[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982669":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},982669,712,1,"单选题","关系到企业是否能够按照合约规定交货，进而决定企业在市场上声誉的是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","生产能力",false,{"key":16,"text":17,"correct":18},"B","生产进度计划与控制能力",true,{"key":20,"text":21,"correct":14},"C","生产工艺管理能力",{"key":23,"text":24,"correct":14},"D","生产质量管理能力","生产进度计划与控制能力关系到企业是否能够按照合约规定交货，进而决定了企业在市场上的声誉。生产进度控制贯穿整个狭义的生产过程，从生产技术准备开始到产成品报交入库为止。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]