[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982931":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},982931,712,2,"多选题","项目目标控制的要素包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","信息收集",false,{"key":16,"text":17,"correct":18},"B","实施计划",true,{"key":20,"text":21,"correct":18},"C","偏差数据",{"key":23,"text":24,"correct":18},"D","纠偏措施",{"key":26,"text":27,"correct":18},"E","纠偏行为","BCDE","项目目标控制的要素包括：①控制主体；②实施计划；③实施信息；④偏差数据；⑤纠偏措施；⑥纠偏行为等。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]