[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983066":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983066,712,2,"多选题","在建设项目经济费用效益分析中，根据费用和效益与项目联系的紧密程度，可分为()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","转移支付",true,{"key":16,"text":17,"correct":14},"B","直接费用",{"key":19,"text":20,"correct":21},"C","经济费用",false,{"key":23,"text":24,"correct":14},"D","直接效益",{"key":26,"text":27,"correct":14},"E","间接效益","ABDE","在建设项目经济费用效益分析中，根据费用和效益与项目联系的紧密程度，可分为直接效益与直接费用、间接效益与间接费用及转移支付。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]