[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982945":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},982945,712,2,"多选题","在项目组合管理中实现平衡的含义有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","组织目标与项目之间的平衡",false,{"key":16,"text":17,"correct":18},"B","项目性质之间的平衡",true,{"key":20,"text":21,"correct":14},"C","项目时间上的平衡",{"key":23,"text":24,"correct":14},"D","项目组合与周围环境之间的平衡",{"key":26,"text":27,"correct":18},"E","资源配置之间的平衡","BE","在项目组合管理过程中，不同类型的项目在项目组合中的平衡是一个关键的问题。在项目组合管理中实现平衡包含两个层面的含义，即项目性质之间的平衡和资源配置之间的平衡，通常采用气泡图等方法来表现项目性质和资源配置上的平衡性。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]