[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982709":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},982709,712,1,"单选题","物流服务项目的最终成果是以()的形式出来。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","无形服务",false,{"key":16,"text":17,"correct":14},"B","实物产品",{"key":19,"text":20,"correct":14},"C","运输服务",{"key":22,"text":23,"correct":24},"D","实现物品的时间或空间效用",true,"物流服务项目的主要内容是物体的物理位移，其中也还包含一些其他的物理加工与保管等方面的内容，但是最主要的是将某些物料或产品从生产经营之处挪移到使用或保存之处。因此物流服务项目的最终成果是以实现物品的时间或空间效用的形式表现出来，而不是以实物产品的形式存在的。物流服务项目成果的物理特征决定了对其成果的评价较为困难。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]