[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982640":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},982640,712,1,"单选题","关于国际惯例与国内传统两种管理方式工程建设项目的设计对应，下列叙述错误的是()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","方案设计\u002F工程方案大致对应于概要设计\u002FSD",false,{"key":16,"text":17,"correct":14},"B","初步设计大致对应于扩展设计\u002FDD",{"key":19,"text":20,"correct":14},"C","施工图设计大致对应于施工文件\u002FCD",{"key":22,"text":23,"correct":24},"D","概念设计大致对应于SD概要设计",true,"国际惯例与国内传统两种管理方式均将工程建设项目的设计过程划分为三个阶段：①阶段一：方案设计\u002F工程方案大致对应于概要设计\u002FSD；②阶段二：初步设计大致对应于扩展设计\u002FDD；③阶段三：施工图设计大致对应于施工文件\u002FCD。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]