[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-983002":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},983002,712,2,"多选题","一体化管理体系构建和实施主要包括()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","建立一体化的管理方针目标",true,{"key":16,"text":17,"correct":14},"B","调整组织结构",{"key":19,"text":20,"correct":14},"C","制订管理措施计划或管理方案",{"key":22,"text":23,"correct":24},"D","管理体系的运行和改进",false,{"key":26,"text":27,"correct":14},"E","确定体系文件","ABCE","一体化管理体系的构建和实施包括：①建立一体化的管理方针目标；②制订管理措施计划或管理方案；③调整组织结构，确定体系文件；④实施全员的培训工作；⑤保证信息的沟通和交流；⑥识别并提供实现管理目标和持续改进所需的资源；⑦进行专项措施和方案的策划和实施；⑧实施测量、分析和改进。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]