,"招标采购项目管理","建筑工程",0,1,50,927,[13,33,45,57,69,81,93,105,117,129,141,152,164,176,188,200,212,224,235,247,259,271,283,295,307,319,331,341,353,365,377,389,399,411,423,435,447,459,471,480,490,502,510,522,534,544,556,564,574,586],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":19,"analysis":32},982316,"单选题","某项目网络进度计划中，A工作的最早开始时间为第11天，持续时间为4天，该工作有两项紧后工作 B、 C，B工作的最迟开始时间为第17天，C工作的最迟开始时间为第19天，则A工作的总时差为()天。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","2",true,{"key":23,"text":24,"correct":25},"B","4",false,{"key":27,"text":28,"correct":25},"C","6",{"key":30,"text":31,"correct":25},"D","8","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":27,"analysis":32},982317,"已知某起点节点引出的工作的持续时间为4天，其最早开始时间为第18天，最迟开始时间为第21天，则该工作的最早完成时间为第()天。",[37,39,41,43],{"key":19,"text":38,"correct":25},"18",{"key":23,"text":40,"correct":25},"21",{"key":27,"text":42,"correct":21},"22",{"key":30,"text":44,"correct":25},"25",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":19,"analysis":32},982318,"下列衡量项目质量的指标中，可为客户进行产品选择提供灵活性的是()。",[49,51,53,55],{"key":19,"text":50,"correct":21},"产品特点",{"key":23,"text":52,"correct":25},"产品性能",{"key":27,"text":54,"correct":25},"产品全面性",{"key":30,"text":56,"correct":25},"产品科学性",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":23,"analysis":32},982319,"项目质量管理过程中，编制质量计划的主要目的是()。",[61,63,65,67],{"key":19,"text":62,"correct":25},"分析和判断影响质量的主次关系",{"key":23,"text":64,"correct":21},"确定项目应达到的质量标准",{"key":27,"text":66,"correct":25},"建立质量缺陷的应急响应体系",{"key":30,"text":68,"correct":25},"组建项目策划团队",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":30,"analysis":32},982320,"关于项目利益相关方的特点，下列说法错误的是()。",[73,75,77,79],{"key":19,"text":74,"correct":25},"不同利益相关方在项目中的责任和职权各不相同，并且随项目生命周期的进展而变化",{"key":23,"text":76,"correct":25},"利益相关方的识别过程是一个持续的过程，一次性完全识别有一定的难度",{"key":27,"text":78,"correct":25},"利益相关方对项目的利益诉求可能是冲突的",{"key":30,"text":80,"correct":21},"利益相关方对项目的影响是负面的",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":23,"analysis":32},982321,"下列关于横道图的说法错误的是()。",[85,87,89,91],{"key":19,"text":86,"correct":25},"横道图又称甘特图",{"key":23,"text":88,"correct":21},"横道图是一种三维立体图",{"key":27,"text":90,"correct":25},"横维表示时间的刻度",{"key":30,"text":92,"correct":25},"常以线条或横道来代表工作包及其活动时间",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":23,"analysis":32},982322,"在项目风险管理中，可采用的应对办法不包括()。",[97,99,101,103],{"key":19,"text":98,"correct":25},"规避风险",{"key":23,"text":100,"correct":21},"消解风险",{"key":27,"text":102,"correct":25},"减轻风险",{"key":30,"text":104,"correct":25},"接受风险",{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":27,"analysis":32},982323,"服务项目质量管理中，要求咨询成果应符合业主及项目的实际情况，能为业主带来真正收益。