[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982966":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},982966,712,2,"多选题","工程建设项目的设计依据主要包括()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","方案设计任务书",true,{"key":16,"text":17,"correct":14},"B","工程设计任务书",{"key":19,"text":20,"correct":14},"C","“技术设计”要求",{"key":22,"text":23,"correct":24},"D","招标计划书",false,{"key":26,"text":27,"correct":24},"E","方案设计的选定","ABC","工程建设项目的设计依据主要包括：①方案设计任务书；②工程设计任务书；③“技术设计”要求；④其他配套技术与经济要求。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]