[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983086":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983086,712,2,"多选题","施工图设计文件的审查中，内部审查包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","控制施工图与初步设计的正常衔接",true,{"key":16,"text":17,"correct":18},"B","设计规模是否达到规定的标准",false,{"key":20,"text":21,"correct":14},"C","施工图是否能够满足工程设计任务书及类似配套文件（如设计与施工技术标准）的要求",{"key":23,"text":24,"correct":14},"D","各专业图纸本身是否存在设计错误，分专业施工图之间是否存在冲突",{"key":26,"text":27,"correct":14},"E","是否按业主提出的“招标图纸”要求，按工程分解结构（合同网络图）分别出图","ACDE","施工图设计文件的审查分为外审与内审两种类型。其中，内部审查，由业主或其聘请的项目管理咨询单位进行审查，审查重点包括：①控制施工图与初步设计的正常衔接；②设计深度是否达到规定的标准；③施工图是否能够满足工程设计任务书及类似配套文件（如设计与施工技术标准）的要求；④各专业图纸本身是否存在设计错误，分专业施工图之间是否存在冲突；⑤是否按业主提出的“招标图纸”要求，按工程分解结构（合同网络图）分别出图。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]