下列指标中，反映该要求的质量指标是()。",[109,111,113,115],{"key":19,"text":110,"correct":25},"持久性",{"key":23,"text":112,"correct":25},"可靠性",{"key":27,"text":114,"correct":21},"适用性",{"key":30,"text":116,"correct":25},"一致性",{"id":118,"libraryId":5,"type":9,"typeLabel":15,"stem":119,"options":120,"answer":30,"analysis":32},982324,"利益相关方分类方法中，()是根据项目利益相关方的权力（也即施加自己意愿的能力）、紧急程度（需要立即关注）和合法性（有权参与），对项目利益相关方分类。",[121,123,125,127],{"key":19,"text":122,"correct":25},"权力\u002F利益矩阵",{"key":23,"text":124,"correct":25},"权力\u002F影响矩阵",{"key":27,"text":126,"correct":25},"影响\u002F作用矩阵",{"key":30,"text":128,"correct":21},"凸显模型",{"id":130,"libraryId":5,"type":9,"typeLabel":15,"stem":131,"options":132,"answer":30,"analysis":32},982325,"项目人力资源管理的工作过程不包括()。",[133,135,137,139],{"key":19,"text":134,"correct":25},"制订人力资源计划",{"key":23,"text":136,"correct":25},"组建项目团队",{"key":27,"text":138,"correct":25},"管理项目团队",{"key":30,"text":140,"correct":21},"人员社会保障计划",{"id":142,"libraryId":5,"type":9,"typeLabel":15,"stem":143,"options":144,"answer":23,"analysis":32},982326,"某项目在进行技术论证时，决定采用成熟的技术路径代替原计划采用的尚处于试验阶段的技术路径，这属于项目风险应对策略中的()。",[145,147,148,150],{"key":19,"text":146,"correct":25},"风险降低",{"key":23,"text":98,"correct":21},{"key":27,"text":149,"correct":25},"风险转移",{"key":30,"text":151,"correct":25},"风险自留",{"id":153,"libraryId":5,"type":9,"typeLabel":15,"stem":154,"options":155,"answer":19,"analysis":32},982327,"项目管理第三层面的管理任务是()。",[156,158,160,162],{"key":19,"text":157,"correct":21},"整合管理",{"key":23,"text":159,"correct":25},"范围管理",{"key":27,"text":161,"correct":25},"风险管理",{"key":30,"text":163,"correct":25},"采购管理",{"id":165,"libraryId":5,"type":9,"typeLabel":15,"stem":166,"options":167,"answer":19,"analysis":32},982328,"运用科学方法对项目潜在风险进行系统归类和识别，判断哪些风险会影响项目实施的过程称为()。",[168,170,172,174],{"key":19,"text":169,"correct":21},"项目风险识别",{"key":23,"text":171,"correct":25},"规划风险管理",{"key":27,"text":173,"correct":25},"定性风险分析",{"key":30,"text":175,"correct":25},"监控风险",{"id":177,"libraryId":5,"type":9,"typeLabel":15,"stem":178,"options":179,"answer":30,"analysis":32},982329,"双代号网路计划中的关键路径是()。",[180,182,184,186],{"key":19,"text":181,"correct":25},"总时差为零的路径",{"key":23,"text":183,"correct":25},"总的工作持续时间最短的路径",{"key":27,"text":185,"correct":25},"一经确定，不会发生转移的路径",{"key":30,"text":187,"correct":21},"持续时间最长的路径",{"id":189,"libraryId":5,"type":9,"typeLabel":15,"stem":190,"options":191,"answer":19,"analysis":32},982330,"对从项目组织外部获取资源或服务的过程进行管理的活动称为()。",[192,194,196,198],{"key":19,"text":193,"correct":21},"项目采购管理",{"key":23,"text":195,"correct":25},"项目沟通管理",{"key":27,"text":197,"correct":25},"项目人力资源管理",{"key":30,"text":199,"correct":25},"项目风险管理",{"id":201,"libraryId":5,"type":9,"typeLabel":15,"stem":202,"options":203,"answer":30,"analysis":32},982331,"关于网络图绘制的基本规则，下列说法不正确的是()。",[204,206,208,210],{"key":19,"text":205,"correct":25},"网络图的流向一般是从左向右",{"key":23,"text":207,"correct":25},"节点代表事件",{"key":27,"text":209,"correct":25},"一项工作必须等到与它相连的所有紧前工作结束后才能开始",{"key":30,"text":211,"correct":21},"网络图中可以出现循环回路",{"id":213,"libraryId":5,"type":9,"typeLabel":15,"stem":214,"options":215,"answer":19,"analysis":32},982332,"进度绩效指数SPI＞1时，()。",[216,218,220,222],{"key":19,"text":217,"correct":21},"表示实际进度比计划进度快，进度提前",{"key":23,"