[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982650":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},982650,712,1,"单选题","当初步设计较深、有详细的设备清单时，编制设备及安装工程概算适用的方法是()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","预算单价法",true,{"key":16,"text":17,"correct":18},"B","扩大单价法",false,{"key":20,"text":21,"correct":18},"C","概算指标法",{"key":23,"text":24,"correct":18},"D","设备价值百分率法","预算单价法是当初步设计较深，有详细的设备清单时，可直接按安装工程预算定额单价编制安装工程概算，概算编制程序基本同于安装工程施工图预算。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]