[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983214":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983214,712,2,"多选题","下列关于质量计划的表述，正确的有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","同一工序制造出来的产品质量差异较小，不需要制定质量计划",false,{"key":16,"text":17,"correct":18},"B","企业一般按照设立质量控制点的方法，进行重点工序质量控制",true,{"key":20,"text":21,"correct":18},"C","质量计划是提高产品质量工作水平的依据",{"key":23,"text":24,"correct":18},"D","产品质量计划的制订需要企业各部门以及企业员工的广泛参与",{"key":26,"text":27,"correct":18},"E","产品质量计划是企业各部门和各生产环节质量管理工作的行动纲领","BCDE","产品质量计划的制定需要企业各部门以及企业员工的广泛参与。即使在标准生产状态下，同一工序制造出来的同一种零件的特性值仍存在着差异，即产品质量的波动现象。对于关键工序和特殊工序，企业一般按照设立质量控制点的方法，进行重点工序质量控制。对于其他工序也要按照首检、巡检、完工检等程序，应用器具检验和感官检验两种方法进行货物的专职质量检验控制。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]