[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982816":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},982816,712,2,"多选题","责任矩阵是项目人力资源管理工具，下列说法正确的有()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","责任矩阵是一种将工作分解结构与项目组织结构建立起对应关系的结构",true,{"key":16,"text":17,"correct":14},"B","责任矩阵以工作元素为行，组织单元为列，矩阵中的符号表示项目工作人员在每个工作单元中的参与角色或责任",{"key":19,"text":20,"correct":14},"C","责任矩阵建立在工作分解结构和项目组织结构确定之后，是项目工作的落实环节，也是项目计划控制和考核的依据",{"key":22,"text":23,"correct":24},"D","责任矩阵能够较清楚地反映出项目各工作部门或个人之间的工作责任和相互关系，但制作较难",false,{"key":26,"text":27,"correct":14},"E","责任矩阵可以使用在WBS的任何层次","ABCE","D项，由于责任矩阵是由线条、符号和简洁文字组成的图表，不但易于制作和解读，而且能够较清楚地反映出项目各工作部门或个人之间的工作责任和相互关系。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]