[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982901":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},982901,712,2,"多选题","关于招标采购项目管理理论，下列说法正确的有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","质量保证的主要内容是过程控制点设置",false,{"key":16,"text":17,"correct":18},"B","费用控制的主要内容有费用计划、变更控制和费用调整",true,{"key":20,"text":21,"correct":18},"C","费用预算的主要内容有资源消耗、成本分类、资源分配等",{"key":23,"text":24,"correct":18},"D","管理方案的主要内容有项目背景描述、组织机构、工作分解、责任分配等",{"key":26,"text":27,"correct":18},"E","质量保证的主要内容有质量保证体系、招标方式、招标组织形式以及工作流程","BCDE","A项，质量控制的主要内容包括：①手段；②措施和方法；③质量控制程序；④过程；⑤控制点设置。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]