[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983003":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983003,712,2,"多选题","下列项目中，一般应进行经济费用效益分析的有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","基础设施建设项目",false,{"key":16,"text":17,"correct":18},"B","国家及地方政府参与投资的项目",true,{"key":20,"text":21,"correct":18},"C","具有垄断特征的项目",{"key":23,"text":24,"correct":18},"D","外部效果显著的项目",{"key":26,"text":27,"correct":18},"E","涉及国家经济安全的项目","BCDE","应当进行经济费用效益分析的有：①具有垄断特征的项目；②具有公共产品特征的项目；③外部效果显著的项目；④稀缺资源的开发和利用项目；⑤涉及国家经济安全的项目；⑥国家及地方政府参与投资的项目。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]