[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983108":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983108,712,2,"多选题","工程施工质量的监控主体有()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","建设单位",true,{"key":16,"text":17,"correct":14},"B","设计单位",{"key":19,"text":20,"correct":21},"C","供应单位",false,{"key":23,"text":24,"correct":21},"D","施工单位",{"key":26,"text":27,"correct":14},"E","政府","ABE","施工阶段的质量自控主体是施工单位和供应单位，对施工质量负有主要责任。施工质量的监控主体是建设单位、监理、设计单位及政府，他们在施工阶段依据法律和合同对自控主体的质量行为和效果实施监督控制。@##",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]