text":219,"correct":25},"表示实际进度比计划进度慢，进度延期",{"key":27,"text":221,"correct":25},"表示实际进度等于计划进度",{"key":30,"text":223,"correct":25},"无法比较实际进度与计划进度",{"id":225,"libraryId":5,"type":9,"typeLabel":15,"stem":226,"options":227,"answer":30,"analysis":32},982333,"项目管理的中心任务是()。",[228,230,232,233],{"key":19,"text":229,"correct":25},"项目整合管理",{"key":23,"text":231,"correct":25},"项目质量管理",{"key":27,"text":199,"correct":25},{"key":30,"text":234,"correct":21},"项目进度管理",{"id":236,"libraryId":5,"type":9,"typeLabel":15,"stem":237,"options":238,"answer":30,"analysis":32},982334,"对每项作业活动将发生的成本进行估计，结合作业活动清单和进度计划的安排，又可以进行()的预测和统计分析。",[239,241,243,245],{"key":19,"text":240,"correct":25},"工作量",{"key":23,"text":242,"correct":25},"实际成本",{"key":27,"text":244,"correct":25},"项目采购",{"key":30,"text":246,"correct":21},"现金流",{"id":248,"libraryId":5,"type":9,"typeLabel":15,"stem":249,"options":250,"answer":30,"analysis":32},982335,"在项目信息沟通中，可将信息分级采取不同的沟通形式，下列各项不属于这些沟通形式的是()。",[251,253,255,257],{"key":19,"text":252,"correct":25},"正式沟通",{"key":23,"text":254,"correct":25},"非正式沟通",{"key":27,"text":256,"correct":25},"口头沟通",{"key":30,"text":258,"correct":21},"间接沟通",{"id":260,"libraryId":5,"type":9,"typeLabel":15,"stem":261,"options":262,"answer":27,"analysis":32},982336,"在项目时间管理中，需要确定项目各项工作的开始时间和结束时间的工作过程是()。",[263,265,267,269],{"key":19,"text":264,"correct":25},"排列活动顺序",{"key":23,"text":266,"correct":25},"估算活动资源",{"key":27,"text":268,"correct":21},"制订进度计划",{"key":30,"text":270,"correct":25},"控制进度",{"id":272,"libraryId":5,"type":9,"typeLabel":15,"stem":273,"options":274,"answer":23,"analysis":32},982337,"项目时间管理中，各工作过程会形成不同的成果，其中，项目网络图是()过程的成果。",[275,277,279,281],{"key":19,"text":276,"correct":25},"工作定义",{"key":23,"text":278,"correct":21},"工作排序",{"key":27,"text":280,"correct":25},"工作时间估计",{"key":30,"text":282,"correct":25},"工作分解",{"id":284,"libraryId":5,"type":9,"typeLabel":15,"stem":285,"options":286,"answer":23,"analysis":32},982338,"下列各项中，不属于工作分解结构步骤的是()。",[287,289,291,293],{"key":19,"text":288,"correct":25},"确定每个可交付成果的详细程度",{"key":23,"text":290,"correct":21},"估算分解持续时间",{"key":27,"text":292,"correct":25},"确定可交付成果的组成元素",{"key":30,"text":294,"correct":25},"核实分解的正确性",{"id":296,"libraryId":5,"type":9,"typeLabel":15,"stem":297,"options":298,"answer":30,"analysis":32},982339,"决策树的结构不包括()。",[299,301,303,305],{"key":19,"text":300,"correct":25},"决策节点",{"key":23,"text":302,"correct":25},"状态节点",{"key":27,"text":304,"correct":25},"结果节点",{"key":30,"text":306,"correct":21},"时间节点",{"id":308,"libraryId":5,"type":9,"typeLabel":15,"stem":309,"options":310,"answer":23,"analysis":32},982340,"项目范围管理过程中，制订项目和产品详细描述的过程是()。",[311,313,315,317],{"key":19,"text":312,"correct":25},"收集需求",{"key":23,"text":314,"correct":21},"定义范围",{"key":27,"text":316,"correct":25},"创建工作分解结构",{"key":30,"text":318,"correct":25},"控制范围",{"id":320,"libraryId":5,"type":9,"typeLabel":15,"stem":321,"options":322,"answer":23,"analysis":32},982341,"某工程网络计划中，工作H有两项紧后工作，最早完成时间分别为30和20，持续时间分别为10和8。