[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983100":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983100,712,2,"多选题","工程建设项目施工阶段的施工技术风险因素主要包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","缺陷设计，错误和遗漏",false,{"key":16,"text":17,"correct":18},"B","应用新技术新方案的失败",true,{"key":20,"text":21,"correct":14},"C","规范不恰当，未考虑地质条件",{"key":23,"text":24,"correct":18},"D","不合理的施工技术和方案",{"key":26,"text":27,"correct":18},"E","考虑现场情况不周","BDE","工程建设项目施工阶段的技术风险因素主要包括：①施工工艺的落后；②不合理的施工技术和方案；③施工安全措施不当；④应用新技术新方案的失败；⑤考虑现场情况不周。AC两项属于建设项目施工阶段的设计技术风险因素。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]