[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983030":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983030,712,2,"多选题","项目敏感性分析中的影响因素包括()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","经济成本",true,{"key":16,"text":17,"correct":14},"B","产销量",{"key":19,"text":20,"correct":14},"C","产品价格",{"key":22,"text":23,"correct":24},"D","库存数量",false,{"key":26,"text":27,"correct":14},"E","项目投资","ABCE","项目敏感性分析中的影响因素包括：①项目投资；②项目寿命年限；③经济成本，特别是变动成本；④产品价格；⑤产销量；⑥项目建设年限、投产期限和产出水平及达产期限；⑦基准折现率；⑧项目寿命期末的资产残值。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]