若工作H的自由时差为零，则工作H的最早完成时间为()。",[323,325,327,329],{"key":19,"text":324,"correct":25},"10",{"key":23,"text":326,"correct":21},"12",{"key":27,"text":328,"correct":25},"24",{"key":30,"text":330,"correct":25},"30",{"id":332,"libraryId":5,"type":9,"typeLabel":15,"stem":333,"options":334,"answer":30,"analysis":32},982342,"下列衡量项目质量的指标中，与产品由于经济和技术原因不得不更换之前可以使用的次数相关的指标是()。",[335,336,338,340],{"key":19,"text":112,"correct":25},{"key":23,"text":337,"correct":25},"先进性",{"key":27,"text":339,"correct":25},"可维护性",{"key":30,"text":110,"correct":21},{"id":342,"libraryId":5,"type":9,"typeLabel":15,"stem":343,"options":344,"answer":23,"analysis":32},982343,"成本控制系统以()为基础。",[345,347,349,351],{"key":19,"text":346,"correct":25},"范围衡量指标",{"key":23,"text":348,"correct":21},"绩效衡量指标",{"key":27,"text":350,"correct":25},"进度衡量指标",{"key":30,"text":352,"correct":25},"风险衡量指标",{"id":354,"libraryId":5,"type":9,"typeLabel":15,"stem":355,"options":356,"answer":23,"analysis":32},982344,"在项目质量管理中，编制质量计划的主要依据不包括()。",[357,359,361,363],{"key":19,"text":358,"correct":25},"项目范围",{"key":23,"text":360,"correct":21},"项目费用计划",{"key":27,"text":362,"correct":25},"质量方案",{"key":30,"text":364,"correct":25},"技术标准和规划",{"id":366,"libraryId":5,"type":9,"typeLabel":15,"stem":367,"options":368,"answer":19,"analysis":32},982345,"某工程网络图如图2-2所示，图中错误的是()。",[369,371,373,375],{"key":19,"text":370,"correct":21},"有多个起点节点",{"key":23,"text":372,"correct":25},"有多个终点节点",{"key":27,"text":374,"correct":25},"有双向箭头联线",{"key":30,"text":376,"correct":25},"有循环回路",{"id":378,"libraryId":5,"type":9,"typeLabel":15,"stem":379,"options":380,"answer":27,"analysis":32},982346,"费用绩效指数()时，表示实际费用高于预算。",[381,383,385,387],{"key":19,"text":382,"correct":25},"大于1",{"key":23,"text":384,"correct":25},"等于1",{"key":27,"text":386,"correct":21},"小于1",{"key":30,"text":388,"correct":25},"大于",{"id":390,"libraryId":5,"type":9,"typeLabel":15,"stem":391,"options":392,"answer":23,"analysis":32},982347,"将项目各阶段、各领域工作过程的具体目标和任务同项目管理总体目标综合起来的管理活动称为()。",[393,395,396,398],{"key":19,"text":394,"correct":25},"项目范围管理",{"key":23,"text":229,"correct":21},{"key":27,"text":397,"correct":25},"项目成本管理",{"key":30,"text":231,"correct":25},{"id":400,"libraryId":5,"type":9,"typeLabel":15,"stem":401,"options":402,"answer":30,"analysis":32},982348,"下列关于挣值分析基本参数的说法错误的是()。 A、计划价值（PV），又称计划工作量预算费用 B、实际成本(A",[403,405,407,409],{"key":19,"text":404,"correct":25},"的计算公式为、AC=已完成工作量*实际价格",{"key":23,"text":406,"correct":25},"实际成本(A",{"key":27,"text":408,"correct":25},"主要反映项目执行的实际消耗指标",{"key":30,"text":410,"correct":21},"挣值(EV)的计算公式为、EV=计划工作量*预算价格",{"id":412,"libraryId":5,"type":9,"typeLabel":15,"stem":413,"options":414,"answer":19,"analysis":32},982349,"下列方法中，常用来表示进度计划的是()。",[415,417,419,421],{"key":19,"text":416,"correct":21},"甘特图",{"key":23,"text":418,"correct":25},"因果分析图",{"key":27,"text":420,"correct":25},"流程图",{"key":30,"text":422,"correct":25