[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982645":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},982645,712,1,"单选题","工程量计量和合同价款支付多采用()的模式。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","“预支过半，最终结算”",false,{"key":16,"text":17,"correct":18},"B","“阶段小结、最终结清”",true,{"key":20,"text":21,"correct":14},"C","“一次付清”",{"key":23,"text":24,"correct":14},"D","“按月结算”","建设工程项目一般具有投资巨大、施工周期长等特点，工程量计量和合同价款支付多采用“阶段小结、最终结清”的模式。其中，工程量计量可选择按月计量或按工程形象进度分段计量，具体计量周期应在合同中加以约定。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]