[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982827":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},982827,712,2,"多选题","关于项目成本管理常用工具，下列说法错误的有()。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","类比估算法是与已完成的类似项目进行类比",false,{"key":16,"text":17,"correct":14},"B","自上而下估算的基础是收集上层和中层管理人员的经验和判断",{"key":19,"text":20,"correct":21},"C","自上而下估算在有类似项目未完成的情况下应用",true,{"key":23,"text":24,"correct":21},"D","自下而上估算法首先从下往上估算整个项目费用",{"key":26,"text":27,"correct":14},"E","S曲线法中每一条S曲线都对应某一特定的进度计划","CD","C项，自上而下估算法在有类似项目已完成的情况下应用。D项，自下而上估算法通常首先估计项目各个独立工作的费用，然后再从下往上估算出整个项目费用。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]