},"雷达图",{"id":424,"libraryId":5,"type":9,"typeLabel":15,"stem":425,"options":426,"answer":19,"analysis":32},982350,"工程网络计划执行过程中，如果某项工作实际进度拖延的时间超过其自由时差，则该工作()。",[427,429,431,433],{"key":19,"text":428,"correct":21},"必定影响其紧后工作的最早开始",{"key":23,"text":430,"correct":25},"必定变为关键工作",{"key":27,"text":432,"correct":25},"必定导致其后续工作的完成时间推迟",{"key":30,"text":434,"correct":25},"必定影响工程总工期",{"id":436,"libraryId":5,"type":9,"typeLabel":15,"stem":437,"options":438,"answer":19,"analysis":32},982351,"关于单代号网络图，下列说法不正确的是（）。",[439,441,443,445],{"key":19,"text":440,"correct":21},"箭线表示时间和资源",{"key":23,"text":442,"correct":25},"节点表示工作",{"key":27,"text":444,"correct":25},"节点一般以圆圈或矩形表示",{"key":30,"text":446,"correct":25},"要标注工作名称、工作代号和持续时间",{"id":448,"libraryId":5,"type":9,"typeLabel":15,"stem":449,"options":450,"answer":19,"analysis":32},982352,"项目利益相关方众多，最主要的是()。",[451,453,455,457],{"key":19,"text":452,"correct":21},"项目经理",{"key":23,"text":454,"correct":25},"业主\u002F客户",{"key":27,"text":456,"correct":25},"项目团队",{"key":30,"text":458,"correct":25},"职能经理",{"id":460,"libraryId":5,"type":9,"typeLabel":15,"stem":461,"options":462,"answer":27,"analysis":32},982353,"下列分析方法中，可用来分析项目质量缺陷产生原因的是()。",[463,465,467,469],{"key":19,"text":464,"correct":25},"控制图法",{"key":23,"text":466,"correct":25},"直方图法",{"key":27,"text":468,"correct":21},"鱼骨图法",{"key":30,"text":470,"correct":25},"排列图法",{"id":472,"libraryId":5,"type":9,"typeLabel":15,"stem":473,"options":474,"answer":30,"analysis":32},982354,"下列衡量项目质量的指标中，反映产品或服务的设计和运作特征是否符合现有标准的程度的指标是()。",[475,476,477,479],{"key":19,"text":112,"correct":25},{"key":23,"text":114,"correct":25},{"key":27,"text":478,"correct":25},"科学性",{"key":30,"text":116,"correct":21},{"id":481,"libraryId":5,"type":9,"typeLabel":15,"stem":482,"options":483,"answer":27,"analysis":32},982355,"双代号网络计划如图2-5所示（时间单位：天），其关键路径有()条。",[484,485,487,488],{"key":19,"text":24,"correct":25},{"key":23,"text":486,"correct":25},"5",{"key":27,"text":28,"correct":21},{"key":30,"text":489,"correct":25},"7",{"id":491,"libraryId":5,"type":9,"typeLabel":15,"stem":492,"options":493,"answer":30,"analysis":32},982356,"依据中国项目管理知识体系(C-PMBOK)所提出的项目管理的九大管理任务，项目范围管理的关键是()。",[494,496,498,500],{"key":19,"text":495,"correct":25},"质量管理",{"key":23,"text":497,"correct":25},"费用管理",{"key":27,"text":499,"correct":25},"确保项目完成按照规定、计划或要求所必须要做的全部工作",{"key":30,"text":501,"correct":21},"识别和控制哪些工作应该包括在项目之内，哪些工作不应该包括在项目之内",{"id":503,"libraryId":5,"type":9,"typeLabel":15,"stem":504,"options":505,"answer":23,"analysis":32},982357,"网络图中有()个时间参数。",[506,507,508,509],{"key":19,"text":486,"correct":25},{"key":23,"text":28,"correct":21},{"key":27,"text":489,"correct":25},{"key":30,"text":31,"correct":25},{"id":511,"libraryId":5,"type":9,"typeLabel":15,"stem":512,"options":513,"answer":19,"analysis":32},982358,"项目人力资源管理包括外在因素的管理和内在因素的管理两个方面。