[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983241":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983241,712,2,"多选题","技术交易合同中，期得利润的估算的含义包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","由降低成本而产生的新增利润",true,{"key":16,"text":17,"correct":18},"B","由提高效率而产生的销售额的增加",false,{"key":20,"text":21,"correct":14},"C","由提高产品质量和性能而增加的利润",{"key":23,"text":24,"correct":14},"D","销售额增加带来的新增利润",{"key":26,"text":27,"correct":18},"E","产品品牌忠诚度提升而使价格提高","ACD","技术价格的确定包括成本构成和期得利润的估算。其中，期得利润的估算的含义有：①由降低成本而产生的新增利润；②由提高产品质量和性能而增加的利润；③销售额增加带来的新增利润。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]