[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983230":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983230,712,2,"多选题","从工程项目全过程管理的层次上看，可以把项目管理分为项目()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","高层管理",false,{"key":16,"text":17,"correct":18},"B","执行管理",true,{"key":20,"text":21,"correct":18},"C","决策管理",{"key":23,"text":24,"correct":14},"D","中层管理",{"key":26,"text":27,"correct":14},"E","基层管理","BC","从工程项目全过程管理的层次上看，可以把项目管理分为项目决策管理和项目执行管理两个层次。项目决策管理主要是指项目投资者，贷款的银行以及其他的项目资金提供者等对项目的管理，项目执行管理是指项目实施的执行机构对项目的管理，主要是项目法人对项目的管理。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]