下列工作内容中，属于内在因素管理的是()。",[514,516,518,520],{"key":19,"text":515,"correct":21},"调动和发挥人的主观能动性，做到人尽其用",{"key":23,"text":517,"correct":25},"制定组织规划，明确项目成员分工",{"key":27,"text":519,"correct":25},"合理调配人力资源，满足项目工作需要",{"key":30,"text":521,"correct":25},"将项目归类成组，采用项目群管理方式",{"id":523,"libraryId":5,"type":9,"typeLabel":15,"stem":524,"options":525,"answer":23,"analysis":32},982359,"项目成本管理可分为三个阶段性的工作，其目的是()。",[526,528,530,532],{"key":19,"text":527,"correct":25},"保证项目质量",{"key":23,"text":529,"correct":21},"确定项目范围",{"key":27,"text":531,"correct":25},"降低项目风险",{"key":30,"text":533,"correct":25},"确保项目进度",{"id":535,"libraryId":5,"type":9,"typeLabel":15,"stem":536,"options":537,"answer":27,"analysis":32},982360,"在项目质量管理中，了解顾客对产品()的需求，设计满足这些需求的产品或服务是质量竞争的关键要素。",[538,539,540,542],{"key":19,"text":112,"correct":25},{"key":23,"text":110,"correct":25},{"key":27,"text":541,"correct":21},"性能",{"key":30,"text":543,"correct":25},"美观性",{"id":545,"libraryId":5,"type":9,"typeLabel":15,"stem":546,"options":547,"answer":19,"analysis":32},982361,"()是根据以往类似项目或从其他渠道积累的历史信息与知识，编制出与项目相关的全部潜在风险的集合。",[548,550,552,554],{"key":19,"text":549,"correct":21},"核检表法",{"key":23,"text":551,"correct":25},"风险分解结构",{"key":27,"text":553,"correct":25},"风险概率和影响矩阵",{"key":30,"text":555,"correct":25},"决策树",{"id":557,"libraryId":5,"type":9,"typeLabel":15,"stem":558,"options":559,"answer":27,"analysis":32},982362,"下列各项中，影响产品维护和停工持续时间内所发生成本的指标是()。",[560,561,562,563],{"key":19,"text":541,"correct":25},{"key":23,"text":339,"correct":25},{"key":27,"text":112,"correct":21},{"key":30,"text":114,"correct":25},{"id":565,"libraryId":5,"type":9,"typeLabel":15,"stem":566,"options":567,"answer":19,"analysis":32},982363,"在项目进度管理中，为具有合适的精细度和层级划分、可完整描述项目全部工作与进度的活动清单以及活动属性是()的成果。",[568,570,571,572],{"key":19,"text":569,"correct":21},"定义活动",{"key":23,"text":264,"correct":25},{"key":27,"text":266,"correct":25},{"key":30,"text":573,"correct":25},"制定进度计划",{"id":575,"libraryId":5,"type":9,"typeLabel":15,"stem":576,"options":577,"answer":19,"analysis":32},982364,"决定WBS详细程度和层次多少的主要因素，主要是涉及项目参与者的()。",[578,580,582,584],{"key":19,"text":579,"correct":21},"责任能力和对项目的控制能力",{"key":23,"text":581,"correct":25},"筹资能力和对项目的控制能力",{"key":27,"text":583,"correct":25},"责任能力和对项目的熟悉程度",{"key":30,"text":585,"correct":25},"筹资能力和对项目的熟悉程度",{"id":587,"libraryId":5,"type":9,"typeLabel":15,"stem":588,"options":589,"answer":30,"analysis":32},982365,"由于缺乏关于项目的其他质量绩效指标的确切信息，消费者对项目质量的判断是基于()的考虑。",[590,591,592,593],{"key":19,"text":114,"correct":25},{"key":23,"text":543,"correct":25},{"key":27,"text":112,"correct":25},{"key":30,"text":594,"correct":21},"感知质量",[596,599,602,605,608,611],{"id":9,"name":597,"category":7,"favorite":598},"领导干部任职前廉政法规知识测试题",92,{"id":600,"name":601,"category":7,"favorite":9},595,"建筑结构与设备",{"id":603,"name":604,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":606,"name":607,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":609,"name":610,"category":7,"favorite":8},534,"BIM工程师",{"id":612,"name":610,"category":7,"favorite":8},535]