[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982921":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},982921,712,2,"多选题","标底和限价（工程项目）的控制内容包括()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","工程量",true,{"key":16,"text":17,"correct":14},"B","计价方式",{"key":19,"text":20,"correct":14},"C","暂定金约定",{"key":22,"text":23,"correct":24},"D","投标保证金约定",false,{"key":26,"text":27,"correct":24},"E","投标保证金退还","ABC","标底和限价（工程项目）的控制内容有：①工程量；②计价方式；③暂定金约定。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]