[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983200":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983200,712,2,"多选题","按工业化生产的货物从生产到进入流通领域并最终被消费，需要经过产品()，直至大规模制造的完整生产过程。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","设计",true,{"key":16,"text":17,"correct":14},"B","策划",{"key":19,"text":20,"correct":14},"C","研发",{"key":22,"text":23,"correct":24},"D","销售",false,{"key":26,"text":27,"correct":14},"E","单件或小批量试制","ABCE","按工业化生产的货物从生产到进入流通领域并最终被消费，需要经过产品策划、研发、设计、单件或小批量试制，直至大规模制造的完整生产过程，整个生产过程的管理行为从最初的项目工作方式，逐渐转向基于项目的工作方式，到最终可能的大规模生产的运行管理方式。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]