[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-982609":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},982609,712,1,"单选题","下列关于竣工图的管理要求的说法错误的是()。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","承包单位按规定编制好竣工图并接受验收委员会对竣工图质量的检查",false,{"key":16,"text":17,"correct":14},"B","承包商（包括工程设计与施工单位）应按合同要求准时提交合格竣工图",{"key":19,"text":20,"correct":21},"C","因业主或主管部门要求变更设计的，需要重新绘制竣工图时，费用由设计单位承担",true,{"key":23,"text":24,"correct":14},"D","按图施工没有发生变动时，可由施工单位在原施工图上加盖“竣工图”标志，作为竣工图","C项，凡因业主或主管部门要求变更设计的，需要重新绘制竣工图时，应由业主绘制或由项目业主委托设计单位绘制，费用由业主在建设投资中解决。",{"id":6,"name":27,"category":28,"favorite":29},"招标采购项目管理","建筑工程",0]