[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982804":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},982804,712,2,"多选题","项目范围确认的工作依据包括()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","项目相关文件",true,{"key":16,"text":17,"correct":18},"B","项目质量要求",false,{"key":20,"text":21,"correct":18},"C","项目施工流程",{"key":23,"text":24,"correct":14},"D","第三方评价",{"key":26,"text":27,"correct":14},"E","实际工作成果","ADE","项目范围确认是指对项目执行过程中完成的各项工作或形成的可交付成果进行校验和接受。项目范围确认过程要求对项目在执行过程中完成的各项工作进行及时检查，确保正确、满意地完成项目范围定义提及的全部工作。范围确认的工作依据包括实际工作成果、项目相关文件、第三方评价等。范围确认的结果是对项目工作完成成果的正式接受。",{"id":6,"name":31,"category":32,"favorite":33},"招标采购项目管理","建筑工程",0]