[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983038":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983038,712,2,"多选题","生产运营准备期间，其管理工作包括()等。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","目标计划的制定",false,{"key":16,"text":17,"correct":18},"B","管理制度建设",true,{"key":20,"text":21,"correct":18},"C","技术文件准备",{"key":23,"text":24,"correct":18},"D","物资准备",{"key":26,"text":27,"correct":18},"E","辅助条件检查","BCDE","生产运营准备期间，其管理工作包括：①生产运行人员聘用；②人员培训；③管理制度建设；④技术文件准备；⑤物资准备；⑥辅助条件检查。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]