[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982735":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},982735,712,1,"单选题","下列服务项目合同条件中，咨询服务方承担风险最大的是()合同。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","成本加酬金",false,{"key":16,"text":17,"correct":14},"B","时间加材料",{"key":19,"text":20,"correct":21},"C","固定总价",true,{"key":23,"text":24,"correct":14},"D","可调总价","总价合同有固定总价合同和可调总价合同两种。固定总价合同是指合同价格是固定不变的，不随着项目环境的变化而变化。在这种合同模式下，项目服务方往往承担了合同实施过程中出现的风险，委托方不承担任何的风险。但是，当服务方遇到了无法预测和应对的重大风险时，委托方的利益也会因为服务方无法完成服务项目目标受到影响甚至伤害，所以对于风险较大，技术复杂且不成熟，环境多变的服务项目不适宜采用固定总价合同。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]