[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983051":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983051,712,2,"多选题","在施工现场的组织与协调阶段，业主应该()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","控制项目工程进度",false,{"key":16,"text":17,"correct":18},"B","建立工程协调制度",true,{"key":20,"text":21,"correct":18},"C","督促各施工单位整理并保管好各类工程技术资料，及时绘制竣工图纸",{"key":23,"text":24,"correct":18},"D","定期提供各类工程项目管理报表",{"key":26,"text":27,"correct":18},"E","组织落实工地的现场安全保卫及工程成品保护工作","BCDE","施工现场的组织与协调工作十分复杂，业主的施工综合协调工作内容必须具体、到位。具体包括：①组织项目设计交底；②建立工程协调制度；③督促各施工单位整理并保管好各类工程技术资料，及时绘制竣工图纸；④定期提供各类工程项目管理报表；⑤组织落实工地的现场安全保卫及工程成品保护工作；⑥协调处理工地的各种纠纷。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]