[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983186":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983186,712,2,"多选题","生产制造企业对建立了质量管理体系认证的供应商进行体系审核时，主要从供应商的()等方面进行供应商的综合评估。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","合作经验",true,{"key":16,"text":17,"correct":14},"B","质量管理体系",{"key":19,"text":20,"correct":21},"C","赢利水平",false,{"key":23,"text":24,"correct":14},"D","履约能力",{"key":26,"text":27,"correct":14},"E","技术和服务能力","ABDE","生产制造企业对建立了质量管理体系认证或者其他相关体系的供应商进行体系审核时，应从供应商的合作经验、质量管理体系、质量保证能力、履约能力、技术和服务能力等方面进行供应商的综合评估。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]