[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983062":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983062,712,2,"多选题","一般工程建设项目，项目勘察需要进行()。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","可研勘察",true,{"key":16,"text":17,"correct":14},"B","初设勘察",{"key":19,"text":20,"correct":14},"C","详细勘察",{"key":22,"text":23,"correct":14},"D","施工勘察",{"key":25,"text":26,"correct":27},"E","竣工勘察",false,"ABCD","项目勘察往往需要经过基于建设项目选址的可研勘察、基于方案设计进行的初设勘察，以及基于初步设计进行的详细勘察，必要时还需要基于施工图设计及地基施工的初步设想进行施工勘察。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]